BBV HS2 MWCC North - Delta Junction – TES-D0-2004-PSV-Concrete repair and demolition work | Notice | Open | 07/10/24 | Not Disclosed | 03/10/24 |
Old Oak Common - Mechanical Packages - Prequalification | Notice | Open | 09/10/24 | K: GBP 2.5m to 5m | 01/10/24 |
Old Oak Common - Public Health Packages - Prequalification | Notice | Open | 09/10/24 | K: GBP 2.5m to 5m | 01/10/24 |
BBV HS2 MWCC North - Bromford Tunnel Intemediate Shaft - Fire tank incl. Sheet piles - OMa | Notice | Open | 11/10/24 | Not Disclosed | 01/10/24 |
BBV HS2 MWCC North - Print & Reprographic Services | Notice | Open | 09/10/24 | Not Disclosed | 27/09/24 |
BBV HS2 MWCC North - Bromford Tunnel - Auger drilling - OMa | Notice | Closed | 04/10/24 | Not Disclosed | 26/09/24 |
BBV HS2 MWCC North - Supply of Compact Substations - Bromford Tunnel Cross Passages | Notice | Closed | 30/09/24 | Not Disclosed | 24/09/24 |
EKFB JV - Supply of Portable Weighbridges - Opportunity | Notice | Closed | 04/10/24 | E: GBP 50k to 100k | 20/09/24 |
HS2 C1 ALIGN JV - Amersham Highways Drainage (Supply & Install) | Notice | Closed | 27/09/24 | H: GBP 250k to 500k | 18/09/24 |
Internal Doors C4 - KCSL | Notice | Closed | 20/09/24 | J: GBP 1m to 2.5m | 13/09/24 |
Bird Deterrant Netting C4 - KCSL | Notice | Closed | 20/09/24 | G: GBP 150k to 250k | 13/09/24 |
ETFE Roofing C4 - KCSL | Notice | Closed | 20/09/24 | E: GBP 50k to 100k | 13/09/24 |
Laboratory testing of hardened properties of slurry wall material copy | Notice | Closed | 20/09/24 | Not Disclosed | 12/09/24 |
HS2 C1 ALIGN JV - Amersham Gate Supply & Install | Notice | Closed | 11/09/24 | F: GBP 100k to 150k | 04/09/24 |
HS2 C1 ALIGN JV - External Works Phase 2 | Notice | Closed | 11/09/24 | J: GBP 1m to 2.5m | 04/09/24 |
HS2 Curzon Street Station - Canteen Services | Notice | Closed | 04/09/24 | H: GBP 250k to 500k | 28/08/24 |
Ecology Services & Secondment | Notice | Closed | 30/08/24 | N: GBP 10m - 20m | 27/08/24 |
HS2 - Westgate Mechanical and Public Health Installation | Notice | Closed | 27/08/24 | H: GBP 250k to 500k | 20/08/24 |
Blockwork C4 - KCSL | Notice | Closed | 22/08/24 | I: GBP 500k to 1m | 16/08/24 |
EKFB JV - Underpass Cycle Track | Notice | Closed | 28/08/24 | I: GBP 500k to 1m | 14/08/24 |
CAT 3 Design Checks C4 - KCSL | Notice | Closed | 16/08/24 | E: GBP 50k to 100k | 13/08/24 |
CAT 3 Design Checks C4 - KCSL | Notice | Cancelled | 09/08/24 | E: GBP 50k to 100k | 12/08/24 |
EKFB JV - Accommodation Works - Civils and Highway Works | Notice | Closed | 19/08/24 | K: GBP 2.5m to 5m | 08/08/24 |
EKFB JV - Accommodation Works - Landscaping, Fencing and Gates | Notice | Closed | 19/08/24 | H: GBP 250k to 500k | 08/08/24 |
EKFB JV - Accommodation Works - Land Drainage | Notice | Closed | 19/08/24 | I: GBP 500k to 1m | 08/08/24 |
EKFB JV - Accommodation Works - Utility Works mainly water services and connections | Notice | Closed | 19/08/24 | K: GBP 2.5m to 5m | 08/08/24 |
Reinforcement Detailing Works C4 - KCSL | Notice | Closed | 13/08/24 | E: GBP 50k to 100k | 06/08/24 |
BBV HS2 MWCC North - Permanent Security Fencing | Notice | Closed | 19/08/24 | Not Disclosed | 06/08/24 |
BBV HS2 MWCC North - Delta Junction – TES-D0-1995 - B'spur - Formwork and Falsework | Notice | Closed | 12/08/24 | I: GBP 500k to 1m | 02/08/24 |
BBV HS2 MWCC North - Bromford Tunnel - Depressurization holes | Notice | Closed | 09/08/24 | Not Disclosed | 31/07/24 |
HS2 Main Works S1 & S2 - SCS Railways - Self Propelled Modular Transporter/Hydraulic Gantry Crane - WP423 | Notice | Closed | 05/08/24 | Not Disclosed | 29/07/24 |
EKFB JV - Precast concrete panels forming part of route wide acoustic barrier - NEC Subcontract Works | Notice | Closed | 02/08/24 | O: GBP 20m - 30m | 29/07/24 |
EKFB JV - Weathering steel columns (test units) forming part of route wide acoustic barrier - NEC Subcontract Works | Notice | Closed | 02/08/24 | D: GBP 25k to 50k | 26/07/24 |
Precast C4 - KCSL - Building Walls & Inverted T. Beams, Attenuation Tank, Solid Roof Slabs & upstands, Precast Stairs, Beam & Block Floor, Hollowcore Slabs | Notice | Closed | 26/07/24 | I: GBP 500k to 1m | 22/07/24 |
Piling Works C4 - KCSL | Notice | Closed | 26/07/24 | J: GBP 1m to 2.5m | 19/07/24 |
Security Clearance Services | Notice | Awarded | 23/07/24 | C: GBP 15k to 25k | 16/07/24 |
HS2 Curzon Street Station - Structural Steelwork | Notice | Closed | 22/07/24 | P: GBP 30m - 40m | 12/07/24 |
HS2 - Fire main System (Sub-subcontract Package) | Notice | Closed | 16/07/24 | G: GBP 150k to 250k | 10/07/24 |
Fit Out - WP12.9 bathroom IPS and Sanitaryware Fit Out - Old Oak Common (S4) Station | Notice | Closed | 09/08/24 | I: GBP 500k to 1m | 10/07/24 |
SP09.14 - Cranes - Old Oak Common (S4) Station | Notice | Closed | 12/07/24 | I: GBP 500k to 1m | 08/07/24 |
SP09.14 - Hoists - Old Oak Common (S4) Station | Notice | Closed | 12/07/24 | I: GBP 500k to 1m | 08/07/24 |
BBV HS2 MWCC North - Delta Junction – TES-D0 - 1980 - PSV - Permanent steel works | Notice | Closed | 11/07/24 | I: GBP 500k to 1m | 03/07/24 |
QR code management system | Notice | Closed | 04/07/24 | A: Up to GBP 5k | 28/06/24 |
Drainage Materials - Supply of Plastic Pipe & Pre Cast | Notice | Closed | 10/07/24 | R: GBP 50m - 70m | 28/06/24 |
HS2 - Westgate Lightning Protection (Sub-subcontract Package) | Notice | Closed | 30/06/24 | E: GBP 50k to 100k | 25/06/24 |
HS2 - Westgate Sump Pumps(Sub-subcontract Package) | Notice | Closed | 30/06/24 | G: GBP 150k to 250k | 25/06/24 |
EKFB JV - Mechanical & Electrical Works for Green Tunnel Portal Buildings - Power Supply System Package | Notice | Closed | 05/07/24 | H: GBP 250k to 500k | 24/06/24 |
EKFB JV - Mechanical & Electrical Works for Green Tunnel Portal Buildings - Fire Hydrant System Package | Notice | Closed | 05/07/24 | H: GBP 250k to 500k | 24/06/24 |
EKFB JV - Mechanical & Electrical Works for Green Tunnel Portal Buildings - Uninterupted Power System Package | Notice | Closed | 05/07/24 | H: GBP 250k to 500k | 24/06/24 |
EKFB JV - Mechanical & Electrical Works for Green Tunnel Portal Buildings - Power And Other Small Works System Package | Notice | Closed | 05/07/24 | H: GBP 250k to 500k | 24/06/24 |
EKFB JV - Mechanical & Electrical Works for Green Tunnel Portal Building Normal Emergency Lighting Package | Notice | Closed | 05/07/24 | H: GBP 250k to 500k | 24/06/24 |
EKFB JV - Mechanical & Electrical Works for Green Tunnel Portal Building Mechanical Heat Recovery Package | Notice | Closed | 05/07/24 | H: GBP 250k to 500k | 24/06/24 |
EKFB JV - Mechanical & Electrical Works for Green Tunnel Portal Building Mechanical Cooling System Package | Notice | Closed | 05/07/24 | H: GBP 250k to 500k | 24/06/24 |
EKFB JV - Mechanical & Electrical Works for Green Tunnel Portal Building Fire Gas Suppression System Package | Notice | Closed | 05/07/24 | H: GBP 250k to 500k | 24/06/24 |
EKFB JV - Mechanical & Electrical Works for Green Tunnel Portal Building Electrical Heating System Package | Notice | Closed | 05/07/24 | H: GBP 250k to 500k | 24/06/24 |
EKFB JV - Mechanical & Electrical Works for Green Tunnel Portal Building Cable Management System Package | Notice | Closed | 05/07/24 | H: GBP 250k to 500k | 24/06/24 |
BBV HS2 MWCC North - SL5S – Road Jointing & Sealant Scope | Notice | Closed | 26/06/24 | J: GBP 1m to 2.5m | 19/06/24 |
SP29: Temporary Weatherproofing Structures - Old Oak Common (S4) Station | Notice | Closed | 12/07/24 | I: GBP 500k to 1m | 14/06/24 |
BBV HS2 MWCC North - HSST 1020.Aston Church Road Overbridge and Saltley Viaduct - Architectural Metalwork - Template copy | Notice | Closed | 20/06/24 | Not Disclosed | 13/06/24 |
BBV HS2 MWCC North - Bromford Tunnel East Portal Building Construction | Notice | Closed | 17/06/24 | Not Disclosed | 11/06/24 |
Pond Lining - Twyford to Greatworth | Notice | Closed | 07/06/24 | E: GBP 50k to 100k | 31/05/24 |
HS2 C1 ALIGN JV - Porous portal - Waterproofing package | Notice | Cancelled | 29/05/24 | Not Disclosed | 23/05/24 |
Galvanised Metal Embankment Staircases - Twyford to Greatworth | Notice | Closed | 28/05/24 | F: GBP 100k to 150k | 21/05/24 |
BBV HS2 MWCC North - Bromford Tunnel West Portal - Metalworks - OMa | Notice | Closed | 31/05/24 | Not Disclosed | 16/05/24 |
BBV HS2 MWCC North - Bromford Tunnel - Segment Repairs - OMa | Notice | Closed | 31/05/24 | Not Disclosed | 16/05/24 |
HS2 - Westgate LV Switchgear, Temporary TX and Cast-in Busbar (Sub-subcontract Package) | Notice | Closed | 17/05/24 | H: GBP 250k to 500k | 10/05/24 |
BBV HS2 MWCC North - HSST 1020.ACROB and SA – Glass Reinforced Plastic (GRP) | Notice | Closed | 17/05/24 | Not Disclosed | 09/05/24 |
EKFB - Water & Gas Membrane | Notice | Closed | 08/05/24 | E: GBP 50k to 100k | 01/05/24 |
EKFB Highways Kerbing Paving & Parking Bays - G2S AS | Notice | Closed | 10/05/24 | H: GBP 250k to 500k | 24/04/24 |
BBV HS2 MWCC North - HSST 1020.WWH Remediation & Hydrocarbon Testing | Notice | Closed | 02/05/24 | Not Disclosed | 24/04/24 |
HS2 Curzon Street Station - Instrumentation and Monitoring | Notice | Closed | 26/04/24 | J: GBP 1m to 2.5m | 19/04/24 |
BBV HS2 MWCC North - Bromford Tunnel East Portal: MEP Building Piling | Notice | Withdrawn | 19/04/24 | Not Disclosed | 16/04/24 |
Transportation of Tunnel Boring Machine Components from Birmingham to Continental Europe (Germany) | Notice | Closed | 22/04/24 | Not Disclosed | 15/04/24 |
HS2 Curzon Street Station - Security | Notice | Closed | 22/04/24 | M: GBP 5m - 10m | 12/04/24 |
HS2 Curzon Street Station - Logistics | Notice | Closed | 19/04/24 | N: GBP 10m - 20m | 12/04/24 |
BBV HS2 MWCC North - HSST 1020.Aston Church Road Overbridge and Saltley Viaduct - Architectural Metalwork | Notice | Closed | 18/04/24 | Not Disclosed | 11/04/24 |
HS2 Main Works S1 & S2 - SCS Railways - WP387 - Railway Siding Piling Copthall | Notice | Closed | 17/04/24 | Not Disclosed | 03/04/24 |
BBV HS2 MWCC North - Delta Junction – TES-D0 - 1927 - PSV - Shear Key Stainless Steel Plates | Notice | Closed | 12/04/24 | Not Disclosed | 03/04/24 |
EKFB JV - Bat Acoustic Deterrent | Notice | Closed | 12/04/24 | E: GBP 50k to 100k | 28/03/24 |
BBV JV HS2 Route-wide Landscaping Works, Seeding and Maintenance | Notice | Closed | 12/04/24 | R: GBP 50m - 70m | 28/03/24 |
BBV HS2 MWCC North - Bromford Tunnel Intemediate Shaft - Caverns&Adits: Waterproofing - OMa | Notice | Closed | 04/04/24 | Not Disclosed | 27/03/24 |
BBV HS2 MWCC North - Bromford East Portal - Supply of precast stairs and drainage covers | Notice | Closed | 05/04/24 | Not Disclosed | 25/03/24 |
HS2 Curzon Street Station - Design, Supply and Installation of Precast Concrete Cladding | Notice | Closed | 03/04/24 | J: GBP 1m to 2.5m | 25/03/24 |
Long Itchington Wood - Cross Passages - Door Form Work | Notice | Closed | 28/03/24 | E: GBP 50k to 100k | 22/03/24 |
Cladding (WRP Headhouse) - WP409 | Notice | Closed | 01/04/24 | Not Disclosed | 20/03/24 |
Hard Landscaping - WRP (inc. minor civils) - WP164.3 | Notice | Closed | 01/04/24 | Not Disclosed | 19/03/24 |
HS2 Curzon Street Station - Design, Supply and Installation of Structural Glazing | Notice | Closed | 29/03/24 | M: GBP 5m - 10m | 18/03/24 |
HS2 Curzon Street Station - Design, Supply and Installation of Curtain Walling | Notice | Closed | 29/03/24 | N: GBP 10m - 20m | 15/03/24 |
BBV HS2 MWCC North - Supply & Install of Asphaltic Plug Joints | Notice | Closed | 29/03/24 | H: GBP 250k to 500k | 14/03/24 |
HS2 C1 ALIGN JV _ Controlled demolition/Dismanling of 7 steel structures | Notice | Closed | 13/03/24 | Not Disclosed | 06/03/24 |
BBV HS2 MWCC North - HSST 1020. Welding works for pile cap rebar works on site | Notice | Closed | 07/03/24 | Not Disclosed | 04/03/24 |
Hard Landscaping - WP182 | Notice | Closed | 13/03/24 | Not Disclosed | 04/03/24 |
Soft Landscaping - WP181 | Notice | Closed | 13/03/24 | Not Disclosed | 04/03/24 |
Security Fencing & Gates - WP093.2 | Notice | Closed | 13/03/24 | Not Disclosed | 04/03/24 |
BBV HS2 MWCC North - Manual/Precise Levelling for Settlement Markers | Notice | Closed | 11/03/24 | I: GBP 500k to 1m | 29/02/24 |
BBV HS2 MWCC North - Sprayed Concrete (Shotcrete) | Notice | Closed | 08/03/24 | F: GBP 100k to 150k | 28/02/24 |
SP09.14 - Cranes Vertical Transportation - Old Oak Common (S4) Station | Notice | Cancelled | 15/03/24 | J: GBP 1m to 2.5m | 28/02/24 |
U100 plastic sample tube provider | Notice | Closed | 07/03/24 | E: GBP 50k to 100k | 28/02/24 |
Fit Out -WP12.2.3 HS2 Accommodation Blocks, LEER, Cores and Columns Cladding Envelope - Old Oak Common (S4) Station | Notice | ITT Issued | 20/03/24 | N: GBP 10m - 20m | 28/02/24 |
HS2 Main Works S1 & S2 - SCS Railways - WP028.6 West Ruislip Portal Demolition | Notice | Closed | 11/03/24 | Not Disclosed | 26/02/24 |
HS2 Main Works S1 & S2 - SCS Railways - WP093.1 - Permanent Fencing | Notice | Closed | 11/03/24 | Not Disclosed | 22/02/24 |
HS2 C1 ALIGN JV - CCTV System | Notice | Closed | 28/02/24 | H: GBP 250k to 500k | 22/02/24 |
Soft Landscaping - WP181 | Notice | Withdrawn | 01/03/24 | Not Disclosed | 21/02/24 |
BBV HS2 MWCC North - HSST 1020.Supply & Installation for drainage | Notice | Closed | 23/02/24 | Not Disclosed | 16/02/24 |
BBV HS2 MWCC North - DfMA Twin Box Bridge Structure | Notice | Closed | 01/03/24 | P: GBP 30m - 40m | 16/02/24 |
Geoarchaeological Assessment | Notice | Closed | 20/02/24 | F: GBP 100k to 150k | 13/02/24 |
BBV HS2 MWCC North - Bromford Tunnel Intemediate Shaft - First Stage Coring (inc. stitching) | Notice | Closed | 22/02/24 | Not Disclosed | 12/02/24 |
BBV HS2 MWCC North - HSST 1020.Supply & Installation for GFRC Panels | Notice | Closed | 15/02/24 | Not Disclosed | 08/02/24 |
BBV HS2 MWCC North - Bromford Tunnel Intemediate Shaft - Pile Cropping/Cutting | Notice | Closed | 15/02/24 | Not Disclosed | 07/02/24 |
BBV HS2 MWCC North - Bromford East Portal Rebar Technical Assistance and Optimisation | Notice | Closed | 16/02/24 | Not Disclosed | 06/02/24 |
BBV HS2 MWCC North - SL1b - TES-T0-1866 - BROT WP: Sheet Piling along the Bromford Tunnel West Portal Headhouse Building | Notice | Closed | 09/02/24 | Not Disclosed | 05/02/24 |
Fit Out - WP12.2.2 – WP12.2.2 Accommodation Blocks, LEER, and Central Core Structural Steelwork - Old Oak Common (S4) Station | Notice | ITT Issued | 07/02/24 | J: GBP 1m to 2.5m | 30/01/24 |
Bromford Mid Tunnel Crossing | Notice | Closed | 19/01/24 | Not Disclosed | 10/01/24 |
BBV HS2 - Permanent Security Fencing | Notice | Closed | 18/01/24 | N: GBP 10m - 20m | 05/01/24 |
Fit Out - WP12.7.1 - Painting and Sealants - Old Oak Common (S4) Station | Notice | Closed | 19/01/24 | J: GBP 1m to 2.5m | 18/12/23 |
EKFB JV - Greatworth Dry Valley drop inlet Culvert -Pipe Jacking | Notice | Closed | 11/12/23 | K: GBP 2.5m to 5m | 04/12/23 |
Fit Out - WP12.4 - SAB Internal Cladding - Old Oak Common (S4) Station | Notice | Closed | 12/01/24 | M: GBP 5m - 10m | 04/12/23 |
BBV HS2 MWCC North - HSST 1020.Specialist subcontractor for canal crossing truss sliding | Notice | Closed | 08/12/23 | Not Disclosed | 30/11/23 |
BBV HS2 MWCC North - NEW TEMPLATE - Template copy | Notice | Withdrawn | 08/12/23 | J: GBP 1m to 2.5m | 28/11/23 |
BBV HS2 MWCC North - Tower Lights | Notice | Closed | 08/12/23 | J: GBP 1m to 2.5m | 28/11/23 |
BBV HS2 MWCC North - Bromford Tunnel Intemediate Shaft - Caverns&Adits - OMa | Notice | Closed | 01/12/23 | Not Disclosed | 23/11/23 |
BBV HS2 MWCC North - Bromford Tunnel Intemediate Shaft - Caverns&Adits: Secondary Lining & Internal Structure - OMa | Notice | Closed | 01/12/23 | Not Disclosed | 23/11/23 |
WP12.1.2 - SAB Flooring - Old Oak Common (S4) Station | Notice | Closed | 15/01/24 | K: GBP 2.5m to 5m | 20/11/23 |
WP12.1.3 - HS2 Platforms & Central Core Flooring - Old Oak Common (S4) Station | Notice | Closed | 15/01/24 | K: GBP 2.5m to 5m | 20/11/23 |
BBV HS2 MWCC North - Bromford Tunnel West Portal - Internal Structures Civil Works - OMa | Notice | Closed | 24/11/23 | M: GBP 5m - 10m | 14/11/23 |
BBV HS2 MWCC North - HSST 1020.Saltley Attenuation Tank and Pumping Station | Notice | Closed | 24/11/23 | Not Disclosed | 09/11/23 |
WP407 M&E Labour | Notice | Closed | 13/11/23 | Not Disclosed | 06/11/23 |
BBV HS2 MWCC North - HSST 1020.Vehicle restraint Barriers including supply of VRS barriers Republishing | Notice | Closed | 03/11/23 | Not Disclosed | 23/10/23 |
WP112.1 Permanent Walkways | Notice | Closed | 30/10/23 | Not Disclosed | 18/10/23 |
WP112.1 Permanent Walkways | Notice | Withdrawn | 30/10/23 | J: GBP 1m to 2.5m | 18/10/23 |
HS2 MWCC S1 & S2 - WP082.06.02 - Modular Office Lift Maintenance | Notice | Closed | 25/10/23 | Not Disclosed | 16/10/23 |
Landscaping - Wild Flower & Grass Seed Opportunity | Notice | Closed | 20/10/23 | M: GBP 5m - 10m | 13/10/23 |
BBV HS2 MWCC North - HSST 1020.Specialist tunnelling/mining subcontractors to complete the excavation of a sump at the base of a Tunnel Portal | Notice | Closed | 16/10/23 | Not Disclosed | 10/10/23 |
BBV HS2 MWCC North - HSST 1020.Supply of Viaduct GRP/ FRP Walkway panels | Notice | Closed | 16/10/23 | Not Disclosed | 10/10/23 |
BBV HS2 MWCC North - HSST 1020.Vehicle restraint Barriers including supply of VRS barriers | Notice | Closed | 16/10/23 | Not Disclosed | 10/10/23 |
BBV HS2 MWCC North - Delta Junction – TES-D0-1825 - PSV - Segment Lift | Notice | Closed | 17/10/23 | Not Disclosed | 10/10/23 |
BBV HS2 MWCC North - HSST 1020.Ground water remediation | Notice | Closed | 16/10/23 | Not Disclosed | 10/10/23 |
EKFB JV - Viaducts underslab drainage contractor JD | Notice | Closed | 16/10/23 | I: GBP 500k to 1m | 02/10/23 |
EKFB JV - Supply of 2nr Material Handlers with Spoil Grabs | Notice | Closed | 20/10/23 | I: GBP 500k to 1m | 27/09/23 |
BBV HS2 MWCC North - HSST 1020. Birmingham Canal Traffic Management – Canal River Trust - VV | Notice | Closed | 06/10/23 | Not Disclosed | 25/09/23 |
BBV HS2 MWCC North - HSST 1020. Birmingham Canal Traffic Management – Canal River Trust - VV | Notice | Withdrawn | 06/10/23 | F: GBP 100k to 150k | 25/09/23 |
BBV HS2 MWCC North - Precast Bebo Arches | Notice | Closed | 27/09/23 | Not Disclosed | 20/09/23 |
BBV HS2 MWCC North - Ecological Monitoring & Mitigation | Notice | Closed | 26/09/23 | K: GBP 2.5m to 5m | 19/09/23 |
BBV HS2 MWCC North - I&M Drilling and Equipment Installation Works | Notice | Closed | 12/09/23 | I: GBP 500k to 1m | 05/09/23 |
Fit Out - WP12.8 Partitions & Ceilings - Old Oak Common (S4) Station | Notice | Closed | 08/09/23 | M: GBP 5m - 10m | 01/09/23 |
BBV HS2 MWCC North - Delta Junction – Segment Erection – First Spans – Basic Design – Specifications - Coleshill Viaduct - TES-D0-1804 | Notice | Closed | 07/09/23 | Not Disclosed | 29/08/23 |
BBV HS2 MWCC North - Asbestos Management and Disposal | Notice | Closed | 04/09/23 | I: GBP 500k to 1m | 25/08/23 |
HS2 Curzon Street Station - Site Hoarding | Notice | Closed | 30/08/23 | I: GBP 500k to 1m | 21/08/23 |
HS2 - Westgate DfMA design | Notice | Closed | 25/08/23 | C: GBP 15k to 25k | 21/08/23 |
BBV HS2 MWCC North - Delta Junction – TES-D0-1792 - Steel Fixing - SD-RW - Attleboro Assets | Notice | Closed | 18/08/23 | Not Disclosed | 14/08/23 |
Cement mix, pump hire service | Notice | Closed | 21/08/23 | E: GBP 50k to 100k | 11/08/23 |
EKFB - Drainage Materials - Supply Only - Framework Opportunity | Notice | Closed | 22/08/23 | M: GBP 5m - 10m | 11/08/23 |
S2 C1 ALIGN JV - 1206 - TBM Dismantling - Scaffolding | Notice | Closed | 14/08/23 | H: GBP 250k to 500k | 09/08/23 |
BBV HS2 MWCC North - Delta Junction – TES-D0-1781 -Cofferdam Manor Drive Overbridge | Notice | Closed | 15/08/23 | Not Disclosed | 09/08/23 |
HS2 Curzon Street Station - Construction Dewatering Works | Notice | Closed | 09/08/23 | I: GBP 500k to 1m | 02/08/23 |
Fit Out - WP12.5 Architectural Metalwork - Old Oak Common (S4) Station | Notice | Closed | 30/08/23 | M: GBP 5m - 10m | 02/08/23 |
As Built Drawing Provider - Old Oak Common (S4) Station | Notice | ITT Issued | 15/08/23 | K: GBP 2.5m to 5m | 24/07/23 |
HS2 Curzon Street Station - Substructure and Superstructure including Bulk Excavation | Notice | Closed | 02/08/23 | S: GBP 70m - 100m | 24/07/23 |
BBV HS2 MWCC North - Supply & Installation of Traffic Signs | Notice | Closed | 28/07/23 | Not Disclosed | 21/07/23 |
BBV HS2 MWCC North - HSST 1020.Hire of a 90m length 1.5m width pontoon for SCUB(Saltley Birmingham) | Notice | Closed | 31/07/23 | Not Disclosed | 21/07/23 |
Technical Advertisment for Construction Planning Services | Notice | Closed | 26/07/23 | D: GBP 25k to 50k | 19/07/23 |
Technical Advertisment for Construction Planning Services | Notice | Closed | 26/07/23 | D: GBP 25k to 50k | 19/07/23 |
BBV HS2 MWCC North - VRS | Notice | Closed | 25/07/23 | Not Disclosed | 18/07/23 |
BBV HS2 MWCC North - Delta Junction – TES-D0-x - River Cole Diversion – Temporary Dams | Notice | Closed | 14/07/23 | Not Disclosed | 07/07/23 |
BBV HS2 MWCC North - Precast Concrete Culvert Installation | Notice | Closed | 12/07/23 | I: GBP 500k to 1m | 06/07/23 |
Design for Safety Consultancy - Old Oak Common (S4) Station | Notice | Closed | 17/07/23 | H: GBP 250k to 500k | 04/07/23 |
Fire Stopping Consultancy - Old Oak Common (S4) Station | Notice | Closed | 12/07/23 | G: GBP 150k to 250k | 04/07/23 |
WP393 - Precast Shaft Internal Structure (lift and shaft core) | Notice | Closed | 11/07/23 | Not Disclosed | 04/07/23 |
Fire Stopping Consultancy - Old Oak Common (S4) Station | Notice | Withdrawn | 12/07/23 | G: GBP 150k to 250k | 29/06/23 |
HS2 C1 ALIGN JV - 2137 Access and Ventilation Hatches | Notice | Closed | 05/07/23 | Not Disclosed | 28/06/23 |
HS2 Curzon Street Station - Supply of Site Offices and Accommodation (Modular Buildings) | Notice | Closed | 04/07/23 | K: GBP 2.5m to 5m | 27/06/23 |
Service & Maintenance-Industrial Diesel Generators - 2 x Kohler V350C2 50Hz 350kVA | Notice | Closed | 30/06/23 | A: Up to GBP 5k | 23/06/23 |
Fit Out - Internal Doors -WP12.6 - Old Oak Common (S4) Station | Notice | ITT Issued | 31/07/23 | K: GBP 2.5m to 5m | 22/06/23 |
EKFB CCTV (drainage surveys) G2S SH | Notice | Closed | 30/06/23 | F: GBP 100k to 150k | 21/06/23 |
EKFB JV – Route wide landscaping - NEC Subcontract Works | Notice | Closed | 05/07/23 | O: GBP 20m - 30m | 21/06/23 |
EKFB Traffic Signs G2S SH | Notice | Closed | 23/06/23 | H: GBP 250k to 500k | 15/06/23 |
BBV HS2 MWCC North - SL2b Design, Supply & Build of Crib Wall / Retaining wall | Notice | Closed | 29/06/23 | D: GBP 25k to 50k | 14/06/23 |
Manufacture and Suply of Steel Tube Piles | Notice | Closed | 23/06/23 | I: GBP 500k to 1m | 14/06/23 |
Suply of Steel Tube Piles | Notice | Withdrawn | 23/06/23 | I: GBP 500k to 1m | 12/06/23 |
EKFB JV - Fluvial Geomorphology Technical Support | Notice | Closed | 20/06/23 | E: GBP 50k to 100k | 12/06/23 |
Fit Out - Ancillary Metalwork -WP12.3 - Old Oak Common (S4) Station | Notice | ITT Issued | 23/06/23 | K: GBP 2.5m to 5m | 06/06/23 |
Fit Out - WP12.2.2 – HS2 Platform Accommodation Buildings Steelwork & Glazing - Old Oak Common (S4) Station | Notice | Cancelled | 23/06/23 | N: GBP 10m - 20m | 06/06/23 |
Epoxy Resin Flooring - WP391 | Notice | Closed | 31/05/23 | Not Disclosed | 17/05/23 |
Purchase of Lorry Loader Cranes | Notice | Closed | 25/05/23 | Not Disclosed | 16/05/23 |
Hire of lorry loader cranes | Notice | Closed | 25/05/23 | Not Disclosed | 16/05/23 |
BBV HS2 MWCC North - Delta Junction – TES-D0-1607 - PSV - Lateral platforms for stay storage | Notice | Closed | 23/05/23 | Not Disclosed | 15/05/23 |
BBV HS2 MWCC North - SL2b Supply and installation of traffic signals | Notice | Closed | 22/05/23 | H: GBP 250k to 500k | 15/05/23 |
HS2 C1 ALIGN JV - Jetty Dismantling and Removal | Notice | Closed | 23/05/23 | J: GBP 1m to 2.5m | 12/05/23 |
BBV HS2 MWCC North - Middle Bickenhill Landfill (MBL) Ground Remediation | Notice | Closed | 16/05/23 | Not Disclosed | 10/05/23 |
Fit Out - Lift Steelwork & Glazing -WP12.2.1 - Old Oak Common (S4) Station Re-open | Notice | ITT Issued | 18/05/23 | N: GBP 10m - 20m | 04/05/23 |
Fit Out - Station Platform Flooring -WP12.1.1 - Old Oak Common (S4) Station Re-Open | Notice | ITT Issued | 18/05/23 | K: GBP 2.5m to 5m | 04/05/23 |
Fit Out - Lift Steelwork & Glazing -WP12.2.1 - Old Oak Common (S4) Station | Notice | ITT Issued | 02/05/23 | N: GBP 10m - 20m | 28/04/23 |
BBV HS2 MWCC North - Ancient Woodland Translocation | Notice | Closed | 05/05/23 | Not Disclosed | 27/04/23 |
HS2 Main Works S1 & S2 - Security Fencing and Gate works | Notice | Awarded | 03/05/23 | Not Disclosed | 26/04/23 |
HS2 Main Works S1 & S2 - Pre-cast Retaining Walls and Brick Slips | Notice | Closed | 03/05/23 | Not Disclosed | 26/04/23 |
BBV HS2 JV - Supply of Formwork - Sump Liner Wall and Shaft Building at Bromford Tunnel East Portal | Notice | Cancelled | 25/04/23 | Not Disclosed | 18/04/23 |
Fit Out - Station Platform Flooring -WP12.1.1 - Old Oak Common (S4) Station | Notice | Cancelled | 24/04/23 | K: GBP 2.5m to 5m | 14/04/23 |
BBV HS2 MWCC North - Geoarchaeological Investigations | Notice | Closed | 14/04/23 | E: GBP 50k to 100k | 06/04/23 |
Bulk Tankers for Transporting Powder | Notice | Cancelled | 17/04/23 | D: GBP 25k to 50k | 06/04/23 |
BBV HS2 MWCC North - Drugs & Alcohol Testing Services | Notice | Closed | 14/04/23 | I: GBP 500k to 1m | 04/04/23 |
BBV HS2 MWCC North - Delta Junction – TES-D0-1678- Concrete Crushing & Screening | Notice | Closed | 10/04/23 | Not Disclosed | 04/04/23 |
12354-HS2 MWC North - RAIL Competency Administration and Coordination | Notice | Closed | 17/04/23 | G: GBP 150k to 250k | 03/04/23 |
BBV HS2 MWCC North - Delta Junction – PSV_Mini-cranes & transporters- TES-D0-1677 | Notice | Closed | 11/04/23 | Not Disclosed | 03/04/23 |
EKFB G2S Oxford Canal - Supply of "Ironstone" Walling/cladding | Notice | Closed | 11/04/23 | Not Disclosed | 29/03/23 |
HS2 Main Works S1 & S2 - Mobile Elevating Working Platforms (MEWPS) - Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) Certified Inspection and Examination | Notice | Closed | 03/04/23 | I: GBP 500k to 1m | 27/03/23 |
HS2 Main Works S1 & S2 - Multi Service Vehicle (MSV) and Public Service Vehicle (PSV) ad hoc maintenance | Notice | Closed | 03/04/23 | I: GBP 500k to 1m | 27/03/23 |
HS2 Main Works S1 & S2 - Cross Passage and Invert Bridge Equipment Maintenance | Notice | Closed | 31/03/23 | Not Disclosed | 27/03/23 |
HS2 Main Works S1 & S2 - Telehandlers Maintenance | Notice | Closed | 31/03/23 | Not Disclosed | 27/03/23 |
HS2 Main Works S1 & S2 - Spray Concrete Equipment Maintenance | Notice | Closed | 31/03/23 | Not Disclosed | 27/03/23 |
HS2 Main Works S1 & S2 - Cross Passage Compressor Maintenance | Notice | Closed | 31/03/23 | Not Disclosed | 27/03/23 |
HS2 Main Works S1 & S2 - Fire Suppression Maintenance | Notice | Closed | 31/03/23 | I: GBP 500k to 1m | 23/03/23 |
HS2 Main Works S1 & S2 - Concrete Pumps Repair | Notice | Closed | 31/03/23 | I: GBP 500k to 1m | 23/03/23 |
HS2 Main Works S1 & S2 - Volvo Excavators Maintenance | Notice | Closed | 30/03/23 | I: GBP 500k to 1m | 22/03/23 |
HS2 Main Works S1 & S2 - Water Sampling and Testing | Notice | Closed | 30/03/23 | I: GBP 500k to 1m | 22/03/23 |
HS2 Main Works S1 & S2 - Lifting (Segment) Grab Maintenance | Notice | Closed | 30/03/23 | I: GBP 500k to 1m | 22/03/23 |
HS2 Main Works S1 & S2 - Kubota Tractor Maintenance | Notice | Closed | 30/03/23 | I: GBP 500k to 1m | 22/03/23 |
HS2 Main Works S1 & S2 - Ventilation and Deduster Fans | Notice | Closed | 29/03/23 | I: GBP 500k to 1m | 22/03/23 |
HS2 Main Works S1 & S2 - Hyperbaric chamber & medical | Notice | Closed | 29/03/23 | I: GBP 500k to 1m | 22/03/23 |
HS2 Main Works S1 & S2 - Electric Stationary Compressors Maintenance | Notice | Closed | 29/03/23 | I: GBP 500k to 1m | 22/03/23 |
HS2 Main Works S1 & S2 - Hyperbaric Compressor Maintenance | Notice | Closed | 29/03/23 | I: GBP 500k to 1m | 21/03/23 |
HS2 Main Works S1 & S2 - Multi Service Vehicle (MSV) - Caterpillar Engine Maintenance | Notice | Closed | 29/03/23 | I: GBP 500k to 1m | 21/03/23 |
BBV HS2 MWCC North - Delta Junction – TES-D0-1668 - A446 - Lichfield road temporary diversion | Notice | Closed | 28/03/23 | Not Disclosed | 21/03/23 |
HS2 Main Works S1 & S2 -Tunnel Boring Machine (TBM) Compressors | Notice | Closed | 29/03/23 | J: GBP 1m to 2.5m | 21/03/23 |
HS2 MWCC S1 & S2 – WP174.2 Post-Construction Condition Surveys (Rail) | Notice | Closed | 31/03/23 | Not Disclosed | 20/03/23 |
WP2500 - 003 Lifting Beams | Notice | Cancelled | 17/03/23 | D: GBP 25k to 50k | 14/03/23 |
WP5300 - 001 Anti Graffiti | Notice | Cancelled | 17/03/23 | Not Disclosed | 14/03/23 |
BBV HS2 MWCC North - Bromford Operatives Transportation between Park Hall Office Compound and BTEP - OMa | Notice | Closed | 17/03/23 | Not Disclosed | 09/03/23 |
Urban Realm – Civils, Earthworks, Utilities infrastructure and associated structures WP13.1 - Old Oak Common (S4) Station | Notice | Awarded | 13/03/23 | N: GBP 10m - 20m | 27/02/23 |
BBV HS2 MWCC North - Avonmouth - Transport and Disposal of Rejected Tunnel Segments | Notice | Closed | 28/02/23 | Not Disclosed | 20/02/23 |
HS2 Main Works S1 & S2 - SCS Railways - Area East Asbestos Watching & Removal | Notice | Closed | 08/03/23 | Not Disclosed | 20/02/23 |
Consolidation & Logistics Facility - Old Oak Common (S4) Station | Notice | ITT Issued | 06/03/23 | K: GBP 2.5m to 5m | 17/02/23 |
Visual Mock Up Area Facility - Old Oak Common (S4) Station | Notice | Awarded | 27/02/23 | J: GBP 1m to 2.5m | 15/02/23 |
BBV HS2 MWCC North - Ecology resource requirements | Notice | Closed | 20/02/23 | Not Disclosed | 14/02/23 |
HS2 Euston Station - Utilities South Diversionary Works | Notice | Closed | 24/02/23 | M: GBP 5m - 10m | 14/02/23 |
BBV HS2 MWCC North - Tensar Retaining Wall Installation | Notice | Closed | 20/02/23 | H: GBP 250k to 500k | 13/02/23 |
Laboratory testing of hardened properties of slurry wall material | Notice | Cancelled | 20/02/23 | Not Disclosed | 10/02/23 |
BBV HS2 MWCC North - Permanent Drainage Installation Works | Notice | Closed | 28/02/23 | K: GBP 2.5m to 5m | 09/02/23 |
BBV HS2 MWCC North - Billing Validation Services for Gas & Electricity | Notice | Closed | 15/02/23 | E: GBP 50k to 100k | 08/02/23 |
BBV HS2 MWCC North - HSST 1020. Freightliner Bellmouth – Duddeston Junction Viaduct - VV | Notice | Closed | 15/02/23 | E: GBP 50k to 100k | 07/02/23 |
BBV HS2 MWCC North - HSST1020. MDU Depot Demolition - VV | Notice | Closed | 15/02/23 | H: GBP 250k to 500k | 07/02/23 |
BBV HS2 JV - Supply and Delivery of CBGM (Cement bound granular material) Circa 365,000m3 | Notice | Closed | 13/02/23 | Not Disclosed | 06/02/23 |
BBV HS2 JV - Supply and Delivery of Drainage Aggregates - Large Volume | Notice | Closed | 09/02/23 | O: GBP 20m - 30m | 02/02/23 |
BBV HS2 JV - Supply of Precast concrete repair products - Template copy | Notice | Withdrawn | 09/02/23 | Not Disclosed | 02/02/23 |
Artwork Consultant - Architectural Finishes (WP12.01.01) - Old Oak Common (S4) Station | Notice | ITT Issued | 10/02/23 | D: GBP 25k to 50k | 27/01/23 |
BBV HS2 MWCC North - Brook Flume WWH I.S. | Notice | Closed | 01/02/23 | I: GBP 500k to 1m | 25/01/23 |
HS2 Main Works S1 & S2 - SCS Railways - Area East Dewatering & Depressurisation | Notice | Closed | 08/02/23 | Not Disclosed | 25/01/23 |
EKFB - Gritting | Notice | Closed | 03/02/23 | I: GBP 500k to 1m | 24/01/23 |
BBV HS2 MWCC North - Ecology Habitat Creation | Notice | Closed | 31/01/23 | Not Disclosed | 23/01/23 |
TBM Launch Cradle | Notice | Awarded | 24/01/23 | J: GBP 1m to 2.5m | 23/01/23 |
EKFB JV - Trackside Drainage - In-situ Drainage Channels (Labour and Plant) | Notice | Closed | 17/02/23 | O: GBP 20m - 30m | 23/01/23 |
EKFB JV - Trackside Drainage - Pipework (Labour and Plant) | Notice | Closed | 17/02/23 | O: GBP 20m - 30m | 23/01/23 |
BBV HS2 MWCC North - Kerbing | Notice | Closed | 03/02/23 | Not Disclosed | 19/01/23 |
BBV HS2 MWCC North - Landscaping | Notice | Closed | 28/02/23 | Not Disclosed | 19/01/23 |
BBV HS2 MWCC North - Pumping Stations - Pumped Drainage System Package | Notice | Closed | 13/02/23 | M: GBP 5m - 10m | 19/01/23 |
BBV HS2 MWCC North - Pumping Stations - Mechanical & Electrical Package | Notice | Closed | 13/02/23 | M: GBP 5m - 10m | 19/01/23 |
BBV HS2 MWCC North - Pumping Stations - Civil/Architectural Package | Notice | Closed | 08/02/23 | N: GBP 10m - 20m | 19/01/23 |
BBV HS2 MWCC North - Supply & Installation of Handrails for Structures | Notice | Closed | 27/01/23 | Not Disclosed | 17/01/23 |
BBV HS2 MWCC North - Precast Slabs | Notice | Closed | 03/02/23 | I: GBP 500k to 1m | 16/01/23 |
SCS JV - Supply Chain Enterprise Academy - Register & Save The Date | Notice | Withdrawn | 18/03/22 | Not Disclosed | 16/01/23 |
HS2 C1 ALIGN JV - Landscaping & Fencing works | Notice | Closed | 18/01/23 | Not Disclosed | 11/01/23 |
BBV HS2 MWCC North - GRP Formwork | Notice | Closed | 16/01/23 | Not Disclosed | 10/01/23 |
BBV HS2 MWCC North - Delta Junction – TES-D0-1594 - Tower Cranes | Notice | Closed | 16/01/23 | I: GBP 500k to 1m | 09/01/23 |
Concrete and Pile Testing | Notice | Cancelled | 13/01/23 | I: GBP 500k to 1m | 09/01/23 |
BBV HS2 MWCC North - Delta Junction – TES-D0-1593 - Storage buildings for deck activities | Notice | Closed | 11/01/23 | H: GBP 250k to 500k | 03/01/23 |
HS2 Main Works S1 & S2 - Foam Concrete | Notice | Awarded | 03/01/23 | E: GBP 50k to 100k | 29/12/22 |
EKFB Site Welding andLight Metal Fabrication JD | Notice | Cancelled | 20/01/23 | H: GBP 250k to 500k | 23/12/22 |
Secondary Gas Diversions | Notice | Cancelled | 06/01/23 | I: GBP 500k to 1m | 20/12/22 |
BBV HS2 MWCC North - Permanent Brook Diversion WWH I.S | Notice | Closed | 06/01/23 | I: GBP 500k to 1m | 19/12/22 |
Guidewall Rev1 | Notice | Cancelled | 13/01/23 | I: GBP 500k to 1m | 15/12/22 |
Supply of Plasticizer Rev1 | Notice | Cancelled | 13/01/23 | J: GBP 1m to 2.5m | 15/12/22 |
Supply of Magnesium Oxide Rev 1 | Notice | Cancelled | 13/01/23 | J: GBP 1m to 2.5m | 15/12/22 |
HS2 C1 ALIGN JV - Slipform Tunnel Walkways | Notice | Closed | 22/12/22 | Not Disclosed | 15/12/22 |
Supply of GGBS Rev 1 | Notice | Cancelled | 13/01/23 | J: GBP 1m to 2.5m | 15/12/22 |
Supply of CEM1/OPC copy | Notice | Cancelled | 13/01/23 | I: GBP 500k to 1m | 15/12/22 |
BBV HS2 MWCC North - Earthing & Bonding Subcontractor | Notice | Closed | 03/01/23 | Not Disclosed | 13/12/22 |
BBV HS2 MWCC North - Steel Parapet Stillages | Notice | Closed | 23/12/22 | E: GBP 50k to 100k | 06/12/22 |
BBV HS2 MWCC North - Delta Junction – TES-D2-047 - Pier Head Platforms During Deck Stage | Notice | Closed | 23/12/22 | I: GBP 500k to 1m | 06/12/22 |
NOISE BARRIERS - Earthworks, construction and installation - High Speed 2 (HS2) | Notice | Closed | 14/12/22 | O: GBP 20m - 30m | 05/12/22 |
Supply of CEM1/OPC | Notice | Cancelled | 11/12/22 | I: GBP 500k to 1m | 02/12/22 |
Supply of GGBS | Notice | Cancelled | 11/12/22 | J: GBP 1m to 2.5m | 02/12/22 |
Supply of Magnesium Oxide | Notice | Cancelled | 11/12/22 | J: GBP 1m to 2.5m | 02/12/22 |
Supply of Plasticizer | Notice | Cancelled | 11/12/22 | J: GBP 1m to 2.5m | 02/12/22 |
Guidewall | Notice | Cancelled | 11/12/22 | I: GBP 500k to 1m | 02/12/22 |
EKFB - Greatworth to Southam - Street Lighting | Notice | Closed | 10/12/22 | E: GBP 50k to 100k | 01/12/22 |
EKFB - Greatworth to Southam- Highway Vehicle Restraint System | Notice | Awarded | 10/12/22 | H: GBP 250k to 500k | 01/12/22 |
EKFB - Greatworth to Southam - Surfacing (highways) | Notice | Closed | 10/12/22 | H: GBP 250k to 500k | 01/12/22 |
Bridge Deck Waterproofing G2S SH | Notice | Awarded | 08/12/22 | H: GBP 250k to 500k | 30/11/22 |
HS2 Main Works S1 & S2 - WP023 - Crane Maintenance | Notice | Awarded | 06/12/22 | J: GBP 1m to 2.5m | 29/11/22 |
EKFB JV - Highways Works Calvert South | Notice | Cancelled | 09/12/22 | M: GBP 5m - 10m | 28/11/22 |
BBV HS2 MWCC North - Avonmouth Factory Scaffolding - HJo | Notice | Closed | 02/12/22 | Not Disclosed | 23/11/22 |
HS2 C1 ALIGN JV - Above ground HDPE drainage installation (Colne Valley Viaduct) | Notice | Closed | 29/11/22 | Not Disclosed | 23/11/22 |
EKFB JV - Storage Facility - (TD LCC) | Notice | Closed | 01/12/22 | E: GBP 50k to 100k | 18/11/22 |
BBV HS2 JV - Supply of Precast concrete repair products | Notice | Closed | 27/11/22 | Not Disclosed | 17/11/22 |
HS2 Main Works S1 & S2 - SCS Railways - ETRC Demolition of NR Retaining Wall | Notice | Closed | 02/12/22 | Not Disclosed | 14/11/22 |
EKFB JV - Stop Logs, Trash Barriers and Handrail - T2G - SW | Notice | Closed | 21/11/22 | I: GBP 500k to 1m | 11/11/22 |
Miscellaneous Civils Work - Old Oak Common (S4) Station | Notice | Cancelled | 28/11/22 | I: GBP 500k to 1m | 11/11/22 |
BBV HS2 MWCC North - Hyperbaric Consultancy - Bromford Tunnel - DM | Notice | Closed | 24/11/22 | Not Disclosed | 10/11/22 |
EKFB JV - Wastewater Disposal | Notice | Withdrawn | 11/11/22 | H: GBP 250k to 500k | 10/11/22 |
HS2 MWCC S1 & S2 - WP203.2 - Asset Protection Design Services - Heritage and Rail Structure Specialism | Notice | Awarded | 25/11/22 | Not Disclosed | 08/11/22 |
HS2 Main Works S1 & S2 - SCS Railways - WP056.E2.4 Nosie Barrier Piling | Notice | Closed | 21/11/22 | J: GBP 1m to 2.5m | 07/11/22 |
BBV HS2 MWCC North - BROMFORD TUNNEL SERVICES BRACKETS AND WALKWAY - OMa | Notice | Closed | 18/11/22 | Not Disclosed | 04/11/22 |
BBV HS2 MWCC North - Concrete Cutting | Notice | Closed | 17/11/22 | E: GBP 50k to 100k | 03/11/22 |
BBV HS2 MWCC North - Construction of Temporary Concrete Slab (Bentonite Slab) | Notice | Closed | 10/11/22 | E: GBP 50k to 100k | 03/11/22 |
HS2 Main Works S1 & S2 - SCS Railways - WP148.8 - Pile Testing (Cyclical Load Testing) | Notice | Awarded | 15/11/22 | Not Disclosed | 01/11/22 |
BBV HS2 MWCC North - Temporary Bridge Foundations - Sublot 2b | Notice | Closed | 04/11/22 | Not Disclosed | 27/10/22 |
BBV HS2 MWCC North - Bromford Tunnel Muck Away Operations - OMa | Notice | Closed | 04/11/22 | Not Disclosed | 27/10/22 |
HS2 Main Works - SCS Railways - Urban Realm (Landscaping) - WP164.3 | Notice | Cancelled | 03/11/22 | K: GBP 2.5m to 5m | 26/10/22 |
BBV HS2 MWCC North - Filter Press Shed Sheeting - OMa | Notice | Closed | 04/11/22 | Not Disclosed | 26/10/22 |
BBV HS2 MWCC North - Geoarchaeological Surveys copy | Notice | Closed | 28/10/22 | E: GBP 50k to 100k | 21/10/22 |
HS2 C1 ALIGN JV - Flint Clad Concrete Security Wall | Notice | Closed | 01/11/22 | Not Disclosed | 20/10/22 |
SCS JV - Supply Chain Enterprise Academy - Register & Save The Date - OPEN TO ALL | Notice | Withdrawn | 17/06/22 | Not Disclosed | 18/10/22 |
BBV HS2 MWCC North - Delta Junction – TES-D0-1508 - Coleshill Culvert | Notice | Closed | 24/10/22 | I: GBP 500k to 1m | 17/10/22 |
HS2 Main Works S1 & S2 - Tunnels Segment Transportatiom | Notice | Closed | 26/10/22 | I: GBP 500k to 1m | 17/10/22 |
Concrete Testing | Notice | Closed | 24/10/22 | J: GBP 1m to 2.5m | 14/10/22 |
BBV HS2 MWCC North - Supply and installation of 2no bailey bridge (all plant, equipment and labour provided by the subcontractor) | Notice | Closed | 21/10/22 | H: GBP 250k to 500k | 13/10/22 |
BBV HS2 MWCC North - Delta Junction– B4114 Realignement | Notice | Closed | 20/10/22 | J: GBP 1m to 2.5m | 13/10/22 |
BBV HS2 MWCC North - Earthing & Bonding requirements at Kingsbury Road OB, Leeds Spur Diveunder, Black Brook Viaduct & B&F Canal Viaduct | Notice | Closed | 28/10/22 | F: GBP 100k to 150k | 13/10/22 |
BBV HS2 MWCC North - Supply & Installation of Metal Work at Culverts and Abutments (Hand Rail, Stairways & Doors) | Notice | Closed | 28/10/22 | Not Disclosed | 11/10/22 |
BBV HS2 MWCC North - Delta Junction– TES-D0-1498 - Expansion Joints | Notice | ITT Issued | 17/10/22 | H: GBP 250k to 500k | 10/10/22 |
BBV HS2 MWCC North - Agricultural Tractor c/w trailer | Notice | Closed | 14/10/22 | Not Disclosed | 07/10/22 |
EKFB Subcontract works for prefabricated Reinforcement - T2G | Notice | Cancelled | 19/10/22 | I: GBP 500k to 1m | 06/10/22 |
EKFB Installation of Cut and Bent Reinforcement - T2G | Notice | Cancelled | 19/10/22 | I: GBP 500k to 1m | 06/10/22 |
BBV HS2 MWCC North - Pile Cap Strenghtening - OMa | Notice | Closed | 14/10/22 | Not Disclosed | 05/10/22 |
BBV HS2 JV - Highway Billboards - Design, Consent, Temp Works, Supply, Install, Maintenance, Remove and Restore | Notice | Closed | 14/10/22 | J: GBP 1m to 2.5m | 04/10/22 |
T2G - Vehicle Restraint Barrier (VRS) | Notice | Closed | 10/10/22 | D: GBP 25k to 50k | 03/10/22 |
EKFB JV – Route wide Permanent Fencing and gates (steel and timber) - NEC Subcontract Works | Notice | Closed | 07/10/22 | P: GBP 30m - 40m | 29/09/22 |
1200mm OD Pipe installation at Calvert North | Notice | Closed | 07/10/22 | Not Disclosed | 28/09/22 |
Urban Realm - Trees (WP13.8) - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 10/10/22 | J: GBP 1m to 2.5m | 28/09/22 |
BBV HS2 MWCC North - Delta Junction – Permanent Drainage Components | Notice | Closed | 07/10/22 | I: GBP 500k to 1m | 27/09/22 |
BBV HS2 MWCC North - Delta Junction – Supply of Deck Gullies | Notice | Closed | 07/10/22 | I: GBP 500k to 1m | 27/09/22 |
BBV HS2 MWCC North - Short Notice Gully Repairs | Notice | Closed | 03/10/22 | D: GBP 25k to 50k | 27/09/22 |
EKFB JV - Land Maintenance | Notice | Closed | 07/10/22 | M: GBP 5m - 10m | 23/09/22 |
HS2 Main Works S1 & S2 – Steel Reinforcement Pre-fabrication | Notice | Cancelled | 30/09/22 | V: GBP 500m - 750m | 22/09/22 |
EKFB JV - Precast water Storage tank | Notice | Awarded | 28/09/22 | Not Disclosed | 21/09/22 |
HS2 C1 ALIGN JV - Metal Cladding | Notice | ITT Issued | 27/09/22 | Not Disclosed | 20/09/22 |
EKFB JV - Dewatering within T2G | Notice | Awarded | 26/09/22 | I: GBP 500k to 1m | 16/09/22 |
BBV HS2 MWCC North - Delta Junction – TES-D0-1450 - Earthing and Bonding | Notice | Closed | 21/09/22 | G: GBP 150k to 250k | 13/09/22 |
Windows replacement/repair for a commercial building | Notice | Closed | 18/09/22 | Not Disclosed | 08/09/22 |
EKFB Accommodation / Civil Works | Notice | Awarded | 16/09/22 | E: GBP 50k to 100k | 06/09/22 |
Watercourse Diversion High Furlong Brook | Notice | Closed | 02/09/22 | G: GBP 150k to 250k | 25/08/22 |
BBV HS2 MWCC North - Tunnels – 5 MEP Buildings | Notice | Closed | 04/09/22 | O: GBP 20m - 30m | 25/08/22 |
BBV HS2 MWCC North - Sub Lot 7 – Noise Insulation (Secondary Glazing, Solar Blinds & Ventilation Units) | Notice | Closed | 08/09/22 | F: GBP 100k to 150k | 25/08/22 |
Raised Access Flooring Material Testing (SP26.1) - Old Oak Common (S4) Station - HS2 | Notice | Withdrawn | 06/09/22 | F: GBP 100k to 150k | 25/08/22 |
HS2 MWCC S1 & S2 - WP166.B - Post-Condition Surveys | Notice | Awarded | 06/09/22 | Not Disclosed | 24/08/22 |
BBV HS2 MWCC North - Diamond Concrete Cutting | Notice | Closed | 02/09/22 | D: GBP 25k to 50k | 23/08/22 |
HS2 Main Works - SCS Railways - Invert (1st Stage) Concrete - WP112 | Notice | Cancelled | 25/08/22 | Not Disclosed | 17/08/22 |
A41 Realignment Permanent Surfacing | Notice | Awarded | 30/08/22 | K: GBP 2.5m to 5m | 17/08/22 |
EKFB - Crawler Cranes (Additional Resource) - Framework Opportunity | Notice | Closed | 26/08/22 | M: GBP 5m - 10m | 15/08/22 |
BBV HS2 MWCC North - Delta Junction – Hydraulic Elements | Notice | Closed | 24/08/22 | Not Disclosed | 11/08/22 |
BBV HS2 MWCC North - Delta Junction – M42 M6 Streetlighting | Notice | Closed | 24/08/22 | Not Disclosed | 11/08/22 |
HS2 Main Works S1 & S2 - SCS Railways - High Voltage Cable Maintenance - WP345 | Notice | Awarded | 18/08/22 | Not Disclosed | 11/08/22 |
BBV HS2 MWCC North - Hydraulically Adjustable 4 axle Semi Trailer for Plant Movements | Notice | Closed | 16/08/22 | Not Disclosed | 11/08/22 |
BBV HS2 MWCC North - Truck/Cab for Plant Movement - 6 x 4 unit / Euro 6 | Notice | Closed | 16/08/22 | Not Disclosed | 11/08/22 |
BBV HS2 MWCC North - Hydraulically Adjustable 4 axle Semi Trailer for Plant Movement | Notice | Withdrawn | 30/08/22 | Not Disclosed | 11/08/22 |
HS2 N1 N2 - Security Man Guarding | Notice | Closed | 15/08/22 | Q: GBP 40m - 50m | 10/08/22 |
Supply and Installation of Person detection system for operated plant | Notice | Awarded | 15/08/22 | I: GBP 500k to 1m | 09/08/22 |
BBV HS2 MWCC North - Lighting Towers | Notice | ITT Issued | 12/08/22 | Not Disclosed | 03/08/22 |
BBV HS2 MWCC North - Road marking / White Lining & Studding | Notice | Closed | 10/08/22 | K: GBP 2.5m to 5m | 03/08/22 |
BBVS Extranet (SP21) - Old Oak Common (S4) Station - HS2 | Notice | Cancelled | 12/08/22 | E: GBP 50k to 100k | 02/08/22 |
BBV HS2 MWCC North - Drainage Materials | Notice | Closed | 10/08/22 | Not Disclosed | 29/07/22 |
EKFB Diamond Drilling - T2G | Notice | Closed | 08/08/22 | H: GBP 250k to 500k | 27/07/22 |
HS2 C1 ALIGN JV - Shaft Groundworks | Notice | Closed | 10/08/22 | Not Disclosed | 27/07/22 |
BBV HS2 MWCC North - BROT IS - Shaft excavation and Internal civil works - OMa | Notice | Closed | 07/08/22 | Not Disclosed | 27/07/22 |
HS2 C1 ALIGN JV - Glass Fibre Reinforced Concrete Cladding and Concrete Cladding | Notice | ITT Issued | 03/08/22 | Not Disclosed | 25/07/22 |
Water ingress injection repairs to the diaphragm wall | Notice | Cancelled | 03/08/22 | C: GBP 15k to 25k | 25/07/22 |
BBV HS2 MWCC North - Delta Junction – Self Propelled Modular Transporters | Notice | Closed | 03/08/22 | Not Disclosed | 21/07/22 |
Platform Service Booms (WP9.1) - Old Oak Common (S4) Station - HS2 | Notice | ITT Issued | 10/08/22 | M: GBP 5m - 10m | 20/07/22 |
Platform Service Booms (WP9.1) - Old Oak Common (S4) Station - HS2 | Notice | Withdrawn | 10/08/22 | M: GBP 5m - 10m | 20/07/22 |
BBV HS2 MWCC North - Scope of Works – SD&RW – Glass Reinforced Plastic Permanent Formwork | Notice | Closed | 27/07/22 | Not Disclosed | 19/07/22 |
Headhouses & Ancillary Buildings (WP09b, 10b, 11b)- Old Oak Common (S4) Station - HS2 | Notice | Awarded | 25/07/22 | O: GBP 20m - 30m | 19/07/22 |
HS2 SCS Railways - Miscellaneous Steelwork - Welding & Fabrication Services | Notice | Closed | 05/08/22 | Not Disclosed | 13/07/22 |
BBV HS2 MWCC North - Frame for transport of the Segments Kingsbury Precast Yards | Notice | Awarded | 20/07/22 | Not Disclosed | 12/07/22 |
Guide wall installation | Notice | Awarded | 29/07/22 | G: GBP 150k to 250k | 12/07/22 |
Provision of setting out engineers | Notice | Awarded | 28/07/22 | E: GBP 50k to 100k | 12/07/22 |
Pile Integrity Testing | Notice | Cancelled | 22/07/22 | C: GBP 15k to 25k | 12/07/22 |
BBV HS2 MWCC North - Ground Water Monitoring | Notice | Closed | 18/07/22 | Not Disclosed | 11/07/22 |
WP71.6 Pre-Cast Roof Slabs & Parapets | Notice | Cancelled | 03/08/22 | J: GBP 1m to 2.5m | 08/07/22 |
HS2 Euston Station - Graphic Design | Notice | Closed | 21/07/22 | Not Disclosed | 07/07/22 |
BBV HS2 MWCC North - Scour Protection | Notice | Closed | 11/07/22 | Not Disclosed | 04/07/22 |
EKFB JV - Supply of Bridge Deck Sub Surface drainage | Notice | Cancelled | 15/07/22 | Not Disclosed | 30/06/22 |
HS2 C1 ALIGN JV - Metal Cladding | Notice | Cancelled | 06/07/22 | Not Disclosed | 29/06/22 |
HS2 Main Works S1 & S2 - LOD5 Integrator - Design Coordination | Notice | Closed | 08/07/22 | J: GBP 1m to 2.5m | 24/06/22 |
SCS JV - HS2 Main Works S1 & S2 - Structural Health Monitoring | Notice | Closed | 01/07/22 | J: GBP 1m to 2.5m | 24/06/22 |
BBV HS2 MWCC North - Mobile Unit Visitor Centre | Notice | Closed | 28/06/22 | Not Disclosed | 23/06/22 |
OOC Conventional Station and Shared Accommodation Building (WP20) - Envelope/Cladding Works - Old Oak Common (S4) Station - HS2 copy | Notice | Withdrawn | 22/07/22 | O: GBP 20m - 30m | 22/06/22 |
HS2 Main Works S1 & S2 – Waterproofing WP088.4 | Notice | Cancelled | 05/07/22 | H: GBP 250k to 500k | 21/06/22 |
BBV HS2 MWCC North - Temporary Track Matting I.S. | Notice | Closed | 24/06/22 | Not Disclosed | 17/06/22 |
BBV HS2 MWCC North - Haulage Aggregates (Tippers) | Notice | Closed | 23/06/22 | Q: GBP 40m - 50m | 15/06/22 |
HS1 C1 ALIGN JV - Building Trades for Shafts and Portal Buildings | Notice | Cancelled | 22/06/22 | Not Disclosed | 15/06/22 |
EKFB JV - Supply of Bridge Deck Reservoir Board | Notice | Cancelled | 23/06/22 | Not Disclosed | 14/06/22 |
BBV HS2 MWCC North - Spreader Beams | Notice | Awarded | 24/06/22 | Not Disclosed | 13/06/22 |
BBV HS2 MWCC North - Class 2 suitable fill as per Specification for Highway Works | Notice | Closed | 21/06/22 | Not Disclosed | 13/06/22 |
Occupational Hygiene | Notice | Closed | 20/06/22 | E: GBP 50k to 100k | 13/06/22 |
EKFB Private Land Services/ Utilities G2S area | Notice | Awarded | 24/06/22 | H: GBP 250k to 500k | 10/06/22 |
BBV HS2 MWCC North - Stores Stock Management & Inventory System | Notice | Closed | 20/06/22 | Not Disclosed | 10/06/22 |
HS2 Main Works S1 & S2 - SCS Railways - Area East Roadworks | Notice | Closed | 01/07/22 | Not Disclosed | 10/06/22 |
Earthworks/Groundworks FRC inc. Beams | Notice | Closed | 20/06/22 | M: GBP 5m - 10m | 10/06/22 |
EKFB JV - Bird Control Services | Notice | Closed | 23/06/22 | Not Disclosed | 07/06/22 |
Heavy Lifting Tower Cranes (SP13.1.1)- Old Oak Common (S4) Station - HS2 | Notice | Awarded | 20/06/22 | M: GBP 5m - 10m | 06/06/22 |
Cadent Gas Works | Notice | Closed | 13/06/22 | Not Disclosed | 06/06/22 |
Site Accommodation | Notice | Closed | 13/06/22 | Not Disclosed | 06/06/22 |
HS2 Main Works S1 & S2 - WP313_Grout injection and repairs | Notice | ITT Issued | 13/06/22 | Not Disclosed | 01/06/22 |
BBV HS2 MWCC North - Crushing & Screening Materials | Notice | Closed | 10/06/22 | Not Disclosed | 31/05/22 |
HS2 Euston Station - Videography | Notice | Closed | 16/06/22 | Not Disclosed | 31/05/22 |
HS2 Euston Station - Site Photography | Notice | Closed | 16/06/22 | Not Disclosed | 31/05/22 |
BBV HS2 MWCC North - Reinforced Earth Wall - Installation | Notice | Withdrawn | 09/06/22 | Not Disclosed | 31/05/22 |
BBV HS2 MWCC North - Permanent GRP Formwork I.S | Notice | Closed | 06/06/22 | Not Disclosed | 26/05/22 |
Hoarding | Notice | Awarded | 30/05/22 | Not Disclosed | 23/05/22 |
Precast segmental viaduct – Segment shop drawings booklet | Notice | Awarded | 01/06/22 | G: GBP 150k to 250k | 19/05/22 |
BBV HS2 MWCC North - Asbestos Removal Sub-lot 4 | Notice | Closed | 27/05/22 | Not Disclosed | 19/05/22 |
BBV HS2 MWCC North - Ground Penetrating Radar Sub-lot 4 I.S | Notice | Closed | 27/05/22 | F: GBP 100k to 150k | 19/05/22 |
Sheet Piling | Notice | Closed | 27/05/22 | Not Disclosed | 18/05/22 |
Sheet Piling | Notice | Withdrawn | 27/05/22 | Not Disclosed | 18/05/22 |
Demolition Works copy | Notice | Withdrawn | 27/05/22 | Not Disclosed | 18/05/22 |
Bored Piling | Notice | Closed | 27/05/22 | Not Disclosed | 18/05/22 |
Demolition Works | Notice | Awarded | 27/05/22 | Not Disclosed | 18/05/22 |
BBV HS2 MWCC North - Waterproof Coating for Structures | Notice | Closed | 25/05/22 | Not Disclosed | 18/05/22 |
Enabling Works - Groundworks & Civils | Notice | Awarded | 27/05/22 | Not Disclosed | 17/05/22 |
Blockwork Package (WP41.1) - Old Oak Common (S4) Station - HS2 RE-OPEN | Notice | Cancelled | 22/05/22 | M: GBP 5m - 10m | 13/05/22 |
HS2 Euston Station - FF&E package - Maria Fidelis Accomodation | Notice | Closed | 19/05/22 | I: GBP 500k to 1m | 12/05/22 |
HS2 Main Works S1 & S2 - Euston Cavern Temporary Steelwork WP317 | Notice | Cancelled | 25/05/22 | H: GBP 250k to 500k | 10/05/22 |
Calvert - Perry Hill Road Realignment Safety Barrier Installation | Notice | Closed | 20/05/22 | F: GBP 100k to 150k | 05/05/22 |
Land Drainage Survey Works | Notice | Closed | 16/05/22 | J: GBP 1m to 2.5m | 05/05/22 |
EKFB - Plant & Equipment Recovery - Framework Opportunity | Notice | Closed | 17/05/22 | G: GBP 150k to 250k | 04/05/22 |
Calvert - School Hill Culvert installation and FRC works - Template copy copy | Notice | Closed | 09/05/22 | G: GBP 150k to 250k | 02/05/22 |
EKFB Grass Cutting - SW | Notice | Closed | 19/05/22 | Not Disclosed | 29/04/22 |
Calvert - School Hill Culvert installation and FRC works - Template copy | Notice | Closed | 09/05/22 | G: GBP 150k to 250k | 28/04/22 |
Calvert - Portway Culvert installation and FRC works | Notice | Awarded | 09/05/22 | Not Disclosed | 27/04/22 |
Blockwork Package (WP41.1) - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 08/05/22 | M: GBP 5m - 10m | 27/04/22 |
BBV HS2 MWCC North - Temporary removal of Heritage wall Curzon street | Notice | Closed | 04/05/22 | Not Disclosed | 27/04/22 |
EKFB Scaffolding T2G - SW | Notice | Awarded | 04/05/22 | Not Disclosed | 22/04/22 |
BBV HS2 MWCC North - Delta Junction – Lifting of precast beams at Curdworth Box | Notice | Closed | 22/04/22 | Not Disclosed | 13/04/22 |
HS2 MWCC S1 & S2 - WP205 - Electricity Sub Metering and Reporting | Notice | Cancelled | 22/04/22 | Not Disclosed | 13/04/22 |
EKFB JV - Accommodation Providers - Routewide | Notice | Cancelled | 31/05/22 | K: GBP 2.5m to 5m | 13/04/22 |
Concrete cutting & coring | Notice | Closed | 20/04/22 | I: GBP 500k to 1m | 08/04/22 |
Services | Notice | Closed | 20/04/22 | H: GBP 250k to 500k | 08/04/22 |
EKFB JV - Superstructure Works at Sheephouse Wood Bat Mitigation Structure (900m long PCC BEBO Arch & FRP Mesh Panels) | Notice | Closed | 21/04/22 | Not Disclosed | 07/04/22 |
BBV HS2 MWCC North - Ecological Mitigation - Delivery Phase | Notice | Closed | 29/04/22 | Not Disclosed | 06/04/22 |
HS2 Euston Station - Main Site Catering | Notice | Closed | 14/04/22 | Not Disclosed | 06/04/22 |
HS2 Main Works S1 & S2 - SCS Railways - WP036.4 River Pinn Realignment copy | Notice | Closed | 19/04/22 | Not Disclosed | 06/04/22 |
HS2 Main Works S1 & S2 - SCS Railways - WP036.2 River Pinn Realignment | Notice | Closed | 19/04/22 | Not Disclosed | 06/04/22 |
HS1 C1 ALIGN JV - Building Trades for Shafts and Portal Buildings | Notice | Cancelled | 12/04/22 | Not Disclosed | 05/04/22 |
White Collar Recruitment Rev 1 | Notice | Closed | 11/04/22 | Not Disclosed | 05/04/22 |
Blue Collar Recruitment Rev 1 | Notice | Closed | 11/04/22 | Not Disclosed | 05/04/22 |
EKFB JV - Training - Routewide Framework | Notice | Cancelled | 19/04/22 | I: GBP 500k to 1m | 05/04/22 |
Recycling/Reusing/Repurposing of Hi-Vis Workwear/PPE | Notice | Closed | 12/04/22 | I: GBP 500k to 1m | 05/04/22 |
BBV HS2 MWCC North - Delta Junction – PSV Erection tools certification technical assistance | Notice | Awarded | 08/04/22 | Not Disclosed | 04/04/22 |
BBV HS2 MWCC North - Delta - Precast Segmental Viaduc - Civil Engineering Permanent Instrumentation and Monitoring | Notice | Closed | 05/04/22 | Not Disclosed | 30/03/22 |
Temporary Acoustic Barriers - Timber | Notice | Cancelled | 25/04/22 | H: GBP 250k to 500k | 29/03/22 |
HS2 Euston Station - Main Substructure Works | Notice | Closed | 08/04/22 | T: GBP 100m - 250m | 29/03/22 |
Blackgrove Road Huts Asbestos Remoal | Notice | Closed | 01/04/22 | Not Disclosed | 24/03/22 |
HS2 Main Works S1 & S2 - WP148.3_Noise Barriers (Precast installation & FRC torsion beams) | Notice | Closed | 08/04/22 | K: GBP 2.5m to 5m | 24/03/22 |
BBV HS2 MWCC North - Sewer CCTV Surveys | Notice | Awarded | 01/04/22 | Not Disclosed | 24/03/22 |
BBV HS2 MWCC North - Temporary removal of Heritage wall Curzon street | Notice | Cancelled | 01/04/22 | Not Disclosed | 24/03/22 |
EKFB JV - Lifting Operations and Lifting Equipment Regulations (LOLER inspections) for Excavators | Notice | Closed | 07/04/22 | Not Disclosed | 23/03/22 |
HS2 Main Works S1 & S2 - SCS Railways - Euston Cavern - Muckaway Conveyor System | Notice | Cancelled | 06/04/22 | Not Disclosed | 23/03/22 |
BBV HS2 MWCC North - Directional Drilling | Notice | Closed | 15/04/22 | Not Disclosed | 22/03/22 |
HS2 Main Works S1 & S2 - SCS Railways - WP077 - Brick and Blockwork | Notice | Awarded | 28/03/22 | M: GBP 5m - 10m | 21/03/22 |
HS2 Main Works S1 & S2 - SCS Railways - WP085_Metalwork - Handrails and Balustrades AND/OR WP0211_Metalwork - Sundry | Notice | Awarded | 25/03/22 | I: GBP 500k to 1m | 21/03/22 |
HS2 Main Works S1 & S2 - Internal and External Metal Fire and Security Doors (WP084 Metal Doors) | Notice | Closed | 27/03/22 | J: GBP 1m to 2.5m | 18/03/22 |
HS2 C1 ALIGN JV - Attenuation Pond Lining | Notice | Awarded | 25/03/22 | Not Disclosed | 18/03/22 |
HS2 Main Works S1 & S2 - Cladding Packing (WP079 Timber cladding / WP184 Metal cladding / WP185 Brick cladding) | Notice | Cancelled | 25/03/22 | Not Disclosed | 17/03/22 |
SCS Accommodation Maintenance | Notice | Closed | 25/03/22 | K: GBP 2.5m to 5m | 16/03/22 |
HS2 Euston Station - Main Works Early Piling | Notice | Awarded | 24/03/22 | O: GBP 20m - 30m | 15/03/22 |
HS2 Euston Station - Cost Verification Consultancy Services | Notice | Awarded | 28/03/22 | J: GBP 1m to 2.5m | 14/03/22 |
Structured Cabling System (SCS) & Electronic Security System (ESS) Package - HS2 Euston | Notice | Closed | 22/03/22 | O: GBP 20m - 30m | 11/03/22 |
EKFB JV - Hospitality Wifi - Routewide | Notice | ITT Issued | 18/03/22 | I: GBP 500k to 1m | 09/03/22 |
ALIGN JV HS2 C1 - Firefighting Lifts | Notice | Cancelled | 16/03/22 | Not Disclosed | 09/03/22 |
Byrne Bros Labour Supply copy | Notice | Closed | 31/03/22 | Not Disclosed | 09/03/22 |
EKFB - Plant & Equipment Recovery - Framework Opportunity | Notice | Cancelled | 31/03/22 | G: GBP 150k to 250k | 09/03/22 |
Calvert - West Street OverBridge FRC | Notice | Closed | 31/03/22 | Not Disclosed | 08/03/22 |
BBV HS2 MWCC North - Landscaping And Seeding | Notice | Closed | 23/03/22 | Not Disclosed | 08/03/22 |
Head House roofing works and green roof installation - SCS JV/Main Works S1 and S2 | Notice | Cancelled | 11/03/22 | J: GBP 1m to 2.5m | 04/03/22 |
Calvert - Road paving | Notice | Awarded | 10/03/22 | Not Disclosed | 04/03/22 |
BBV HS2 MWCC North - Supply and Commission Gantry Crane - PA | Notice | Closed | 11/03/22 | Not Disclosed | 03/03/22 |
BBV HS2 MWCC North - Supply of Bridge Jacks - PA | Notice | Closed | 11/03/22 | Not Disclosed | 02/03/22 |
HS2 Main Works S1 & S2 - SCS Railways - Euston Cavern - Muckaway Conveyor System | Notice | Cancelled | 22/03/22 | Not Disclosed | 01/03/22 |
EKFB JV - Hydroseeding | Notice | Closed | 11/03/22 | Not Disclosed | 28/02/22 |
BBV HS2 MWCC North - LIW Cross Passages - Openings | Notice | Closed | 07/03/22 | Not Disclosed | 24/02/22 |
BBV HS2 MWCC North - LIW Cross Passages - Formwork OMa copy | Notice | Closed | 07/03/22 | Not Disclosed | 24/02/22 |
Mechanical, Electrical and Public Health Package - HS2 Euston | Notice | Closed | 08/03/22 | T: GBP 100m - 250m | 24/02/22 |
BBV HS2 MWCC North - LIW Cross Passages - Waterproofing OMa | Notice | Closed | 07/03/22 | Not Disclosed | 24/02/22 |
BBV HS2 MWCC North - Utilities Diversion (Design, Build, Design & Build) | Notice | Closed | 11/03/22 | Not Disclosed | 24/02/22 |
HS2 C1 ALIGN JV - Colne Valley Viaduct Deck FRC and associated Finishing Works | Notice | Awarded | 02/03/22 | Not Disclosed | 23/02/22 |
Temporary River Tame Pedestrian Bridge | Notice | Closed | 02/03/22 | Not Disclosed | 22/02/22 |
BBV HS2 MWCC North - Project Wide - Precast Slabs | Notice | Closed | 07/03/22 | N: GBP 10m - 20m | 22/02/22 |
HS2 Main Works S1 & S2 - WP077.2_Brickwork and Blockwork | Notice | Closed | 27/02/22 | Not Disclosed | 18/02/22 |
EKFB JV - Drainage Contractor | Notice | Cancelled | 04/03/22 | Not Disclosed | 17/02/22 |
EKFB JV Kerb Laying (Bridge Decks and surrounding area) | Notice | Closed | 03/03/22 | Not Disclosed | 17/02/22 |
EKFB JV - Independent Fabrication Quality Control | Notice | Withdrawn | 25/02/22 | Not Disclosed | 17/02/22 |
BBV HS2 MWCC North - Fabrication Drawings and Production of Metal Capping Beams-PB | Notice | Cancelled | 25/02/22 | Not Disclosed | 16/02/22 |
HS2 Main Works S1 & S2 - WP085_Metalwork - Handrails and Balustrades AND/OR WP0211_Metalwork - Sundry | Notice | Closed | 24/02/22 | Not Disclosed | 14/02/22 |
BBV HS2 MWCC North - Cross Passage Ground Investigation & Ground Improvement - OMa | Notice | Awarded | 23/02/22 | Not Disclosed | 11/02/22 |
EKFB JV - Soil Nailing | Notice | Cancelled | 03/03/22 | Not Disclosed | 11/02/22 |
BBV HS2 MWCC North - BBV - Delta - Precast Segmental Viaducts Erection of a gantry crane on segments manufacturing yard and Erection of short line beds on segments manufacturing yard | Notice | Awarded | 17/02/22 | Not Disclosed | 11/02/22 |
EKFB JV - Supply of Sheet Piling and Steel Capping Beams | Notice | Cancelled | 23/02/22 | Not Disclosed | 10/02/22 |
HS2 Main Works S1 & S2 - WP307 - Temporary Grout Shaft Sinking | Notice | Cancelled | 02/03/22 | Not Disclosed | 09/02/22 |
Byrne Bros Labour Supply | Notice | Closed | 01/03/22 | Not Disclosed | 09/02/22 |
HS2 Main Works S1 & S2 - WP009.1 - Euston Cavern Shaft Welfare | Notice | Cancelled | 22/02/22 | Not Disclosed | 08/02/22 |
HS2 Main Works S1 & S2 - SCS Railways - River Pinn Footbridge - WP025.4 | Notice | Awarded | 24/02/22 | Not Disclosed | 07/02/22 |
BBVS Extranet (SP21) - Old Oak Common (S4) Station - HS2 | Notice | Cancelled | 11/02/22 | Not Disclosed | 03/02/22 |
Visitor Centre (SP20) - Old Oak Common (S4) Station - HS2 | Notice | Cancelled | 18/02/22 | Not Disclosed | 02/02/22 |
HS2 Main Works S1 & S2 - WP148.5_Noise Barriers (Doors) | Notice | Cancelled | 11/02/22 | E: GBP 50k to 100k | 31/01/22 |
EKFB JV - Testing Requirements Relating to Precast Concrete Acoustic Barriers - NEC Subcontract Works | Notice | Closed | 11/02/22 | Not Disclosed | 28/01/22 |
HS2 Main Works S1 & S2 - WP148.4_Noise Barriers (Acoustic absorbers) | Notice | Closed | 11/02/22 | K: GBP 2.5m to 5m | 27/01/22 |
HS2 C1 ALIGN JV - North Portal Headwall - Civil Works | Notice | Awarded | 03/02/22 | Not Disclosed | 27/01/22 |
BBV HS2 MWCC North - Drainage | Notice | Closed | 04/02/22 | Not Disclosed | 27/01/22 |
BBV HS2 MWCC North - Formwork Design & Supply | Notice | Awarded | 28/01/22 | Not Disclosed | 20/01/22 |
BBV HS2 MWCC North - Gantry Pull Back | Notice | Closed | 26/01/22 | Not Disclosed | 19/01/22 |
Transport services for Hiabs | Notice | Closed | 28/01/22 | Not Disclosed | 17/01/22 |
Transport services for General haulage | Notice | Closed | 28/01/22 | Not Disclosed | 17/01/22 |
Transport services for Heavy haulage | Notice | Closed | 28/01/22 | Not Disclosed | 17/01/22 |
BBV HS2 MWCC North - BBV - Delta - Steelworks Consultancy | Notice | Awarded | 21/01/22 | Not Disclosed | 17/01/22 |
HS2 C1 ALIGN JV - Catering Pods for Remote Construction Sites | Notice | Cancelled | 21/01/22 | Not Disclosed | 17/01/22 |
HS2 C1 ALIGN JV - Structural Steel at Shaft Head Houses and Portal Buildings (Supply & Install) | Notice | ITT Issued | 28/01/22 | Not Disclosed | 14/01/22 |
HS2 C1 ALIGN JV - Colne Valley Viaduct Deck Waterproofing | Notice | Awarded | 20/01/22 | Not Disclosed | 13/01/22 |
BBV HS2 MWCC North - Pile Cropping | Notice | Closed | 27/01/22 | Not Disclosed | 13/01/22 |
BBV HS2 MWCC North - Plant Machine Control | Notice | Awarded | 20/01/22 | Not Disclosed | 11/01/22 |
BBV HS2 MWCC North - First Stage Concrete - Slipform - DM | Notice | Closed | 24/01/22 | Not Disclosed | 10/01/22 |
BBV HS2 MWCC North - STORES INVENTORY SYSTEM | Notice | Closed | 17/01/22 | Not Disclosed | 07/01/22 |
BBV HS2 MWCC North - BROT IS - Pressure Relief Wells & Inclinometers Drilling - OMa | Notice | Awarded | 17/01/22 | Not Disclosed | 07/01/22 |
HS2 Main Works S1 & S2 - WP028.3 - HROC Bridge Demolition | Notice | Closed | 20/01/22 | J: GBP 1m to 2.5m | 07/01/22 |
BBV HS2 MWCC North - BBV - Delta - Site Electrical Installations | Notice | Cancelled | 14/01/22 | Not Disclosed | 06/01/22 |
BBV HS2 MWCC North - DELTA PSV - Diabolos | Notice | Closed | 10/01/22 | Not Disclosed | 23/12/21 |
BBV HS2 MWCC North - DELTA - Supply of Inflatable Formwork | Notice | Awarded | 10/01/22 | Not Disclosed | 23/12/21 |
BBV HS2 MWCC North - Delta - Precast Segmental Viaduc - SIDE SPAN TRUSSES | Notice | Awarded | 07/01/22 | Not Disclosed | 20/12/21 |
HS2 Main Works S1 & S2 MEPH Electromagnetic Compatibility Consultancy Service | Notice | Closed | 10/01/22 | Not Disclosed | 20/12/21 |
HS2 Main Works S1 & S2 MEPH Acoustic Consultancy Services | Notice | Closed | 10/01/22 | Not Disclosed | 17/12/21 |
HS2 Main Works S1 & S2 MEPH HVAC/ Airside | Notice | Closed | 10/01/22 | Not Disclosed | 17/12/21 |
HS2 Main Works S1 & S2 MEPH Test and Commissioning Management | Notice | Closed | 10/01/22 | Not Disclosed | 17/12/21 |
HS2 Main Works S1 & S2 MEPH Electrical Installation | Notice | Closed | 10/01/22 | Not Disclosed | 17/12/21 |
HS2 Main Works S1 & S2 MEPH Mechanical Installation | Notice | Closed | 10/01/22 | Not Disclosed | 17/12/21 |
HS2 Main Works S1 & S2 MEPH Security & Access Control | Notice | Closed | 10/01/22 | Not Disclosed | 17/12/21 |
HS2 Main Works S1 & S2 MEPH Consolidation | Notice | Closed | 10/01/22 | Not Disclosed | 17/12/21 |
HS2 Main Works S1 & S2 MEPH Passive Fire Protection | Notice | Closed | 10/01/22 | Not Disclosed | 17/12/21 |
HS2 Main Works - SCS Railways - Tunnel Segments Structural Health Monitoring - WP305 | Notice | Awarded | 24/12/21 | Not Disclosed | 16/12/21 |
Bored pile casing and tooling required | Notice | Closed | 21/12/21 | Not Disclosed | 14/12/21 |
EKFB - Continuous Surface Wave (CSW) Testing - Routewide | Notice | Awarded | 17/12/21 | J: GBP 1m to 2.5m | 10/12/21 |
BBV HS2 MWCC North - MEP in permanent buildings at LIW and BRO Tunnels - OMa | Notice | Closed | 07/01/22 | Not Disclosed | 10/12/21 |
BBV HS2 MWCC North - DELTA - Supply of Welding Wire | Notice | Closed | 17/12/21 | Not Disclosed | 09/12/21 |
BBV HS2 MWCC North - DELTA - Supply of Concrete Spacers | Notice | Closed | 17/12/21 | Not Disclosed | 09/12/21 |
BBV HS2 MWCC North - DELTA - Maintenance walkway GRP panels | Notice | Closed | 16/12/21 | Not Disclosed | 08/12/21 |
BBV HS2 MWCC North - Supply of Bromford Tunnel Cast-In M16 Sockets - DGi | Notice | Closed | 14/12/21 | Not Disclosed | 06/12/21 |
BBV HS2 MWCC North - Vacuum Excavation - Waste Concrete | Notice | Closed | 13/12/21 | Not Disclosed | 06/12/21 |
HS2 Main Works S1 & S2 - SCS Railways - Belt Vulcanising - WP303 | Notice | Awarded | 10/12/21 | Not Disclosed | 03/12/21 |
BBV HS2 MWCC North - LIW&BRO Tunnels Cross Passages - OMa | Notice | Closed | 10/12/21 | Not Disclosed | 01/12/21 |
EKFB JV - FRC Works at Sheephouse Wood Bat Mitigation Structure (35,000m3) | Notice | Cancelled | 20/12/21 | P: GBP 30m - 40m | 29/11/21 |
EKFB JV - Mechanical & Electrical Works at Sheephouse Wood Bat Mitigation Structure (Service Buildings only) | Notice | Closed | 20/12/21 | Not Disclosed | 29/11/21 |
EKFB JV - Building Works at Sheephouse Wood Bat Mitigation Structure (Service Buildings only) | Notice | Closed | 20/12/21 | Not Disclosed | 29/11/21 |
EKFB JV - Civil Engineering/Ground Works to Sheephouse Wood Bat Mitigation Structure (Service Buildings only) | Notice | Closed | 20/12/21 | Not Disclosed | 29/11/21 |
EKFB Precast Concrete Planks -SW | Notice | Awarded | 30/11/21 | Not Disclosed | 23/11/21 |
WP002.2 Temporary Fencing | Notice | Closed | 03/12/21 | Not Disclosed | 23/11/21 |
WP020 Equipment - Non-Operated | Notice | ITT Issued | 03/12/21 | K: GBP 2.5m to 5m | 22/11/21 |
WP199 PPE | Notice | Closed | 03/12/21 | K: GBP 2.5m to 5m | 22/11/21 |
Janitorial materials WP296 | Notice | Closed | 03/12/21 | K: GBP 2.5m to 5m | 22/11/21 |
WP178 Mobile Craneage | Notice | Closed | 03/12/21 | Not Disclosed | 22/11/21 |
WP021 Crawler Cranes | Notice | Closed | 03/12/21 | Not Disclosed | 22/11/21 |
WP201 Builders Merchant | Notice | Closed | 03/12/21 | Not Disclosed | 22/11/21 |
WP018.1 Temporary Signage | Notice | Closed | 03/12/21 | Not Disclosed | 22/11/21 |
WP297 Site Tools, Fixings & Consumables | Notice | Closed | 03/12/21 | Not Disclosed | 22/11/21 |
WP298 Mesh & Reinforcement | Notice | Closed | 03/12/21 | Not Disclosed | 22/11/21 |
WP301 Stocked Steel | Notice | Closed | 03/12/21 | Not Disclosed | 22/11/21 |
WP255 First Aid Equipment | Notice | Closed | 03/12/21 | Not Disclosed | 22/11/21 |
WP299 Timber | Notice | Closed | 03/12/21 | Not Disclosed | 22/11/21 |
WP300 Lifting Gear & Equipment | Notice | Closed | 03/12/21 | Not Disclosed | 22/11/21 |
WP302 Fire Safety Equipment | Notice | Closed | 03/12/21 | Not Disclosed | 22/11/21 |
HS2 Euston Station - Refurbishment and Fit Out | Notice | Closed | 23/11/21 | Not Disclosed | 19/11/21 |
BBV HS2 MWCC North - Noise Barrier Panels | Notice | Closed | 26/11/21 | Not Disclosed | 17/11/21 |
EKFB JV - Supply of PCC Headwalls | Notice | Closed | 07/12/21 | J: GBP 1m to 2.5m | 16/11/21 |
BBV HS2 MWCC North - Expansion Joints - Project Wide | Notice | Closed | 25/11/21 | Not Disclosed | 16/11/21 |
BBV HS2 MWCC North - Plant Haulage Framework | Notice | Closed | 22/11/21 | J: GBP 1m to 2.5m | 16/11/21 |
WP177 Equipment - Operated | Notice | Awarded | 03/12/21 | R: GBP 50m - 70m | 15/11/21 |
Independent Third Party Inspection - WP1640 | Notice | Closed | 19/11/21 | D: GBP 25k to 50k | 12/11/21 |
HS2 - WP056E3.3 - Central Area Piling | Notice | Awarded | 18/11/21 | Not Disclosed | 10/11/21 |
SCS JV - HS2 Main Works S1 & S2 - WP075.4 Steelwork - Cross Passage Ramps | Notice | ITT Issued | 15/11/21 | K: GBP 2.5m to 5m | 08/11/21 |
BBV HS2 MWCC North - Screen Protection - Delta Junction | Notice | Awarded | 12/11/21 | Not Disclosed | 08/11/21 |
EKFB JV - Hydraulic Hoses | Notice | Closed | 19/11/21 | F: GBP 100k to 150k | 05/11/21 |
EKFB JV - Calvert South - Installation of Reinforced Earth Embankment (Station Road Overbridge) | Notice | Cancelled | 03/12/21 | Not Disclosed | 05/11/21 |
Full Size CPR Training Manikin required | Notice | Cancelled | 12/11/21 | Not Disclosed | 05/11/21 |
EKFB JV - Civil Engineering/Ground Works to Green Tunnel Services Building | Notice | Closed | 19/11/21 | Not Disclosed | 05/11/21 |
HS1 C1 ALIGN JV - CVV Pre-cast Factory Magnetic Lifting Beam | Notice | Cancelled | 10/11/21 | Not Disclosed | 04/11/21 |
BBV HS2 MWCC North - Vehicle Restraint Systems (VRS) | Notice | Awarded | 17/11/21 | Not Disclosed | 03/11/21 |
BBV HS2 MWCC North - Road Markings | Notice | Awarded | 17/11/21 | Not Disclosed | 03/11/21 |
BBV HS2 MWCC North - Street Lighting and Traffic Signs | Notice | Awarded | 16/11/21 | Not Disclosed | 03/11/21 |
BBV HS2 MWCC North - Traffic Signals | Notice | Closed | 17/11/21 | Not Disclosed | 03/11/21 |
Continuous polythene layflat tubing | Notice | Cancelled | 09/11/21 | Not Disclosed | 02/11/21 |
BBV HS2 MWCC North - Delta - Precast Segmental Viaduc - Deck's Jigs | Notice | Awarded | 12/11/21 | Not Disclosed | 29/10/21 |
BBV HS2 MWCC North - Avonmouth - Fiber Dispenser: supply and delivery - OMa | Notice | Withdrawn | 03/11/21 | Not Disclosed | 27/10/21 |
Slipform Guidewall | Notice | Closed | 02/11/21 | I: GBP 500k to 1m | 26/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems | Notice | ITT Issued | 01/11/21 | Not Disclosed | 25/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems | Notice | ITT Issued | 01/11/21 | Not Disclosed | 25/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems | Notice | ITT Issued | 01/11/21 | Not Disclosed | 25/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems | Notice | ITT Issued | 01/11/21 | Not Disclosed | 25/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems | Notice | ITT Issued | 01/11/21 | Not Disclosed | 25/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems | Notice | ITT Issued | 01/11/21 | Not Disclosed | 25/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems | Notice | ITT Issued | 01/11/21 | Not Disclosed | 25/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems | Notice | ITT Issued | 01/11/21 | Not Disclosed | 25/10/21 |
BBV HS2 MWCC North - Drill & service wells and assist with consents. 3 nr boreholes | Notice | Closed | 08/11/21 | Not Disclosed | 25/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems | Notice | Closed | 01/11/21 | Not Disclosed | 25/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems | Notice | ITT Issued | 01/11/21 | Not Disclosed | 25/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems | Notice | ITT Issued | 01/11/21 | Not Disclosed | 25/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems | Notice | ITT Issued | 01/11/21 | Not Disclosed | 25/10/21 |
BBV HS2 MWCC North - Asbestos Consultant | Notice | Cancelled | 08/11/21 | Not Disclosed | 25/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems | Notice | ITT Issued | 01/11/21 | Not Disclosed | 25/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems | Notice | Closed | 01/11/21 | Not Disclosed | 25/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems | Notice | ITT Issued | 01/11/21 | Not Disclosed | 25/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems | Notice | ITT Issued | 01/11/21 | Not Disclosed | 25/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems | Notice | ITT Issued | 01/11/21 | Not Disclosed | 25/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems | Notice | ITT Issued | 01/11/21 | Not Disclosed | 25/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems | Notice | ITT Issued | 01/11/21 | Not Disclosed | 25/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems | Notice | ITT Issued | 01/11/21 | Not Disclosed | 25/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems | Notice | ITT Issued | 01/11/21 | Not Disclosed | 25/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems | Notice | ITT Issued | 01/11/21 | Not Disclosed | 25/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems | Notice | ITT Issued | 01/11/21 | Not Disclosed | 25/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems | Notice | ITT Issued | 01/11/21 | Not Disclosed | 25/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems | Notice | Closed | 01/11/21 | Not Disclosed | 25/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems | Notice | ITT Issued | 01/11/21 | Not Disclosed | 25/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems | Notice | ITT Issued | 29/10/21 | Not Disclosed | 25/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems | Notice | ITT Issued | 01/11/21 | Not Disclosed | 25/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems copy | Notice | ITT Issued | 29/10/21 | Not Disclosed | 25/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems | Notice | ITT Issued | 29/10/21 | Not Disclosed | 22/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems copy | Notice | ITT Issued | 29/10/21 | Not Disclosed | 22/10/21 |
High Speed Two (HS2) Limited Railway Systems Tunnel and Lineside Mechanical and Electrical (M&E) Systems | Notice | ITT Issued | 29/10/21 | Not Disclosed | 22/10/21 |
Mechanical, Electrical Public Health Package (WP23) - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 08/11/21 | T: GBP 100m - 250m | 22/10/21 |
BBV HS2 MWCC North - Conversion of existing gas fired Central Heating and Domestic Hot Water system to Air Source Heat Pump system | Notice | Awarded | 27/10/21 | Not Disclosed | 20/10/21 |
Building Regulation Control Package (SP1.5) - Old Oak Common (S4) Station - HS2 | Notice | Withdrawn | 29/10/21 | I: GBP 500k to 1m | 20/10/21 |
Building Regulation Control Package (SP1.5) - Old Oak Common (S4) Station - HS2 | Notice | ITT Issued | 29/10/21 | I: GBP 500k to 1m | 20/10/21 |
HS2 Main Works S1 & S2 - WP000(TBC) - Lime & GGBS Silos and Dosing | Notice | Closed | 25/10/21 | J: GBP 1m to 2.5m | 19/10/21 |
EKFB JV – Installation of de-watering system (filter drains) at Greatworth Green Tunnel | Notice | Closed | 01/11/21 | Not Disclosed | 18/10/21 |
BBV HS2 MWCC North - Supply and Erection of Storage Building | Notice | Awarded | 22/10/21 | Not Disclosed | 18/10/21 |
BBV HS2 MWCC North - BROT East Portal – Shutter can manufacture and delivery - OMa | Notice | Awarded | 22/10/21 | Not Disclosed | 15/10/21 |
Small plant equipment required for purchase | Notice | Cancelled | 22/10/21 | Not Disclosed | 15/10/21 |
HS2 Main Works S1 & S2 - SCS Railways - Cable Jointing | Notice | Awarded | 26/10/21 | Not Disclosed | 14/10/21 |
HS2 Main Works S1 & S2 - SCS Railways - Cable Pulling | Notice | Awarded | 26/10/21 | Not Disclosed | 14/10/21 |
HS2 Main Works S1 & S2 - WP171 SCL Formwork | Notice | Awarded | 19/10/21 | K: GBP 2.5m to 5m | 13/10/21 |
Security Services | Notice | Cancelled | 15/10/21 | Not Disclosed | 08/10/21 |
BBV HS2 MWCC North - Scaffolding | Notice | Closed | 15/10/21 | Not Disclosed | 08/10/21 |
BBV HS2 MWCC North - Waterproofing | Notice | Closed | 20/10/21 | Not Disclosed | 08/10/21 |
BBV HS2 MWCC North - Streetlighting for Compounds | Notice | Awarded | 13/10/21 | Not Disclosed | 08/10/21 |
EKFB JV Ecology Works | Notice | Awarded | 21/10/21 | Not Disclosed | 08/10/21 |
BBV HS2 MWCC North - Erection Tools | Notice | Awarded | 20/10/21 | Not Disclosed | 07/10/21 |
BBV HS2 MWCC North - Scaffolding | Notice | Withdrawn | 18/05/22 | Not Disclosed | 06/10/21 |
HS2 Main Works S1 & S2 - SCS Railways - Advanced Plantation - WP289 | Notice | Awarded | 15/10/21 | Not Disclosed | 06/10/21 |
IT Supplies required | Notice | Closed | 13/10/21 | A: Up to GBP 5k | 06/10/21 |
Setting Out Services - Template copy | Notice | Withdrawn | 13/10/21 | A: Up to GBP 5k | 06/10/21 |
BBV HS2 MWCC North - Drilling | Notice | Closed | 18/05/22 | Not Disclosed | 06/10/21 |
BBV HS2 MWCC North - Vegetation Clearance Works | Notice | Awarded | 08/10/21 | Not Disclosed | 04/10/21 |
Euston Approaches - WP240.1 - Office & Site Welfare Cleaning | Notice | Cancelled | 15/10/21 | Not Disclosed | 30/09/21 |
Silos/tanks required | Notice | Cancelled | 04/10/21 | I: GBP 500k to 1m | 27/09/21 |
BBV HS2 MWCC North - Tunnel Rescue Sets - DM | Notice | Closed | 29/09/21 | Not Disclosed | 22/09/21 |
SCS JV Building Mitigation & Protection Works Opportunity | Notice | Closed | 06/10/21 | Not Disclosed | 22/09/21 |
Euston Approaches - Specialist Trackside Works & Labour | Notice | Awarded | 29/09/21 | Not Disclosed | 22/09/21 |
HS2 Euston Station - Tower Cranes | Notice | ITT Issued | 29/09/21 | Not Disclosed | 22/09/21 |
SCS JV - HS2 Main Works S1 & S2 - FRC Shaft Internals (Area West) | Notice | ITT Issued | 29/09/21 | K: GBP 2.5m to 5m | 15/09/21 |
HS2 C1 ALIGN JV - Compressor Servicing & Maintenance | Notice | Closed | 22/09/21 | Not Disclosed | 15/09/21 |
BBV HS2 MWCC North - Invasive Non-Native Species Removal and Management | Notice | Awarded | 27/09/21 | Not Disclosed | 10/09/21 |
BBV HS2 MWCC North - Hedgerow Maintenance | Notice | Closed | 27/09/21 | Not Disclosed | 10/09/21 |
HS2 C1 ALIGN JV - Cross Passage Conveyor | Notice | Cancelled | 16/09/21 | Not Disclosed | 10/09/21 |
BBV HS2 MWCC North - Prefabricated Store Building | Notice | Closed | 15/09/21 | Not Disclosed | 09/09/21 |
Dewatering/Depressurisation of Cross Passages | Notice | Awarded | 16/09/21 | I: GBP 500k to 1m | 09/09/21 |
Bridge works (Hydraulic jacking, bearing maintenance/replacement, structural strengthening) | Notice | Awarded | 16/09/21 | I: GBP 500k to 1m | 08/09/21 |
Listed Building/Heritage works (Remedials) | Notice | Awarded | 16/09/21 | I: GBP 500k to 1m | 08/09/21 |
Civils and Substructures (Remedials) | Notice | Cancelled | 16/09/21 | I: GBP 500k to 1m | 08/09/21 |
Building and Services (Remedials) | Notice | Awarded | 16/09/21 | I: GBP 500k to 1m | 08/09/21 |
SCS JV - HS2 Main Works S1 & S2 - Steelwork - Head House (West) | Notice | ITT Issued | 22/09/21 | J: GBP 1m to 2.5m | 07/09/21 |
BBV HS2 MWCC North - SL4 - Independent Third Party Inspection | Notice | Closed | 15/09/21 | Not Disclosed | 06/09/21 |
BBV HS2 MWCC North - Human Resources Management System (HRMS) | Notice | Awarded | 10/09/21 | Not Disclosed | 03/09/21 |
EKFB - Supply of Cement | Notice | Cancelled | 20/09/21 | J: GBP 1m to 2.5m | 02/09/21 |
HS2 Euston Station - Catering | Notice | Cancelled | 10/09/21 | Not Disclosed | 30/08/21 |
SCS JV - HS2 Main Works S1 & S2 - FRC Internal Works and Structural Steelwork | Notice | Cancelled | 08/09/21 | J: GBP 1m to 2.5m | 26/08/21 |
HS2 C1 ALIGN JV - Temporary Structural Steel Props & Platforms (Supply Only) | Notice | Awarded | 31/08/21 | Not Disclosed | 24/08/21 |
BBV HS2 MWCC North - Delta - Precast Segmental Viaduc - Diabolos | Notice | Awarded | 03/09/21 | Not Disclosed | 23/08/21 |
HS2 - WP056H3 - Cross Passage's 33 & 34 Pre-treatment Package - Ground Freezing draft | Notice | Closed | 26/08/21 | K: GBP 2.5m to 5m | 19/08/21 |
HS2 - WP056H3 - Cross Passage's 33 & 34 Pre-treatment Package - Jet Grouting | Notice | Closed | 27/08/21 | K: GBP 2.5m to 5m | 19/08/21 |
BBV HS2 MWCC North - Rail Specialist Contractors | Notice | Closed | 25/08/21 | Not Disclosed | 18/08/21 |
BBV HS2 MWCC North - Hydroseeding | Notice | Awarded | 24/08/21 | Not Disclosed | 17/08/21 |
EKFB JV - Highways Works Calvert South | Notice | Closed | 07/09/21 | M: GBP 5m - 10m | 17/08/21 |
HS2 - WP056E2.4 - West Ruislip Noise Barrier Piling | Notice | Closed | 27/08/21 | Not Disclosed | 16/08/21 |
HS2 Euston - Traction Substation - MEP Installations | Notice | Closed | 20/08/21 | M: GBP 5m - 10m | 13/08/21 |
EKFB JV - Pile Cap Cropping | Notice | Awarded | 18/08/21 | Not Disclosed | 11/08/21 |
HS2 C1 ALIGN JV - Mechanical and Electrical Installations at the 5 Shafts / Headhouses and 2 Tunnel Portal Buildings | Notice | Cancelled | 31/08/21 | Not Disclosed | 11/08/21 |
Bridge Works | Notice | Awarded | 16/08/21 | J: GBP 1m to 2.5m | 10/08/21 |
Civils and Substructures | Notice | Awarded | 16/08/21 | I: GBP 500k to 1m | 10/08/21 |
Building and Remedials | Notice | Awarded | 16/08/21 | I: GBP 500k to 1m | 10/08/21 |
SCS JV - HS2 Main Works S1 & S2 - Welding Inspection Package WP278 | Notice | Awarded | 20/08/21 | E: GBP 50k to 100k | 09/08/21 |
BBV HS2 MWCC North - Mainline - Design and Supply of Bearings | Notice | Closed | 13/08/21 | Not Disclosed | 09/08/21 |
BBV HS2 MWCC North - Logistics for Precast Tunnel Segments and Reinforcement | Notice | Closed | 13/08/21 | Not Disclosed | 05/08/21 |
BBV HS2 MWCC North - CCTV Drainage Surveys | Notice | Awarded | 13/08/21 | Not Disclosed | 05/08/21 |
EKFB - Plant Puncture Repairs & Tyres - Framework Opportunity | Notice | Awarded | 23/08/21 | H: GBP 250k to 500k | 02/08/21 |
HS2 C1 ALIGN JV - Pre Construction Condition Surveys | Notice | Awarded | 09/08/21 | Not Disclosed | 02/08/21 |
HS2 Main Works S1 & S2 - WP148_Noise Barriers (precast reinforced-concrete noise barrier panels on a supply-only basis) | Notice | Awarded | 10/08/21 | K: GBP 2.5m to 5m | 30/07/21 |
BBV HS2 MWCC North - Precast Concrete Parapets | Notice | Awarded | 17/08/21 | Not Disclosed | 29/07/21 |
HS2 Euston Station - Facilities Management | Notice | Closed | 11/08/21 | K: GBP 2.5m to 5m | 29/07/21 |
Water Proofing Materials for Culverts | Notice | Closed | 11/08/21 | Not Disclosed | 28/07/21 |
Temporary Electrics, Water and Site Services (WP39.1) - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 11/08/21 | I: GBP 500k to 1m | 27/07/21 |
Temporary Electrics, Water and Site Services (WP39.1) - Old Oak Common (S4) Station - HS2 | Notice | Withdrawn | 11/08/21 | I: GBP 500k to 1m | 27/07/21 |
EKFB JV - Piling Works for Acoustic Barrier Installation - NEC Subcontract Works | Notice | Closed | 20/07/21 | M: GBP 5m - 10m | 15/07/21 |
EKFB JV - Steel columns forming part of route wide acoustic barrier - NEC Subcontract Works | Notice | Closed | 20/07/21 | M: GBP 5m - 10m | 15/07/21 |
EKFB JV - Precast concrete panels forming part of route wide acoustic barrier - NEC Subcontract Works | Notice | Closed | 20/07/21 | N: GBP 10m - 20m | 15/07/21 |
EKFB JV - Acoustic steel gates forming part of the route wide acoustic barrier - NEC Subcontract Works | Notice | Closed | 20/07/21 | I: GBP 500k to 1m | 15/07/21 |
EKFB JV - Acoustic Barrier Supply and Installation - NEC Subcontract Works | Notice | Closed | 20/07/21 | P: GBP 30m - 40m | 15/07/21 |
HS2 C1 ALIGN JV - North Portal Platforms | Notice | Awarded | 21/07/21 | Not Disclosed | 14/07/21 |
HS2 Main Works S1 & S2 - WP262_Customs Brokerage | Notice | Cancelled | 16/07/21 | Not Disclosed | 08/07/21 |
SCS JV - HS2 Main Works S1 & S2 - Welding Package (TBM) | Notice | Awarded | 11/07/21 | H: GBP 250k to 500k | 05/07/21 |
HS2 Main works S1 & S2 - Temporary Signage | Notice | Closed | 12/07/21 | C: GBP 15k to 25k | 02/07/21 |
HS2 C1 ALIGN JV - Tunnel LED Strip Lighting | Notice | Closed | 06/07/21 | Not Disclosed | 30/06/21 |
Services | Notice | Closed | 09/07/21 | I: GBP 500k to 1m | 30/06/21 |
BBV HS2 MWCC North - Delta - Survey services | Notice | Awarded | 06/07/21 | Not Disclosed | 25/06/21 |
EKFB JV - Noise Mitigation | Notice | Awarded | 09/07/21 | Not Disclosed | 24/06/21 |
HS2 C1 ALIGN JV - Towable Welfare Units | Notice | Awarded | 30/06/21 | Not Disclosed | 23/06/21 |
HS2 Main Works S1 & S2 - SCS JV - Southern Treatment Area Steelwork - Area West - WP259 | Notice | Awarded | 30/06/21 | J: GBP 1m to 2.5m | 22/06/21 |
EKFB JV - Portal Buildings | Notice | Closed | 20/07/21 | Not Disclosed | 22/06/21 |
HS2 C1 ALIGN JV - Mining Deduster's for Cross Passage's | Notice | Awarded | 28/06/21 | Not Disclosed | 21/06/21 |
HS2 Main Works - SCS Railways - Cooling Plant - WP228 | Notice | Awarded | 25/06/21 | Not Disclosed | 21/06/21 |
HS2 C1 ALIGN JV - Launching Girder Assembly Works | Notice | Awarded | 23/06/21 | Not Disclosed | 17/06/21 |
BBV HS2 MWCC North - Dunton Hall | Notice | Closed | 22/06/21 | Not Disclosed | 17/06/21 |
HS2 C1 ALIGN JV - Tunnelling Surveyors | Notice | Cancelled | 23/06/21 | Not Disclosed | 17/06/21 |
HS2 C1 ALIGN JV - Survey Equipment | Notice | ITT Issued | 23/06/21 | Not Disclosed | 17/06/21 |
HS2 Main Works S1 & S2 - SCS Railways - Highway Barriers - WP098 | Notice | Awarded | 29/06/21 | Not Disclosed | 15/06/21 |
HS2 Main Works S1 & S2 – WP070.3 – DESIGN AND SUPPLY OF FORMWORK & FALSEWORK EQUIPMENT AND MATERIALS | Notice | Closed | 28/06/21 | Not Disclosed | 15/06/21 |
EKFB - Environmental (Professional Services) Provider - Framework Opportunity | Notice | Cancelled | 28/06/21 | Not Disclosed | 15/06/21 |
BBV HS2 MWCC North - Hydro Demolition | Notice | Awarded | 21/06/21 | Not Disclosed | 15/06/21 |
Temporary Works Design | Notice | Closed | 26/06/21 | E: GBP 50k to 100k | 14/06/21 |
HS2 Main Works S1 & S2 - SCS Railways - Hard Landscaping - WP182.1 | Notice | Awarded | 25/06/21 | Not Disclosed | 11/06/21 |
EKFB - 2No Tyred Gantry Cranes for offloading ISO Containers at Greatmoor Sidings | Notice | Closed | 22/06/21 | J: GBP 1m to 2.5m | 09/06/21 |
HS2 Main Works S1 & S2 - SCS Railways - MEP Workshop WP115.1 | Notice | Awarded | 18/06/21 | Not Disclosed | 04/06/21 |
BBV HS2 MWCC North - BROT IS – Removal of Contaminated Spoil at D-Wall location - OMa | Notice | Closed | 11/06/21 | Not Disclosed | 02/06/21 |
Concrete flow tables | Notice | Closed | 04/06/21 | Not Disclosed | 28/05/21 |
EKFB - Surveying Equipment Consumables & Equipment Hire - Framework Opportunity | Notice | Cancelled | 04/06/21 | I: GBP 500k to 1m | 26/05/21 |
HS2 C1 ALIGN JV - Fabricated Steel Temporary Platforms | Notice | Closed | 02/06/21 | Not Disclosed | 26/05/21 |
HS2 Main Works S1 & S2 - Site Radios Framework WP188 | Notice | Cancelled | 04/06/21 | E: GBP 50k to 100k | 26/05/21 |
HS2 Main Works S1 & S2 - Mobile Cranes Framework WP178 | Notice | Cancelled | 04/06/21 | M: GBP 5m - 10m | 25/05/21 |
HS2 Main Works S1 & S2 - Crawler Cranes Framework WP021 | Notice | Cancelled | 04/06/21 | N: GBP 10m - 20m | 25/05/21 |
HS2 Euston Station - Asbestos Surveys Services | Notice | Closed | 14/06/21 | G: GBP 150k to 250k | 24/05/21 |
EKFB JV - Temporary mechanical and electrical systems - Tunnels | Notice | Awarded | 11/06/21 | Not Disclosed | 21/05/21 |
EKFB JV - Thame Valley Viaduct | Notice | Awarded | 04/06/21 | Not Disclosed | 21/05/21 |
EKFB JV - Traffic Sign Supply & Installation | Notice | Awarded | 04/06/21 | J: GBP 1m to 2.5m | 21/05/21 |
EKFB JV - Temporary and Permanent Road Marking Contractor | Notice | Awarded | 04/06/21 | Not Disclosed | 21/05/21 |
HS2 Main Works S1 & S2 - WP066 Equipment - Hoists | Notice | Awarded | 26/05/21 | Not Disclosed | 21/05/21 |
HS2 Main Works S1 & S2 - WP088.2 Waterproofing (Shafts & Adits) | Notice | Awarded | 26/05/21 | Not Disclosed | 21/05/21 |
HS2 Main Works S1 & S2 - WP249 Conveyor Installation | Notice | Awarded | 26/05/21 | Not Disclosed | 21/05/21 |
BBV HS2 MWCC North - Multi-strands jack handlers | Notice | Awarded | 11/06/21 | Not Disclosed | 20/05/21 |
BBV HS2 MWCC North - SD & RW – Ancillary tasks (coring, sawcutting, hydrodemolition) | Notice | Awarded | 28/05/21 | Not Disclosed | 19/05/21 |
EKFB - Hire of Siltbusters (Option for disposal of waste arising) & Water Pumps - Framework Opportunity | Notice | Awarded | 28/05/21 | I: GBP 500k to 1m | 18/05/21 |
Commissioning and Validation Package (WP38) - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 09/06/21 | I: GBP 500k to 1m | 18/05/21 |
Earthing & Lightning Protection (WP37.1) - Old Oak Common (S4) Station - HS2 | Notice | Cancelled | 03/06/21 | H: GBP 250k to 500k | 18/05/21 |
Escalators - Design, Supply, Install & Commission (WP33) - Old Oak Common (S4) Station - HS2 | Notice | Cancelled | 01/06/21 | K: GBP 2.5m to 5m | 18/05/21 |
HS2 Main Works S1 & S2 - SCS Railways - Soft Landscaping - WP181 | Notice | Closed | 28/05/21 | Not Disclosed | 17/05/21 |
EKFB - Fire Risk Assessments within a tunnel environment | Notice | Awarded | 31/05/21 | J: GBP 1m to 2.5m | 17/05/21 |
BBV HS2 MWCC North - PSV DELTA JUNCTION - PSV – Edge protection and safety barriers | Notice | Awarded | 26/05/21 | Not Disclosed | 17/05/21 |
EKFB - General Civil Works Contractor (Various) - Framework Sub-contract Opportunity | Notice | Closed | 11/06/21 | Not Disclosed | 14/05/21 |
Lifts - Design, Supply, Install & Commission (WP32) - Old Oak Common (S4) Station - HS2 | Notice | Cancelled | 01/06/21 | K: GBP 2.5m to 5m | 12/05/21 |
EKFB - Hire of Concrete Washout Plant (Option for disposal of waste arising) - Framework Opportunity | Notice | Awarded | 21/05/21 | H: GBP 250k to 500k | 12/05/21 |
BBV HS2 MWCC North - LIW North & South Portals – Borehole Decommissioning - OMa | Notice | Awarded | 25/05/21 | Not Disclosed | 12/05/21 |
Lift & Escalator Consultancy Service (SP18) - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 01/06/21 | I: GBP 500k to 1m | 12/05/21 |
BBV HS2 MWCC North - SL4 & Delta - Major and Minor Temporary Scaffolding Works | Notice | Awarded | 18/05/21 | Not Disclosed | 11/05/21 |
HS2 Main Works S1 & S2 - WP133.1 Water Treatment Plants | Notice | Awarded | 25/05/21 | I: GBP 500k to 1m | 11/05/21 |
HS2 Main Works - SCS Railways - Integrated Fire/Comms/Public Health Systems - WP116 | Notice | Awarded | 16/05/21 | Not Disclosed | 11/05/21 |
EKFB - General Construction Materials - Supply Only - Framework Opportunity | Notice | Awarded | 14/05/21 | J: GBP 1m to 2.5m | 07/05/21 |
EKFB - Site Consumables - Supply Only - Framework Opportunity | Notice | Awarded | 14/05/21 | J: GBP 1m to 2.5m | 07/05/21 |
HS2 Main Works S1 & S2 - WPo36.2 - Earthworks (South WTS & Treatment, South SPA & Copthall Backfill) | Notice | Awarded | 13/05/21 | K: GBP 2.5m to 5m | 04/05/21 |
BBV HS2 MWCC North - Sub Lot 1 - Tallington Civils | Notice | Closed | 14/05/21 | Not Disclosed | 04/05/21 |
BBV HS2 MWCC North - Sub Lot 1 D-Wall contaminated ground removal | Notice | Closed | 18/05/21 | Not Disclosed | 04/05/21 |
HS2 C1 - North and South Porous Portal | Notice | ITT Issued | 07/05/21 | Not Disclosed | 30/04/21 |
BBV HS2 MWCC North - Noise Insulation (Survey & Installation Works) | Notice | Closed | 07/05/21 | Not Disclosed | 28/04/21 |
Site Signage (SP9.12) - Old Oak Common (S4) Station - HS2 | Notice | Cancelled | 07/05/21 | Not Disclosed | 27/04/21 |
BBV HS2 MWCC North - Water Treatment Plant | Notice | Awarded | 03/05/21 | Not Disclosed | 26/04/21 |
BBV HS2 MWCC North - Sub Lot 1 Bromford STP FRC Works Scaffold | Notice | Closed | 03/05/21 | Not Disclosed | 26/04/21 |
BBV HS2 MWCC North - Sub Lot 1 Bromford STP & Tunnels Ducting | Notice | Closed | 03/05/21 | Not Disclosed | 26/04/21 |
BBV HS2 MWCC North - Sub Lot 1 Bromford STP FRC Works Scaffold | Notice | Closed | 03/05/21 | Not Disclosed | 26/04/21 |
BBV HS2 MWCC North - Ancient Woodland Translocation Works (Ecological Mitigation) | Notice | Closed | 29/04/21 | Not Disclosed | 23/04/21 |
BBV HS2 MWCC North - Handling and transportation of M42-M6 Toll Motorway spans by means of SPMT | Notice | Awarded | 30/04/21 | Not Disclosed | 22/04/21 |
BBV HS2 MWCC North - Sewer Diversion Tunnelling Design & Construction | Notice | Awarded | 28/04/21 | Not Disclosed | 21/04/21 |
HS2 Main Works S1 & S2, WP088 Sparayed Waterproofing | Notice | Awarded | 03/05/21 | J: GBP 1m to 2.5m | 19/04/21 |
BBV HS2 MWCC North - Sub Lot 1 Legionella Consultant | Notice | Closed | 30/04/21 | Not Disclosed | 19/04/21 |
BBV HS2 MWCC North - Passive Relief Wells - Sublot 2 | Notice | Closed | 16/04/21 | Not Disclosed | 19/04/21 |
BBV HS2 MWCC North - Sublot 4 & Delta Junction Steel Fixing Works | Notice | Awarded | 23/04/21 | M: GBP 5m - 10m | 16/04/21 |
BBV HS2 MWCC North - Sheet Piling | Notice | Awarded | 25/04/21 | Not Disclosed | 15/04/21 |
HS2 C1 - Polyethylene (PE) (or equivalent material property) manufactured Shims and Wedges | Notice | Awarded | 20/04/21 | Not Disclosed | 14/04/21 |
HS2 C1 - Gym Equipment | Notice | Awarded | 20/04/21 | Not Disclosed | 14/04/21 |
BBV HS2 MWCC North - Ground Stabilisation Works | Notice | Awarded | 20/04/21 | Not Disclosed | 14/04/21 |
BBV HS2 MWCC North - SL5s Kerb Laying Package | Notice | Awarded | 16/04/21 | Not Disclosed | 07/04/21 |
300kva Generator & MDU required for hire | Notice | Awarded | 08/04/21 | Not Disclosed | 05/04/21 |
BBV HS2 MWCC North - Treatment and disposal of contaminated materials | Notice | Awarded | 09/04/21 | Not Disclosed | 31/03/21 |
BBV HS2 MWCC North - Deep Drainage - Micro Tunnelling (WP/CM) | Notice | Awarded | 08/04/21 | Not Disclosed | 31/03/21 |
BBV HS2 MWCC North - LIW South Portal – Active Wells in TBM Breakout Box - OMa | Notice | Awarded | 16/04/21 | Not Disclosed | 31/03/21 |
HS2 Main Works S1 & S2 - WP002.1 Temporary Hoarding and Fencing | Notice | Awarded | 14/04/21 | I: GBP 500k to 1m | 31/03/21 |
HS2 Main Works S1 & S2 - WP234.1_Golf Course Archaeology | Notice | Awarded | 06/04/21 | J: GBP 1m to 2.5m | 26/03/21 |
HS2 Main Works S1 & S2 WP082.08 MEP Budget 2 Estimating Services | Notice | Closed | 16/04/21 | Not Disclosed | 26/03/21 |
HS2 C1 - TBM Hyperbaric Services | Notice | Awarded | 30/03/21 | Not Disclosed | 24/03/21 |
EKFB JV - Supply of Alvenius and/or Svebra pipe systems for tunnelling project | Notice | Awarded | 04/04/21 | Not Disclosed | 24/03/21 |
EKFB JV - Framework Opportunity for the Route wide Construction Ground Movements Monitoring | Notice | Awarded | 04/04/21 | Not Disclosed | 23/03/21 |
HS2 C1 - Secondary Lining of the Cross Passages | Notice | Closed | 29/03/21 | Not Disclosed | 23/03/21 |
HS2 C1 - Waterproofing of the Cross Passages | Notice | Awarded | 29/03/21 | Not Disclosed | 23/03/21 |
HS2 C1 - Excavation and Primary Lining for Cross Passages | Notice | Closed | 29/03/21 | Not Disclosed | 23/03/21 |
HS2 C1 - Collar for Cross Passages (Civil Works) | Notice | Closed | 29/03/21 | Not Disclosed | 23/03/21 |
HS2 C1 - Breakout of Cross Passages | Notice | Awarded | 29/03/21 | Not Disclosed | 23/03/21 |
BBV HS2 MWCC North - Precast Segmental Viaducts - HAZID / HAZOP Analysis | Notice | Awarded | 01/04/21 | Not Disclosed | 23/03/21 |
BBV HS2 MWCC North - Secondary Permanent Ground Markers Installation and Determination | Notice | Awarded | 29/03/21 | Not Disclosed | 22/03/21 |
BBV HS2 MWCC - Plant Equipment | Notice | Closed | 31/03/21 | Not Disclosed | 22/03/21 |
BBV HS2 MWCC - Maintenance Equipment | Notice | Awarded | 30/03/21 | Not Disclosed | 22/03/21 |
Welder services | Notice | Cancelled | 23/03/21 | Not Disclosed | 18/03/21 |
WP173 TBM Launching and Reception Structures | Notice | Awarded | 25/03/21 | K: GBP 2.5m to 5m | 18/03/21 |
EKFB JV - Temporary Works Design - For Gas Main Protection Slabs (must be Lloyds registered approved) | Notice | Awarded | 31/03/21 | G: GBP 150k to 250k | 18/03/21 |
Track Tamping Works to GWML (WP6.2) - Old Oak Common (S4) Station - HS2 | Notice | Cancelled | 01/04/21 | H: GBP 250k to 500k | 18/03/21 |
BBV HS2 MWCC NORTH - Tower Cranes | Notice | Closed | 25/03/21 | Not Disclosed | 18/03/21 |
Supply of sand | Notice | Cancelled | 24/03/21 | Not Disclosed | 18/03/21 |
HS2 Main Works S1 & S2 - WP063.3_Shaft Sinking and Construction | Notice | Awarded | 19/03/21 | K: GBP 2.5m to 5m | 16/03/21 |
EKFB JV - Remediation Specialist | Notice | Awarded | 26/03/21 | Not Disclosed | 16/03/21 |
Form Traveller - Viaduct Structures | Notice | Awarded | 26/03/21 | Not Disclosed | 16/03/21 |
BBV HS2 MWCC North - De-watering Works | Notice | Cancelled | 24/03/21 | Not Disclosed | 15/03/21 |
HS2 C1 - Tunnel / Mine Self Rescuers | Notice | Closed | 19/03/21 | Not Disclosed | 12/03/21 |
HS2 C1 - Minor Civils Works | Notice | Cancelled | 19/03/21 | Not Disclosed | 12/03/21 |
HS2 Euston Station - Highways, Minor Civils and BWIC | Notice | Closed | 22/03/21 | K: GBP 2.5m to 5m | 11/03/21 |
Temporary Cross Passage Fire Rated Doors for Green Tunnels | Notice | ITT Issued | 24/03/21 | Not Disclosed | 10/03/21 |
HS2 C1 - Ultra High Performance Fibre Reinforced Concrete (UHPFRC) Precast Parapets | Notice | Awarded | 16/03/21 | Not Disclosed | 09/03/21 |
Transient Dynamic Integrity Testing for small and large diameter bored piles | Notice | Cancelled | 16/03/21 | Not Disclosed | 09/03/21 |
BBV HS2 MWCC North - Formwork, Reinforcement & Concrete | Notice | Closed | 12/03/21 | Not Disclosed | 08/03/21 |
BBV HS2 MWCC North - Earthworks | Notice | Closed | 12/03/21 | Not Disclosed | 08/03/21 |
BBV HS2 MWCC North - Drainage Works | Notice | Closed | 12/03/21 | Not Disclosed | 08/03/21 |
BBV HS2 MWCC North - Civils Works | Notice | Closed | 12/03/21 | Not Disclosed | 08/03/21 |
BBV HS2 MWCC North - Precast Segmental Viaducts – Precast Yard utilities Design, Supply,Installation and Commissioning | Notice | Awarded | 12/03/21 | Not Disclosed | 05/03/21 |
BBV HS2 MWCC North - Precast Segmental Viaducts - Transportation of Precast Segments | Notice | Awarded | 12/03/21 | Not Disclosed | 04/03/21 |
BBV HS2 MWCC North - Track, Signalling and Telecoms rail works associated with underbridge construction | Notice | Awarded | 12/03/21 | I: GBP 500k to 1m | 03/03/21 |
Concrete slab installation | Notice | Awarded | 11/03/21 | Not Disclosed | 03/03/21 |
BBV HS2 MWCC North - Pile Cropping | Notice | Closed | 12/03/21 | Not Disclosed | 02/03/21 |
HS2 C1 - Viaduct Precast Segment Rebar Lifting Beams and Racks | Notice | ITT Issued | 04/03/21 | Not Disclosed | 26/02/21 |
BBV HS2 MWCC North - King Post Piling | Notice | Awarded | 05/03/21 | Not Disclosed | 25/02/21 |
WP107 - Tunnelling Labour | Notice | Closed | 04/03/21 | T: GBP 100m - 250m | 25/02/21 |
BBV HS2 MWCC North - Security CCTV supply | Notice | Awarded | 03/03/21 | Not Disclosed | 24/02/21 |
Crane Supply for HS2 works | Notice | Closed | 05/03/21 | I: GBP 500k to 1m | 24/02/21 |
BBV HS2 MWCC North - Oil/Lifting Tackle Storage Containers - DM | Notice | Closed | 08/03/21 | Not Disclosed | 22/02/21 |
BBV HS2 MWCC North - Wheel Wash - DM | Notice | Closed | 26/02/21 | Not Disclosed | 19/02/21 |
HS2 C1 - Industrial Gas Supply | Notice | Awarded | 25/02/21 | Not Disclosed | 18/02/21 |
BBV HS2 MWCC NORTH - Plant Maintenance Workshop | Notice | Awarded | 25/02/21 | H: GBP 250k to 500k | 18/02/21 |
BBV HS2 MWCC North - FRC Works | Notice | Closed | 25/02/21 | Not Disclosed | 18/02/21 |
HS2 C1 - Viaduct Precast Segment Rebar Reinforcement Jigs | Notice | Awarded | 23/02/21 | Not Disclosed | 17/02/21 |
Pre-cast Concrete L-Shape Retaining Walls | Notice | Awarded | 24/02/21 | J: GBP 1m to 2.5m | 17/02/21 |
HS2 C1 - Operated Plant | Notice | Closed | 22/02/21 | Not Disclosed | 15/02/21 |
HS2 C1 - Supply of Non-Operated Plant | Notice | Closed | 22/02/21 | Not Disclosed | 15/02/21 |
HS2 C1 - Supply of Site Welfare | Notice | Closed | 22/02/21 | Not Disclosed | 15/02/21 |
HS2 C1 - Supply of Lifting Equipment | Notice | Closed | 22/02/21 | Not Disclosed | 15/02/21 |
HS2 C1 - Supply of Survey and Safety Equipment | Notice | Closed | 22/02/21 | Not Disclosed | 15/02/21 |
HS2 C1 - Supply of Generators | Notice | Closed | 22/02/21 | Not Disclosed | 15/02/21 |
HS2 C1 - Supply of Powered Access | Notice | Closed | 22/02/21 | Not Disclosed | 15/02/21 |
HS2 C1 - Viaduct Precast Segment Rebar Reinforcement Jigs | Notice | Withdrawn | 19/02/21 | Not Disclosed | 12/02/21 |
HS2 Main Works S1 & S2 - WP148.1_Noise Barriers (Testing) | Notice | Awarded | 24/02/21 | I: GBP 500k to 1m | 12/02/21 |
Lifting equipment inspection specialist | Notice | Cancelled | 19/02/21 | Not Disclosed | 12/02/21 |
BBV HS2 MWCC North - Temporary Sheet Piling Works SL5s | Notice | Awarded | 19/02/21 | Not Disclosed | 12/02/21 |
HS2 Main Works S1 & S2 - WP175 Equipment - Hyperbaric Chamber | Notice | Awarded | 26/02/21 | Not Disclosed | 11/02/21 |
HS2 Main Works S1 & S2 - WP114 Equipment - Grouting Plant | Notice | Cancelled | 26/02/21 | Not Disclosed | 11/02/21 |
BBV HS2 MWCC North - Surfacing Works | Notice | Awarded | 18/02/21 | Not Disclosed | 11/02/21 |
HS2 Main Works S1 & S2 - WP234_Golf Course | Notice | Awarded | 26/02/21 | M: GBP 5m - 10m | 11/02/21 |
HS2 Main Works S1 & S2 - WP142 Equipment Crane TBM | Notice | Closed | 12/02/21 | Not Disclosed | 09/02/21 |
BBV HS2 MWCC North - Single Track Segments Short Line Beds | Notice | Awarded | 17/02/21 | Not Disclosed | 09/02/21 |
HS2 C1 - Supply of Power Tools | Notice | Awarded | 15/02/21 | Not Disclosed | 09/02/21 |
HS2 C1 - Tunnel Boring Machine Toilets | Notice | Awarded | 12/02/21 | Not Disclosed | 05/02/21 |
HS2 C1 - Shaft Civil Works - Internal Structures, Basement and Headhouse | Notice | Awarded | 12/02/21 | Not Disclosed | 05/02/21 |
BBV HS2 MWCC North - Pre-Cast Concrete Units | Notice | Awarded | 12/02/21 | Not Disclosed | 05/02/21 |
HS2 Main Works - SCS Railways - Temporary Tunnel Walkways and Brackets - WP104 | Notice | Awarded | 16/02/21 | Not Disclosed | 05/02/21 |
BBV HS2 MWCC North - Service & Maintenance of Fire Protection Systems fitted to Mobile Plant & Vehicle Package ref TES-T1-102- SN | Notice | Closed | 17/02/21 | Not Disclosed | 05/02/21 |
BBV HS2 MWCC North - Precast Segmental Viaducts - Cable stays, post-tensioning and jacking activities | Notice | Awarded | 10/02/21 | K: GBP 2.5m to 5m | 03/02/21 |
BBV HS2 MWCC North - Precast Segmental Viaducts - Access stairs | Notice | Awarded | 10/02/21 | H: GBP 250k to 500k | 03/02/21 |
HS2 Euston - Early Contractor Involvement - LU Traction Power Installations | Notice | Awarded | 10/02/21 | Not Disclosed | 03/02/21 |
HS1 C1 - Stabilisation (Lime/Cement) of the Tunnel Arisings | Notice | Cancelled | 09/02/21 | Not Disclosed | 02/02/21 |
HS2 C1 - Stabilisation (Lime/Cement) at the South Portal | Notice | Cancelled | 09/02/21 | Not Disclosed | 02/02/21 |
HS2 C1 - Pile Arisings from Colne Valley Viaduct Piling Works | Notice | Awarded | 09/02/21 | Not Disclosed | 02/02/21 |
HS2 C1_ Facilities Management Contract | Notice | Cancelled | 09/02/21 | Not Disclosed | 02/02/21 |
HS2 Main Works S1 & S2 WP082.3 Mechanical Construction Consultancy | Notice | Closed | 15/02/21 | Not Disclosed | 01/02/21 |
BBV HS2 MWCC North - FRC Works | Notice | Closed | 09/02/21 | Not Disclosed | 01/02/21 |
BBV HS2 MWCC North - Supply of Cement - Grout Constituent Material | Notice | Closed | 07/02/21 | Not Disclosed | 01/02/21 |
HS2 Main Works S1 & S2 WP082.2 Electrical Construction Consultancy | Notice | Closed | 12/02/21 | Not Disclosed | 01/02/21 |
PM55 Concrete pump hire services | Notice | Cancelled | 05/02/21 | Not Disclosed | 01/02/21 |
HS2 Station and Shared Accommodation Building & Central Overbridge (WP10) - Envelope Works - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 12/02/21 | R: GBP 50m - 70m | 29/01/21 |
OOC Conventional Station and Shared Accommodation Building (WP20) - Envelope/Cladding Works - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 12/02/21 | O: GBP 20m - 30m | 29/01/21 |
OOC Conventional Station and Shared Accommodation Building Structural Steelwork (WP18) - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 12/02/21 | K: GBP 2.5m to 5m | 29/01/21 |
HS2 C1 - Drum Crushers for the Tunnel Boring Machine | Notice | Awarded | 04/02/21 | Not Disclosed | 28/01/21 |
HS2 C1 - General Site Consumables | Notice | Awarded | 04/02/21 | Not Disclosed | 28/01/21 |
BBV HS2 MWCC North - Customs Agent | Notice | Awarded | 10/02/21 | Not Disclosed | 27/01/21 |
HS2 C1 - Steel Rigid and Flexible Ducts for Temporary Ventilation | Notice | Closed | 02/02/21 | Not Disclosed | 27/01/21 |
HS2 C1 - Bulk Supply of Sulphuric Acid (96%) | Notice | Awarded | 02/02/21 | Not Disclosed | 26/01/21 |
BBV HS2 MWCC North - UXO Surveys | Notice | Cancelled | 05/02/21 | Not Disclosed | 26/01/21 |
Temporary Ventilation & Air Quality Monitoring | Notice | Awarded | 10/02/21 | Not Disclosed | 26/01/21 |
Supply of site consumables | Notice | Awarded | 02/02/21 | I: GBP 500k to 1m | 25/01/21 |
Waterproofing and Firestopping to precast concrete cut and cover tunnels | Notice | Awarded | 09/02/21 | Not Disclosed | 25/01/21 |
Support Fluid Slabs | Notice | Awarded | 01/02/21 | Not Disclosed | 25/01/21 |
Supply of Labour and Equipment for Construction of Robust Kerbs – Via Slipform Method | Notice | ITT Issued | 08/02/21 | Not Disclosed | 25/01/21 |
HS2 C1 - Steel Brackets for Pipes and Walkways in the Tunnels | Notice | Closed | 01/02/21 | Not Disclosed | 25/01/21 |
Temporary Propping Framework Agreement | Notice | Awarded | 29/01/21 | H: GBP 250k to 500k | 25/01/21 |
BBV HS2 MWCC North - Waste Management | Notice | Awarded | 29/01/21 | M: GBP 5m - 10m | 22/01/21 |
BBV HS2 MWCC North - Concrete Agitating Hopper | Notice | Closed | 05/02/21 | Not Disclosed | 22/01/21 |
HS2 C1 - Geotextiles, Drainage pipes and Manholes for Tunnels | Notice | Awarded | 29/01/21 | Not Disclosed | 22/01/21 |
Supply of lifting equipment | Notice | Awarded | 30/01/21 | I: GBP 500k to 1m | 22/01/21 |
BBV HS2 MWCC North - Formworks & Falseworks - Supply Only | Notice | ITT Issued | 29/01/21 | Not Disclosed | 21/01/21 |
Transport services | Notice | Awarded | 31/01/21 | Not Disclosed | 21/01/21 |
Fuel supply | Notice | Cancelled | 30/01/21 | J: GBP 1m to 2.5m | 20/01/21 |
Small plant hire | Notice | Awarded | 27/01/21 | H: GBP 250k to 500k | 20/01/21 |
BBV HS2 MWCC North - Viaduct Parapets | Notice | Closed | 30/01/21 | K: GBP 2.5m to 5m | 20/01/21 |
HS2 C1 - Viaduct Precast Self-Propelled Modular Transporters (SPMT) | Notice | Awarded | 26/01/21 | Not Disclosed | 20/01/21 |
HS2 C1 - Refuge Chambers | Notice | Awarded | 26/01/21 | Not Disclosed | 20/01/21 |
BBV HS2 MWCC North - Supply and Install of Weighbridges | Notice | Awarded | 25/01/21 | H: GBP 250k to 500k | 19/01/21 |
BBV HS2 MWCC North - Supply of Structual Shear Keys | Notice | Awarded | 29/01/21 | Not Disclosed | 15/01/21 |
BBV HS2 MWCC North - Crawler Cranes | Notice | Awarded | 29/01/21 | Not Disclosed | 14/01/21 |
Old Oak Common, London – Vegetation Clearance Subcontract (SP4.1) | Notice | Awarded | 21/01/21 | G: GBP 150k to 250k | 14/01/21 |
BBV HS2 MWCC North - Tower Cranes | Notice | Closed | 27/01/21 | Not Disclosed | 14/01/21 |
Permanent Bridge Beam Infill Shuttering Systems - GRP Forms | Notice | Awarded | 28/01/21 | M: GBP 5m - 10m | 13/01/21 |
Temporary Formwork Systems and Shoring Systems | Notice | Cancelled | 28/01/21 | M: GBP 5m - 10m | 13/01/21 |
BBV HS2 MWCC North - Hydraulic Splitters | Notice | Closed | 27/01/21 | Not Disclosed | 13/01/21 |
BBV HS2 MWCC North - Surfacing Works | Notice | Awarded | 20/01/21 | Not Disclosed | 13/01/21 |
HS2 C1 - Site Equipment | Notice | Closed | 19/01/21 | Not Disclosed | 13/01/21 |
HS2 C1 - Corporate Branded & Non-Branded Signage for External and Internal Use | Notice | Awarded | 18/01/21 | Not Disclosed | 11/01/21 |
HS2 Main Works S1 & S2 WP082.5 Building Management System Design and Build | Notice | Closed | 18/01/21 | Not Disclosed | 11/01/21 |
Crowd Barriers | Notice | Awarded | 29/01/21 | D: GBP 25k to 50k | 07/01/21 |
HS2 C1 - Site Service Vehicles | Notice | Closed | 14/01/21 | Not Disclosed | 07/01/21 |
BBV HS2 MWCC North - Temporary Props and Walers | Notice | Awarded | 22/01/21 | Not Disclosed | 06/01/21 |
BBV HS2 MWCC North - Road Lining - DM | Notice | Closed | 15/01/21 | Not Disclosed | 04/01/21 |
BBV HS2 MWCC North - Hyperbaric Chamber Supply -Hire/Purchase - DM | Notice | Closed | 18/01/21 | Not Disclosed | 04/01/21 |
BBV HS2 MWCC North - Road Lining - DM | Notice | Withdrawn | 15/01/21 | Not Disclosed | 24/12/20 |
BBV HS2 MWCC North - Diamond Drilling & Sawing - DM | Notice | Closed | 15/01/21 | Not Disclosed | 24/12/20 |
BBV HS2 MWCC North - Engineering & Plant Compliance Inspections - DM | Notice | Closed | 15/01/21 | Not Disclosed | 24/12/20 |
BBV HS2 MWCC North - Generators Hire/Buy - DM | Notice | Closed | 05/01/21 | Not Disclosed | 22/12/20 |
BBV HS2 Site Wide - Storage/COSHH Container Supply (purchase)- DM | Notice | Closed | 08/01/21 | Not Disclosed | 21/12/20 |
Corporate Branded & Non-branded external signage | Notice | Awarded | 15/01/21 | F: GBP 100k to 150k | 18/12/20 |
BBV HS2 Mainline Wide - Standard Template - Vegetation Clearance Package- CM | Notice | Awarded | 08/01/21 | Not Disclosed | 18/12/20 |
Corporate Printing, Reprographics & Corporate Internal Site Signage - Framework | Notice | Awarded | 11/01/21 | E: GBP 50k to 100k | 15/12/20 |
HS2 Euston Station - Site Wide Temporary Utiliies and MEP Package | Notice | Awarded | 05/01/21 | J: GBP 1m to 2.5m | 15/12/20 |
HS2 - WP056H2 - Compensation Grouting Package | Notice | Awarded | 18/12/20 | N: GBP 10m - 20m | 15/12/20 |
BBV HS2 - Labour Requisitioning Portal | Notice | Closed | 15/12/20 | Not Disclosed | 15/12/20 |
HS2 Main Works S1 & S2 WP082.4 Fire Systems | Notice | Closed | 18/12/20 | Not Disclosed | 10/12/20 |
BBV HS2 MWCC North - Sheet Piling - Temporary and Permanent Works | Notice | Awarded | 18/12/20 | N: GBP 10m - 20m | 10/12/20 |
HS2 Main Works S1 & S2 WP082.7 Lightning Protection | Notice | Closed | 18/12/20 | Not Disclosed | 09/12/20 |
HS2 Euston - Intrusive Structural Surveying - London Underground Areas | Notice | Awarded | 14/12/20 | Not Disclosed | 07/12/20 |
HS2 Euston - Intrusive Structural Surveying - London Underground | Notice | Withdrawn | 14/12/20 | Not Disclosed | 07/12/20 |
HS2 Euston Station - Site Wide Logistics Package | Notice | Awarded | 15/12/20 | K: GBP 2.5m to 5m | 07/12/20 |
Surveying Management | Notice | Awarded | 14/12/20 | Not Disclosed | 07/12/20 |
HS2 Main Works S1 & S2 WP082.6 Lifts | Notice | Closed | 11/12/20 | Not Disclosed | 04/12/20 |
BBV HS2 MWCC North - Formwork & Falsework Equipment and Materials - Hire | Notice | Awarded | 11/12/20 | H: GBP 250k to 500k | 03/12/20 |
Provision of Setting Out Engineer | Notice | Cancelled | 10/12/20 | Not Disclosed | 03/12/20 |
OOC Conventional Station and Shared Accommodation Building: FRC Civil and Excavation works (WP17) - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 08/01/21 | O: GBP 20m - 30m | 01/12/20 |
BBV HS2 MWCC North - Bridge Bearings | Notice | Closed | 08/12/20 | H: GBP 250k to 500k | 30/11/20 |
Old Oak Common Lane Widening, Lowering, Utility Diversions & Retaining Walls(WP34.5) - Old Oak Common (S4) Station - HS2 | Notice | Cancelled | 24/12/20 | O: GBP 20m - 30m | 30/11/20 |
HS2 Main Works S1 & S2 - Area Central Catering Facilities | Notice | Closed | 04/12/20 | Not Disclosed | 27/11/20 |
BBV HS2 MWCC North - Precast Segmental Viaducts - Formwork Sets for Piers, Pier Heads & Bearing Plinths | Notice | Awarded | 04/12/20 | Not Disclosed | 26/11/20 |
BBV HS2 MWCC North - Precast Segmental Viaducts - Formwork Sets for Abutments | Notice | Awarded | 04/12/20 | Not Disclosed | 26/11/20 |
Electrical Installers | Notice | Awarded | 04/12/20 | Not Disclosed | 25/11/20 |
InSAR monitoring design services | Notice | Awarded | 01/12/20 | Not Disclosed | 20/11/20 |
HS2 Main Works S1 & S2 - WP242 ARLT Steelwork Propping | Notice | Closed | 27/11/20 | Not Disclosed | 20/11/20 |
Property Condition Surveys | Notice | Awarded | 03/12/20 | Not Disclosed | 20/11/20 |
Hire or Supply of Lighting Tower Units | Notice | Cancelled | 27/11/20 | Not Disclosed | 17/11/20 |
BBV HS2 MWCC North - Electricity and Gas | Notice | Awarded | 23/11/20 | Not Disclosed | 16/11/20 |
BBV HS2 MWCC North - Chemical Pile Trimming | Notice | Closed | 27/11/20 | Not Disclosed | 16/11/20 |
BBV HS2 MWCC North - Water | Notice | Closed | 23/11/20 | Not Disclosed | 16/11/20 |
HS2 Euston Station - Security Package | Notice | Awarded | 30/11/20 | Not Disclosed | 16/11/20 |
Mobile Elevating Work Platforms (MEWPS) - Stage 2 | Notice | Awarded | 27/11/20 | J: GBP 1m to 2.5m | 16/11/20 |
Blue Collar Recruitment | Notice | Closed | 30/11/20 | Not Disclosed | 16/11/20 |
White Collar Recruitment | Notice | Closed | 30/11/20 | Not Disclosed | 16/11/20 |
Cranes - Stage 2 | Notice | Awarded | 25/11/20 | Not Disclosed | 16/11/20 |
Jetting & CCTV Package | Notice | Closed | 19/11/20 | E: GBP 50k to 100k | 12/11/20 |
Flow Meter Installation Package | Notice | Closed | 19/11/20 | C: GBP 15k to 25k | 12/11/20 |
GPR Survey Package | Notice | Closed | 19/11/20 | C: GBP 15k to 25k | 12/11/20 |
BBV HS2 MWCC North - Gantry Crane | Notice | Awarded | 19/11/20 | I: GBP 500k to 1m | 11/11/20 |
BBV HS2 MWCC North - Concrete Pump | Notice | ITT Issued | 19/11/20 | F: GBP 100k to 150k | 11/11/20 |
BBV HS2 MWCC North - Manufacture of Deviator Tubes | Notice | Awarded | 20/11/20 | Not Disclosed | 11/11/20 |
Commercial/Industrial Shed - SCS JV Area Central | Notice | Awarded | 17/11/20 | G: GBP 150k to 250k | 10/11/20 |
BBV HS2 MWCC North - Temporary Brook Diversion | Notice | Awarded | 13/11/20 | Not Disclosed | 05/11/20 |
HS2 C1 - Supply of Bentonite for M25 | Notice | Awarded | 11/11/20 | Not Disclosed | 04/11/20 |
HS2 Main Works - SCS Railways - Temporary Tunnel Ventilation - WP186 | Notice | Awarded | 13/11/20 | K: GBP 2.5m to 5m | 04/11/20 |
HS2 C1 - Temporary Ventilation Fans | Notice | Awarded | 10/11/20 | Not Disclosed | 03/11/20 |
Piling - GWML Station & Shared Accommodation Building - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 11/12/20 | K: GBP 2.5m to 5m | 02/11/20 |
Provision of Social Listening Services | Notice | Cancelled | 11/11/20 | Not Disclosed | 28/10/20 |
BBV HS2 MWCC North - DB Schenker Cargo - Office Relocation | Notice | Closed | 02/11/20 | H: GBP 250k to 500k | 26/10/20 |
HS2 C1 - Lime Supply | Notice | Closed | 02/11/20 | Not Disclosed | 26/10/20 |
HS2 C1 - Portland Cement Supply | Notice | Closed | 02/11/20 | Not Disclosed | 26/10/20 |
HS2 Main Works S1 & S2 - Concrete cutting works | Notice | Closed | 29/10/20 | H: GBP 250k to 500k | 23/10/20 |
HS2 - WP056E2.2 - Copthall Area Piling Package 1 | Notice | Closed | 28/10/20 | K: GBP 2.5m to 5m | 21/10/20 |
HS2 Main Works - SCS Railways - WP111 - HV Substations | Notice | Awarded | 27/10/20 | Not Disclosed | 20/10/20 |
HS2 Main Works S1 & S2, WP075.1 - Steel bridge beams | Notice | Closed | 26/10/20 | I: GBP 500k to 1m | 19/10/20 |
HS2 Main Works S1 & S2 - WPo36.1 - Earthworks | Notice | Awarded | 26/10/20 | J: GBP 1m to 2.5m | 19/10/20 |
HS2 Main Works S1 & S2 WP082 Building Services Design | Notice | Closed | 21/10/20 | Not Disclosed | 14/10/20 |
HS2 C1 - Supply of Mobile Concrete Pump | Notice | Awarded | 21/10/20 | Not Disclosed | 14/10/20 |
BBV HS2 MWCC North - Specialist Equipment | Notice | Closed | 16/10/20 | Not Disclosed | 14/10/20 |
BBV HS2 MWCC North - Lifting travelling hoist | Notice | Closed | 16/10/20 | Not Disclosed | 14/10/20 |
BBV HS2 MWCC North - Sludge Pump & Concrete washwater treatment system | Notice | Closed | 16/10/20 | Not Disclosed | 14/10/20 |
BBV HS2 MWCC North - Concrete Pump Trucks | Notice | Awarded | 16/10/20 | Not Disclosed | 14/10/20 |
BBV HS2 MWCC North - Mobile Cranes | Notice | Awarded | 16/10/20 | Not Disclosed | 14/10/20 |
BBV HS2 MWCC North - Tower Cranes | Notice | Closed | 16/10/20 | Not Disclosed | 14/10/20 |
BBV HS2 MWCC North - Transporter - Trailer Moving Units | Notice | Closed | 16/10/20 | Not Disclosed | 14/10/20 |
BBV HS2 MWCC North - Provision of Draughtsmen / CAD Technicians | Notice | Awarded | 20/10/20 | Not Disclosed | 12/10/20 |
HS2 Euston Station - Complex Multi Utility Diversionary Works | Notice | Closed | 19/10/20 | P: GBP 30m - 40m | 12/10/20 |
HS2 C1 - Viaduct Precast Segment Formwork Cells | Notice | Awarded | 16/10/20 | Not Disclosed | 09/10/20 |
Excavators & Dumpers (Attendances) - Stage 2 | Notice | Awarded | 21/10/20 | M: GBP 5m - 10m | 08/10/20 |
BBV HS2 MWCC North - Mainline Civils - Earthworks - Drainage Framework | Notice | Closed | 16/10/20 | Not Disclosed | 08/10/20 |
Network Rail Possession and Isolation Resource - Old Oak Common (S4) Station - HS2 | Notice | Cancelled | 22/10/20 | G: GBP 150k to 250k | 07/10/20 |
HS2 N1/N2 – Structures Plant - General Capex | Notice | Closed | 13/10/20 | Not Disclosed | 06/10/20 |
HS2 Main Civils Works S1 and S2 sectors - WP071_A_Pre-cast Concrete (Area West PCC elements) | Notice | Awarded | 14/10/20 | J: GBP 1m to 2.5m | 05/10/20 |
BBV HS2 MWCC North - Sublot 4 (Birmingham Spur) - Insitu Concrete Structures - Formwork, Concrete & Reinforcement (FRC) Works copy | Notice | Closed | 09/10/20 | Not Disclosed | 02/10/20 |
BBV HS2 MWCC North - Delta Junction - Insitu Concrete Structures - Formwork, Concrete & Reinforcement (FRC) Works | Notice | Awarded | 09/10/20 | Not Disclosed | 01/10/20 |
Expansion Joints | Notice | Awarded | 14/10/20 | Not Disclosed | 01/10/20 |
BBV HS2 MWCC North - Washwood Heath Bulk Earthworks Package | Notice | Closed | 07/10/20 | Not Disclosed | 01/10/20 |
HS2 C1 - Supply of Tower Cranes | Notice | Closed | 06/10/20 | Not Disclosed | 30/09/20 |
HS2 C1 - Provision of branding services for external buildings | Notice | Awarded | 06/10/20 | Not Disclosed | 30/09/20 |
HS2 C1 - Tunnel Communication System | Notice | Awarded | 05/10/20 | Not Disclosed | 29/09/20 |
BBV HS2 MWCC North Ashrow Over Bridge Precast Concrete Bridge Beams and Parapets | Notice | Closed | 02/10/20 | Not Disclosed | 25/09/20 |
Provision of Bat Licence & Monitoring (Calvert Area) | Notice | Awarded | 06/10/20 | Not Disclosed | 25/09/20 |
HS2 Euston Station - Collaboration Consultancy | Notice | Closed | 07/10/20 | I: GBP 500k to 1m | 24/09/20 |
HS2 Main Works S1 & S2 - Site Office Cleaning | Notice | Awarded | 30/09/20 | Not Disclosed | 23/09/20 |
Supply & Delivery of Stationery - Framework | Notice | Awarded | 30/09/20 | H: GBP 250k to 500k | 21/09/20 |
HS2 - WP056E3.2 - Central Piling Package 1 | Notice | Closed | 28/09/20 | K: GBP 2.5m to 5m | 21/09/20 |
BBV HS2 MWCC North - Design & Supply of Culverts | Notice | Closed | 22/09/20 | Not Disclosed | 17/09/20 |
SP3.1 Digital Tools - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 30/09/20 | I: GBP 500k to 1m | 17/09/20 |
DESIGN AND SUPPLY OF FORMWORK & FALSEWORK EQUIPMENT AND MATERIALS FOR LONG ITCHINGTON WOOD AND LONG ITCHINGTON GREEN PORTALS | Notice | Closed | 21/09/20 | H: GBP 250k to 500k | 16/09/20 |
BBV HS2 MWCC North - Fencing (Permanent / Temporary & Environmental) Supply & Install | Notice | Cancelled | 30/09/20 | O: GBP 20m - 30m | 16/09/20 |
HS2 N1/N2 – Ecological Support Services | Notice | Closed | 28/09/20 | Not Disclosed | 16/09/20 |
Project Progress Photography - Framework | Notice | Awarded | 21/09/20 | F: GBP 100k to 150k | 11/09/20 |
HS2 - WP056E3.1 - Victoria Road Crossover Box Piling Package | Notice | Closed | 16/09/20 | J: GBP 1m to 2.5m | 10/09/20 |
BBV HS2 MWCC North - Trench Shoring & Excavation System | Notice | Awarded | 17/09/20 | Not Disclosed | 10/09/20 |
BBV HS2 - Purchase of Photogrammetry Viewing Tool ver 2 | Notice | Closed | 18/09/20 | P: GBP 30m - 40m | 09/09/20 |
BBV HS2 - Purchase of Photogrammetry Viewing Tool | Notice | Withdrawn | 14/09/20 | P: GBP 30m - 40m | 09/09/20 |
HS2 N1/N2 – Temporary Fencing for Carol Green Underbridge | Notice | Awarded | 17/09/20 | Not Disclosed | 08/09/20 |
HS2 C1 - Excavation (Dwall Shafts) | Notice | Awarded | 14/09/20 | Not Disclosed | 08/09/20 |
HS2 C1 - Dewatering | Notice | Awarded | 14/09/20 | Not Disclosed | 07/09/20 |
HS2 C1 - Ventilation Cassette Tilting Device | Notice | Cancelled | 08/09/20 | Not Disclosed | 02/09/20 |
InSAR Satellite Monitoring | Notice | Awarded | 13/09/20 | Not Disclosed | 01/09/20 |
HS2 C1 - Cooling Plant | Notice | Awarded | 02/09/20 | Not Disclosed | 27/08/20 |
HS2 C1 - Bentonite Slurry Plant | Notice | Awarded | 01/09/20 | Not Disclosed | 25/08/20 |
BBV HS2 MWCC North - Supply of hydraulic fittings, hoses & general engineering consumables | Notice | Closed | 02/09/20 | E: GBP 50k to 100k | 24/08/20 |
BBV HS2 MWCC North - Portable toilets for TBM | Notice | Closed | 28/08/20 | Not Disclosed | 24/08/20 |
HS2 C1 - Cleaning Services | Notice | Awarded | 27/08/20 | Not Disclosed | 24/08/20 |
Asbestos Watching Brief - Area West, Central and East SCS JV | Notice | Awarded | 28/08/20 | G: GBP 150k to 250k | 20/08/20 |
BBV HS2 MWCC North - Occupational Health Service | Notice | ITT Issued | 27/08/20 | Not Disclosed | 20/08/20 |
Personal Protective Equipment PPE - Stage 2 Rev 1 | Notice | Awarded | 25/08/20 | I: GBP 500k to 1m | 20/08/20 |
BBV HS2 MWCC North - Steel Reinforcement - Technical / Design Services | Notice | Awarded | 28/08/20 | I: GBP 500k to 1m | 20/08/20 |
BBV HS2 MWCC - Surfacing Packages | Notice | Awarded | 28/08/20 | T: GBP 100m - 250m | 14/08/20 |
HS2 Main Works - WP232 - Ecology Surveys | Notice | Awarded | 24/08/20 | Not Disclosed | 14/08/20 |
Innovation & Business Improvement Digital Platform | Notice | Cancelled | 14/08/20 | Not Disclosed | 06/08/20 |
CFA Piling to structures associated with the Colne Valley Viaduct Access Routes | Notice | Awarded | 12/08/20 | Not Disclosed | 03/08/20 |
BBV HS2 MWCC North - Calibration of Laboratory Test Equipment | Notice | Closed | 07/08/20 | Not Disclosed | 03/08/20 |
HS2 Main Works S1 & S2 - Structural Steel Fabricator - Tower crane foundation structures | Notice | ITT Issued | 12/08/20 | Not Disclosed | 03/08/20 |
BBV HS2 MWCC North - Onboard Induction , Testing and Training (REF HTCR1001/SN) | Notice | Awarded | 07/08/20 | Not Disclosed | 31/07/20 |
Personal Protective Equipment PPE - Stage 2 | Notice | Cancelled | 18/08/20 | I: GBP 500k to 1m | 30/07/20 |
BBV HS2 MWCC North - Photography & Videography | Notice | Awarded | 05/08/20 | Not Disclosed | 30/07/20 |
BBV HS2 MWCC - Purchase of Earthworks Plant | Notice | Withdrawn | 30/07/20 | P: GBP 30m - 40m | 29/07/20 |
BBV HS2 MWCC North - Provision of Welding and Fabrication Services | Notice | Closed | 05/08/20 | Not Disclosed | 29/07/20 |
BBV HS2 MWCC North - Temporary Traffic Light Installation (REF HTST1020/SN) | Notice | Closed | 07/08/20 | Not Disclosed | 29/07/20 |
BBV HS2 MWCC Phase 1 North - TBM Cranage and Transport Services | Notice | Closed | 05/08/20 | J: GBP 1m to 2.5m | 29/07/20 |
BBV HS2 MWCC North - Tunnel Boring Machine (TBM) Pipework & Ancillaries | Notice | Awarded | 04/08/20 | J: GBP 1m to 2.5m | 29/07/20 |
BBV HS2 MWCC North - Mechanical Workshop | Notice | Closed | 04/08/20 | E: GBP 50k to 100k | 29/07/20 |
BBV HS2 MWCC North - M6/M42 Surfacing, VRS and Streetlighting Works | Notice | Awarded | 05/08/20 | Not Disclosed | 28/07/20 |
Traffic Management Services - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 14/08/20 | H: GBP 250k to 500k | 24/07/20 |
BBV HS2 MWCC - Purchase of Earthworks Plant | Notice | Withdrawn | 07/08/20 | P: GBP 30m - 40m | 24/07/20 |
HS2 Main Works - WP075 - Steelwork - Bridge Beams (Hampstead Road Bridge) | Notice | Closed | 06/08/20 | Not Disclosed | 23/07/20 |
Non-Plant Driver Training | Notice | Cancelled | 06/08/20 | Not Disclosed | 23/07/20 |
BBV HS2 MWCC North - Tunnel Grout - Constituent Materials | Notice | Closed | 30/07/20 | M: GBP 5m - 10m | 23/07/20 |
BBV HS2 MWCC North - Tunnel Grout | Notice | Awarded | 30/07/20 | M: GBP 5m - 10m | 23/07/20 |
Provision to supply / hire of Mobile Elevating Work Platforms | Notice | Cancelled | 31/07/20 | Not Disclosed | 17/07/20 |
HS2 C1 - Wooden Stacking/Storing Wedges | Notice | Awarded | 24/07/20 | Not Disclosed | 17/07/20 |
Small Plant and Tools Hire - Framework | Notice | Awarded | 27/07/20 | K: GBP 2.5m to 5m | 16/07/20 |
HS2 N1/N2 – Noise Insulation | Notice | Closed | 30/07/20 | J: GBP 1m to 2.5m | 16/07/20 |
Operational Support Mechanical Handling Equipment | Notice | Awarded | 22/07/20 | K: GBP 2.5m to 5m | 15/07/20 |
BBV HS2 MWCC North - Street Lighting Survey | Notice | Closed | 22/07/20 | Not Disclosed | 15/07/20 |
BBV HS2 MWCC North - Topographical Surveys | Notice | Closed | 22/07/20 | Not Disclosed | 15/07/20 |
Setting Out - Stage 2 | Notice | Awarded | 28/07/20 | I: GBP 500k to 1m | 15/07/20 |
BBV HS2 Field Management Systems | Notice | Awarded | 27/07/20 | Not Disclosed | 14/07/20 |
HS2 Main Works - WP231 - Provision of InSAR Services | Notice | Awarded | 21/07/20 | Not Disclosed | 14/07/20 |
HS2 MWC North - Civils Labour | Notice | ITT Issued | 22/07/20 | Not Disclosed | 13/07/20 |
HS2 C1 - Site Service Vehicles | Notice | Cancelled | 15/07/20 | Not Disclosed | 13/07/20 |
HS2 C1 - TBM Workshop Tools and Equipment | Notice | Awarded | 15/07/20 | Not Disclosed | 13/07/20 |
BBV HS2 MWCC North - MODIFICATION OF STREET LIGHTING & VEHICLE RESTRAINT BARRIER | Notice | Closed | 17/07/20 | E: GBP 50k to 100k | 13/07/20 |
HS2 C1 - South Portal Scaffolding and Platforming | Notice | Closed | 17/07/20 | Not Disclosed | 13/07/20 |
BBV HS2 MWCC Phase 1 North - Stage 2 CCTV sewer survey | Notice | Awarded | 17/07/20 | Not Disclosed | 10/07/20 |
HS2 C1 - TBM Emergency Generators | Notice | Awarded | 16/07/20 | Not Disclosed | 10/07/20 |
BBV HS2 MWCC Phase 1 North - Stage 2 Ground Penetrating Radar | Notice | Awarded | 15/07/20 | K: GBP 2.5m to 5m | 09/07/20 |
HS2 Main Works S1 & S2, WP025.3 Willesden Euroterminal Temporary Pedestrian Footbridge | Notice | Awarded | 17/07/20 | F: GBP 100k to 150k | 09/07/20 |
BBV HS2 MWCC North - Invasive species | Notice | Closed | 13/07/20 | J: GBP 1m to 2.5m | 08/07/20 |
BBV HS2 Information Technology - Stakeholder Management Tool | Notice | Closed | 21/07/20 | Not Disclosed | 07/07/20 |
HS2 C1 - Chemical Products Supply | Notice | Awarded | 10/07/20 | Not Disclosed | 06/07/20 |
HS2 C1 - Slurry Treatment Plant Assembly / Installation | Notice | Awarded | 09/07/20 | Not Disclosed | 02/07/20 |
HS2 C1 - Tunnel Boring Machine (TBM) Contract Lifting Services | Notice | Awarded | 09/07/20 | Not Disclosed | 02/07/20 |
HS2 N1/N2 – Noise Insulation | Notice | Closed | 15/07/20 | Not Disclosed | 30/06/20 |
Rail Replacement Bridges (WP15)- Network Rail - Old Oak Common (S4) Station - HS2 copy | Notice | Awarded | 23/07/20 | N: GBP 10m - 20m | 29/06/20 |
BBV HS2 MWCC North - Sulphuric Acid & Ferric Chloride Tanks | Notice | Closed | 10/07/20 | F: GBP 100k to 150k | 29/06/20 |
BBV HS2 MWCC North - Fuel Bowsor & Distribution | Notice | Awarded | 03/07/20 | Not Disclosed | 25/06/20 |
BBV HS2 MWCC North - Plant Gas Oil / Road Vehicle Diesel & Lubricants | Notice | Closed | 03/07/20 | Not Disclosed | 25/06/20 |
HS2 C1 - Viaduct Overhead/Gantry Cranes | Notice | Awarded | 01/07/20 | Not Disclosed | 25/06/20 |
HS2 C1 - Viaduct Storage Yard Gantry Crane | Notice | Awarded | 01/07/20 | Not Disclosed | 25/06/20 |
EKFB Bridge Bearings | Notice | Awarded | 03/07/20 | Not Disclosed | 22/06/20 |
BBV HS2 MWCC North - PROVISION OF RADIATION PROTECTION ADVISOR | Notice | Closed | 30/06/20 | D: GBP 25k to 50k | 22/06/20 |
BBV HS2 MWCC North - DISMANTLE AND REMOVAL OF LIGHTING MAST | Notice | Awarded | 30/06/20 | A: Up to GBP 5k | 22/06/20 |
BBV HS2 C-AIMS (A variant of Asset Data Management System -AIMS) | Notice | Closed | 03/07/20 | Not Disclosed | 19/06/20 |
Digitalisation of Health, Safety, Wellbeing, Quality, Assurance and Environment for Stage 2 System Solution | Notice | Awarded | 24/06/20 | Not Disclosed | 18/06/20 |
HS2 Main Works - WP148 - Noise Barriers | Notice | Cancelled | 26/06/20 | Not Disclosed | 18/06/20 |
FM Services | Notice | Awarded | 26/06/20 | Not Disclosed | 18/06/20 |
HS2 C1 - Cofferdam Construction in association with the Colne Valley Viaduct construction activities | Notice | Awarded | 24/06/20 | Not Disclosed | 18/06/20 |
Supply & Service Support for Lifting Equipment | Notice | Cancelled | 26/06/20 | Not Disclosed | 17/06/20 |
HS2 - WP102 Manufacture and Supply of Precast Concrete Tunnel Linings for HS2 Lots S1 (Euston Tunnels) and S2 (Northolt Tunnels). | Notice | Closed | 30/06/20 | T: GBP 100m - 250m | 17/06/20 |
HS2 C1 - Colne Valley Viaduct Haul Road Construction | Notice | Awarded | 24/06/20 | Not Disclosed | 17/06/20 |
Supply & Delivery of Quicklime | Notice | Awarded | 22/06/20 | N: GBP 10m - 20m | 16/06/20 |
BBV HS2 Information Technology - GIS System | Notice | Awarded | 21/06/20 | Not Disclosed | 15/06/20 |
HS2 C1 - Formwork, Reinforcement and Concreting activities in association with the Colne Valley Viaduct - Various works packages | Notice | Awarded | 19/06/20 | Not Disclosed | 12/06/20 |
Welding of Major TBM Components | Notice | Awarded | 19/06/20 | Not Disclosed | 12/06/20 |
HS2 Main Works - WP109.1 - Overground Conveyor Systems | Notice | Awarded | 17/06/20 | Not Disclosed | 10/06/20 |
EKFB JV White Collar Recruitment PSL (Perm and Freelance) | Notice | Awarded | 10/06/20 | Not Disclosed | 05/06/20 |
Old Oak Common Lowering - (WP36) - Old Oak Common (S4) Station - HS2 | Notice | Cancelled | 07/08/20 | K: GBP 2.5m to 5m | 04/06/20 |
Utility Diversion Civils and Contestable Works - (WP35.3) - Old Oak Common (S4) Station - HS2 | Notice | Cancelled | 31/07/20 | M: GBP 5m - 10m | 04/06/20 |
Utility Protection Slab - UtPS - (WP35.2) - Old Oak Common (S4) Station - HS2 | Notice | Cancelled | 07/08/20 | J: GBP 1m to 2.5m | 04/06/20 |
DESIGN AND SUPPLY OF FORMWORK & FALSEWORK EQUIPMENT AND MATERIALS | Notice | Closed | 10/06/20 | Not Disclosed | 04/06/20 |
BBV HS2 MWCC North - Facilities Management | Notice | Closed | 15/06/20 | Not Disclosed | 03/06/20 |
Relocation of SSEN Substation Contestable and Civils Works (WP4.2) - Old Oak Common (S4) Station - HS2 | Notice | Cancelled | 25/06/20 | E: GBP 50k to 100k | 03/06/20 |
Old Oak Common Lane widening Works (WP34.1) - Old Oak Common (S4) Station - HS2 | Notice | Cancelled | 25/06/20 | J: GBP 1m to 2.5m | 03/06/20 |
Old Oak Common Lane Retaining Walls (WP34.2) - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 25/06/20 | M: GBP 5m - 10m | 03/06/20 |
HS2 Main Works - WP227.1 Network Rail Mitigation Works - Structural Strengthening Works | Notice | Awarded | 10/06/20 | Not Disclosed | 01/06/20 |
HS2 Main Works - WP227 Network Rail Mitigation Works - Hydraulic Jacking Frames | Notice | Awarded | 10/06/20 | Not Disclosed | 01/06/20 |
Construction of Calvert South Overbridges, Underbridges & Culverts | Notice | Cancelled | 19/06/20 | N: GBP 10m - 20m | 29/05/20 |
BKJV Signs | Notice | Awarded | 19/06/20 | Not Disclosed | 28/05/20 |
HS2 Main Works S1 & S2 - WP064 - Rebar (CUT & BENT ONLY) | Notice | Awarded | 03/06/20 | Not Disclosed | 22/05/20 |
On-Site Catering Services - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 27/07/20 | M: GBP 5m - 10m | 22/05/20 |
On-Site Catering Services - Old Oak Common (S4) Station - HS2 | Notice | Withdrawn | 27/07/20 | M: GBP 5m - 10m | 22/05/20 |
HS2 C1 - Steel Structure Manufacturing | Notice | Closed | 28/05/20 | Not Disclosed | 21/05/20 |
Site Accommodation Cleaning Services - Old Oak Common (S4) Station - HS2 | Notice | Cancelled | 27/07/20 | M: GBP 5m - 10m | 21/05/20 |
Facilities Management - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 27/07/20 | M: GBP 5m - 10m | 21/05/20 |
EKFB I&M Data visualisation platform | Notice | Awarded | 29/05/20 | Not Disclosed | 20/05/20 |
EKFB I&M Data visualisation platform | Notice | Withdrawn | 29/05/20 | Not Disclosed | 20/05/20 |
EKFB JV Instrumentation and Monitoring Green Tunnels | Notice | Closed | 29/05/20 | Not Disclosed | 20/05/20 |
BBV HS2 MWCC North - TBM (Tunnel Boring Machine) Consumables | Notice | ITT Issued | 28/05/20 | H: GBP 250k to 500k | 20/05/20 |
BBV HS2 MWCC North - Coagulant for STP (Slurry Treatment Plant) Filter Presses | Notice | Closed | 28/05/20 | H: GBP 250k to 500k | 20/05/20 |
BBV HS2 MWCC North - Ferric Chloride For STP (Slurry Treatment Plant) Filter Presses | Notice | Closed | 28/05/20 | G: GBP 150k to 250k | 20/05/20 |
BBV HS2 MWCC North - Sulfuric Acid for STP (Slurry Treatment Plant) | Notice | Closed | 28/05/20 | H: GBP 250k to 500k | 20/05/20 |
BBV HS2 MWCC North - Bentonite for STP (Slurry Treatment Plant) | Notice | Closed | 28/05/20 | M: GBP 5m - 10m | 20/05/20 |
BBV HS2 MWCC North - Laboratories & Equipment | Notice | Awarded | 26/05/20 | Not Disclosed | 19/05/20 |
HS2 C1 - Chesham Road Caisson Shaft | Notice | Awarded | 26/05/20 | Not Disclosed | 19/05/20 |
BBV HS2 MWCC North - Temporary Bridges | Notice | Awarded | 28/05/20 | M: GBP 5m - 10m | 19/05/20 |
Long range wireless infrastructure | Notice | Awarded | 22/05/20 | Not Disclosed | 15/05/20 |
HS2 C1 - Builders Merchant Supplies | Notice | Awarded | 20/05/20 | Not Disclosed | 13/05/20 |
EKFB Mobile Communications | Notice | Awarded | 22/05/20 | Not Disclosed | 13/05/20 |
HS2 Main Works S1 & S2 - WP022 - Tower Cranes | Notice | Awarded | 22/05/20 | Not Disclosed | 12/05/20 |
Tower Cranes - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 19/06/20 | N: GBP 10m - 20m | 07/05/20 |
EKFB Surface and Ground water monitoring (Wendover) | Notice | Awarded | 06/06/20 | Not Disclosed | 06/05/20 |
EKFB Joint Venture - Micro Tunnelling and associated works | Notice | Awarded | 11/05/20 | M: GBP 5m - 10m | 05/05/20 |
Demolition of the Heathrow Express (HEX) Depot (WP3.2) - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 31/05/20 | K: GBP 2.5m to 5m | 04/05/20 |
Demolition of the Heathrow Express (HEX) Depot (WP3.2) - Old Oak Common (S4) Station - HS2 | Notice | Withdrawn | 31/05/20 | K: GBP 2.5m to 5m | 04/05/20 |
HS2 EKFB Waste Management Broker | Notice | Awarded | 12/05/20 | Not Disclosed | 28/04/20 |
Operational Support Control Room design, build & through-life support | Notice | Cancelled | 12/05/20 | H: GBP 250k to 500k | 28/04/20 |
HS2 Main Works S1 & S2 - WP225 Temporary Asphalting (including white lining) | Notice | Awarded | 04/05/20 | Not Disclosed | 27/04/20 |
Breakdown Recovery Stage 2 | Notice | Cancelled | 01/05/20 | H: GBP 250k to 500k | 24/04/20 |
FM PPM to Executive offices and modular buildings | Notice | Awarded | 01/05/20 | Not Disclosed | 24/04/20 |
Office Cleaning - Milton Keynes, Bicester and Brackley | Notice | Awarded | 01/05/20 | E: GBP 50k to 100k | 24/04/20 |
HS2 C1 - Dews Lane / Affinity Water Roads and Access Works | Notice | Awarded | 01/05/20 | Not Disclosed | 23/04/20 |
BBV HS2 MWCC North - Seal Can and Thrust Frame Fabrication | Notice | Closed | 28/04/20 | H: GBP 250k to 500k | 21/04/20 |
HS2 C1 - Precast Concrete Tunnel Segment Chemical and Repair Products | Notice | Cancelled | 24/04/20 | Not Disclosed | 17/04/20 |
BBV HS2 MWCC North - Site Compound Electrical Installations | Notice | Awarded | 27/04/20 | Not Disclosed | 17/04/20 |
HS2 C1 - Supply of Steel Reinforcement | Notice | Awarded | 23/04/20 | Not Disclosed | 17/04/20 |
Construction of the Station Box - FRC & Excavation Works - Old Oak Common (S4) Station - HS2 - Re-Open | Notice | Awarded | 08/05/20 | T: GBP 100m - 250m | 16/04/20 |
HS2 Main Works S1 & S2 - WP221 - Category 3 Design Check for Detailed Design | Notice | Cancelled | 22/04/20 | Not Disclosed | 15/04/20 |
HS2 C1 - Hazardous Material Storage Compounds | Notice | Awarded | 17/04/20 | Not Disclosed | 10/04/20 |
BBV HS2 MWCC North - PRECAST CONCRETE SERVICE TROUGHS | Notice | Closed | 19/04/20 | G: GBP 150k to 250k | 10/04/20 |
HS2 Main Works S1 & S2 - WP062 - Formwork Reinforcement Concrete (FRC) | Notice | ITT Issued | 21/04/20 | Q: GBP 40m - 50m | 10/04/20 |
HS2 - WP056H1 - Shaft Grouting Arrays Package | Notice | Awarded | 20/04/20 | N: GBP 10m - 20m | 09/04/20 |
Excavated Material Conveyor - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 24/04/20 | M: GBP 5m - 10m | 09/04/20 |
Critical Event Management Software | Notice | Cancelled | 24/04/20 | H: GBP 250k to 500k | 07/04/20 |
BBV HS2 MWCC North - PROVISION OF SPECIALIST TUNNELING LABOUR | Notice | Closed | 17/04/20 | J: GBP 1m to 2.5m | 06/04/20 |
BBV HS2 MWCC North - TUNNEL COMMUNICATION SYSTEMS | Notice | Closed | 10/04/20 | I: GBP 500k to 1m | 05/04/20 |
BBV HS2 MWCC North - TUNNEL VENTILATION SYSTEM | Notice | Closed | 10/04/20 | I: GBP 500k to 1m | 05/04/20 |
BBV HS2 MWCC North - BELT CONVEYORS | Notice | Closed | 10/04/20 | I: GBP 500k to 1m | 05/04/20 |
BBV HS2 MWCC North - TUNNEL SERVICES BRACKETS AND WALKWAY | Notice | Closed | 10/04/20 | I: GBP 500k to 1m | 05/04/20 |
BBV HS2 MWCC North - Water Monitoring | Notice | Awarded | 17/04/20 | K: GBP 2.5m to 5m | 03/04/20 |
HS2 Euston Station - Landscaping Trees removal | Notice | Closed | 16/04/20 | H: GBP 250k to 500k | 02/04/20 |
HS2 Euston Station - Heritage removal | Notice | Closed | 16/04/20 | E: GBP 50k to 100k | 02/04/20 |
HS2 C1 - Fuel | Notice | ITT Issued | 06/04/20 | Not Disclosed | 01/04/20 |
HS2 Main Works S1 & S2 - WP103 - Shaft Segments | Notice | Closed | 06/04/20 | Not Disclosed | 01/04/20 |
HS2 C1 - Stationery and Office Supplies | Notice | Closed | 02/04/20 | Not Disclosed | 27/03/20 |
BBV HS2 MWCC North - Grout Plant | Notice | Awarded | 03/04/20 | J: GBP 1m to 2.5m | 27/03/20 |
BBV HS2 MWCC North - Supply, Install & Maintenance of Upto 2 No Segment Grabs for Gantry Cranes | Notice | Awarded | 08/04/20 | D: GBP 25k to 50k | 27/03/20 |
BBV HS2 MWCC North - Compressed Air Plant | Notice | Awarded | 03/04/20 | I: GBP 500k to 1m | 27/03/20 |
BBV HS2 MWCC North - Water Cooling System | Notice | ITT Issued | 03/04/20 | H: GBP 250k to 500k | 27/03/20 |
HS2 C1 - Supply of Laundry Services for Personal Protective Equipment (PPE) | Notice | Awarded | 02/04/20 | Not Disclosed | 27/03/20 |
Road Cleaning Services | Notice | Awarded | 03/04/20 | K: GBP 2.5m to 5m | 26/03/20 |
Covered Storage | Notice | Awarded | 03/04/20 | J: GBP 1m to 2.5m | 26/03/20 |
Container / Containerised Storage Solution | Notice | Awarded | 03/04/20 | J: GBP 1m to 2.5m | 26/03/20 |
HS2 Main Works S1 & S2 - WP108 - MSVs | Notice | Awarded | 30/03/20 | Not Disclosed | 26/03/20 |
Welfare Cabins | Notice | Awarded | 03/04/20 | J: GBP 1m to 2.5m | 26/03/20 |
HS2 C1 - Invert Slab Concrete Bridge | Notice | Awarded | 31/03/20 | Not Disclosed | 25/03/20 |
HS2 Euston Station - Environmental Monitoring Provider & Noise and Vibration Consultant | Notice | Awarded | 27/03/20 | Not Disclosed | 23/03/20 |
HS2 Euston Station - Environmental Monitoring Provider & Air Quality Consultant | Notice | Closed | 27/03/20 | Not Disclosed | 23/03/20 |
Curzon Street Station (HS2) advanced works | Notice | Closed | 25/03/20 | I: GBP 500k to 1m | 17/03/20 |
HS2 Main Works S1 & S2 - WP023 - Gantry Cranes | Notice | Awarded | 23/03/20 | Not Disclosed | 17/03/20 |
BBV HS2 MWCC North - Long Itchington Wood (LIW) /Green (LIG) Reinforced Contrete Works | Notice | Closed | 30/03/20 | Not Disclosed | 13/03/20 |
HS2 C1 - Shaft Compounds Construction, Earthworks and Civil Engineering Activities | Notice | Awarded | 17/03/20 | Not Disclosed | 11/03/20 |
BBV HS2 MWCC North - Marston box - Tower Crane Foundations | Notice | Awarded | 20/03/20 | I: GBP 500k to 1m | 10/03/20 |
BBV HS2 MWCC North - Marston Box Reinforced Concrete Raft Slab | Notice | ITT Issued | 24/03/20 | Not Disclosed | 10/03/20 |
BBV HS2 MWCC North - Marston Box - Supply, Install, maintain, drive and remove 2no. Tower Cranes | Notice | Awarded | 24/03/20 | I: GBP 500k to 1m | 10/03/20 |
Supply & delivery of steel reinforcing bar | Notice | Awarded | 22/03/20 | Not Disclosed | 06/03/20 |
BBV HS2 MWCC North - Enabling Works at Marston Box | Notice | Awarded | 20/03/20 | K: GBP 2.5m to 5m | 05/03/20 |
HS2 Euston Station - Cost Consultant | Notice | Closed | 11/03/20 | H: GBP 250k to 500k | 03/03/20 |
HS2 Main Works S1 & S2 - WP026 - Utility Mitigations - Flame Ionisation Monitoring (FIM Monitoring) | Notice | Cancelled | 13/03/20 | K: GBP 2.5m to 5m | 28/02/20 |
HS2 Main Works S1 & S2 - WP026 - Utility Design and Build - Encapsulation of Gas Main Joints | Notice | Cancelled | 13/03/20 | M: GBP 5m - 10m | 28/02/20 |
Project Progress Photography / Video - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 06/03/20 | Not Disclosed | 25/02/20 |
HS2 Main Works S1 & S2 - WP203 - Temporary Works design services | Notice | Cancelled | 26/02/20 | Not Disclosed | 21/02/20 |
Supply & Hire of Generators | Notice | Awarded | 06/03/20 | Not Disclosed | 21/02/20 |
HS2 Euston Station - Site & Materials Testing Services | Notice | Closed | 27/02/20 | D: GBP 25k to 50k | 21/02/20 |
Traffic Control System - Creighton Road Corridor | Notice | Awarded | 05/03/20 | F: GBP 100k to 150k | 20/02/20 |
HS2 Main Works S1 & S2 - WP063 Sprayed Concrete | Notice | Closed | 24/02/20 | Not Disclosed | 17/02/20 |
HS2 Main Works S1 & S2 - WP013 Unexploded Ordnance (UXO) | Notice | Awarded | 24/02/20 | Not Disclosed | 17/02/20 |
Permanent Recruitment- White collar | Notice | Awarded | 28/02/20 | Not Disclosed | 17/02/20 |
HS2 C1 - Temporary Site Buildings - Mechanical & Electrical Installations | Notice | Closed | 21/02/20 | Not Disclosed | 14/02/20 |
Site Infrastructure - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 26/02/20 | M: GBP 5m - 10m | 13/02/20 |
Secondary Glazing Services - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 24/02/20 | H: GBP 250k to 500k | 13/02/20 |
Supply of Fuel, Installation of Bulk Storage Tanks & Dispensing Racks & the Distribution of Fuel to Worksite | Notice | Awarded | 27/02/20 | S: GBP 70m - 100m | 13/02/20 |
EK Surfacing for West Street compound | Notice | Withdrawn | 28/02/20 | F: GBP 100k to 150k | 13/02/20 |
HS2 Main Works S1 & S2 - WP026 - Utility Design and Build - Pipe Lining | Notice | Awarded | 28/02/20 | N: GBP 10m - 20m | 13/02/20 |
BBV HS2 MWCC North - Construction of Tunnel Cross Passages | Notice | Closed | 19/02/20 | N: GBP 10m - 20m | 06/02/20 |
BBV HS2 MWCC North - Tunnel Boring Machine Transportation | Notice | Closed | 19/02/20 | K: GBP 2.5m to 5m | 06/02/20 |
Civil Engineering Groundworks - Drainage Installation for Trackway, Highways, Structures & Site Wide Areas | Notice | Cancelled | 18/02/20 | Not Disclosed | 05/02/20 |
HS2 Main Works S1 & S2 - WP014 - Occupational Health Services | Notice | Awarded | 14/02/20 | Not Disclosed | 04/02/20 |
Design of the removal of Invasive Non-native Species (plants) - this opportunity supersedes opportunity ref 12934-Design JK eradication | Notice | Closed | 10/02/20 | H: GBP 250k to 500k | 04/02/20 |
Security, Access Road, External Traffic Management & Internal Logistics - Old Oak Common (S4) Station - HS2 | Notice | Cancelled | 14/02/20 | M: GBP 5m - 10m | 31/01/20 |
HS2 C1 - Supply of Flocculant, Coagulant and Sulfuric Acid | Notice | Awarded | 07/02/20 | Not Disclosed | 31/01/20 |
Waste Management Services - Old Oak Common (S4) Station - HS2 | Notice | Cancelled | 17/02/20 | I: GBP 500k to 1m | 31/01/20 |
Site Accommodation Services - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 17/02/20 | I: GBP 500k to 1m | 31/01/20 |
Utility Survey - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 17/02/20 | H: GBP 250k to 500k | 31/01/20 |
Facilities Management and Office Accommodation Cleaning Services - Old Oak Common (S4) Station - HS2 | Notice | Cancelled | 17/02/20 | M: GBP 5m - 10m | 31/01/20 |
Occupation Health Services - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 17/02/20 | K: GBP 2.5m to 5m | 30/01/20 |
Ground Reduction / Excavation - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 14/02/20 | K: GBP 2.5m to 5m | 30/01/20 |
BBV HS2 MWCC North - Survey and Measurement Equipment and Service - Hire/Purchase | Notice | Closed | 07/02/20 | Not Disclosed | 29/01/20 |
BBV HS2 MWCC North - Road Sweepers & Suction Excavators Hire | Notice | Closed | 04/02/20 | Not Disclosed | 29/01/20 |
BBV HS2 MWCC North - Environmental/Emergency Response | Notice | Closed | 07/02/20 | Not Disclosed | 28/01/20 |
BBV HS2 MWCC North - Environmental Response | Notice | Closed | 07/02/20 | Not Disclosed | 28/01/20 |
Concrete Batching Plant - Old Oak Common (S4) Station - HS2 - Re-Issue | Notice | Cancelled | 31/01/20 | Not Disclosed | 24/01/20 |
BBV HS2 MWCC North - Generators Hire /Buy | Notice | Closed | 10/02/20 | Not Disclosed | 24/01/20 |
Stamford Brook Sewer Diversion Works - Old Oak Common (S4) Station - HS2 Re-Issue | Notice | Cancelled | 07/02/20 | K: GBP 2.5m to 5m | 24/01/20 |
On Site Catering Services - Old Oak Common (S4) Station - HS2 Re-issue | Notice | Cancelled | 07/02/20 | Not Disclosed | 24/01/20 |
Dilapidation Surveys - Old Oak Common (S4) Station - HS2 Re-issue | Notice | Cancelled | 31/01/20 | Not Disclosed | 24/01/20 |
Topographical Survey Services - Old Oak Common (S4) Station - HS2 Re-Issue | Notice | Cancelled | 31/01/20 | Not Disclosed | 24/01/20 |
Ground Investigation Services - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 31/01/20 | Not Disclosed | 24/01/20 |
Ecology Services - Old Oak Common (S4) Station - HS2 Re-Issue | Notice | Cancelled | 31/01/20 | D: GBP 25k to 50k | 24/01/20 |
BBV HS2 MWCC North - Access Matting and Ground Protection Hire/Purchase | Notice | Closed | 05/02/20 | Not Disclosed | 24/01/20 |
Under Track Crossing of Utilities - Old Oak Common (S4) Station - HS2 Re-Issue | Notice | Cancelled | 07/02/20 | M: GBP 5m - 10m | 24/01/20 |
Instrumentation and Monitoring Services - Old Oak Common (S4) Station - HS2 - Re - Issue | Notice | Cancelled | 31/01/20 | K: GBP 2.5m to 5m | 24/01/20 |
BBV HS2 MWCC North - Tunnel Communication System | Notice | Closed | 07/02/20 | J: GBP 1m to 2.5m | 24/01/20 |
HS2 - WP056F - Euston PVE Ground Anchor Package | Notice | Awarded | 31/01/20 | H: GBP 250k to 500k | 23/01/20 |
Veteran Tree and Important Hedgerow Translocation | Notice | Awarded | 04/02/20 | K: GBP 2.5m to 5m | 22/01/20 |
HS2 Main Works S1 & S2 - WP061.1 - Aggregates | Notice | Awarded | 30/01/20 | Not Disclosed | 22/01/20 |
HS2 C1 - M.S Water Treatment Plant Erection, Installation and Commisioning | Notice | Awarded | 28/01/20 | Not Disclosed | 22/01/20 |
HS2 - WP056I - Embankment Improvement works to River Pinn and Gatemead Package | Notice | Closed | 24/01/20 | J: GBP 1m to 2.5m | 16/01/20 |
BBV HS2 MWCC North - Dewatering Contract | Notice | Awarded | 31/01/20 | M: GBP 5m - 10m | 15/01/20 |
Precast Concrete - Bridge Beams, Bridge Parapets, Bridge Pier Shells, Box Culverts | Notice | Awarded | 28/01/20 | Not Disclosed | 14/01/20 |
Supply & Hire of Non-Mechanical Plant, including Shoring Equipment, Trent Boxes, Road Plates etc | Notice | Awarded | 17/01/20 | Not Disclosed | 07/01/20 |
Retaining Wall Intrusive Surveys - Old Oak Common (S4) Station - HS2 | Notice | Cancelled | 06/01/20 | G: GBP 150k to 250k | 23/12/19 |
Asbestos Surveys - Old Oak Common (S4) Station - HS2 | Notice | Cancelled | 06/01/20 | G: GBP 150k to 250k | 23/12/19 |
BBV HS2 MWCC North - Demolition | Notice | Awarded | 24/01/20 | Not Disclosed | 23/12/19 |
UXO Surveys - Old Oak Common (S4) Station - HS2 | Notice | Cancelled | 06/01/20 | Not Disclosed | 20/12/19 |
On Site Catering Services - Old Oak Common (S4) Station - HS2 | Notice | Cancelled | 10/01/20 | Not Disclosed | 20/12/19 |
Logistics Management, Security & Facilities Management Services - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 10/01/20 | Not Disclosed | 20/12/19 |
Fusion JV / 27 / AWS Bernwood Bats Surveys and Mitigation | Notice | Closed | 10/01/20 | J: GBP 1m to 2.5m | 19/12/19 |
Stamford Brook Sewer Diversion Works - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 09/01/20 | K: GBP 2.5m to 5m | 18/12/19 |
Under Track Crossing of Utilities - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 09/01/20 | M: GBP 5m - 10m | 18/12/19 |
Dilapidation Surveys - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 06/01/20 | Not Disclosed | 17/12/19 |
Topographical Survey Services - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 06/01/20 | Not Disclosed | 17/12/19 |
Provision of lime stabilisation services | Notice | Cancelled | 06/01/20 | K: GBP 2.5m to 5m | 17/12/19 |
Ecology Services - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 10/01/20 | D: GBP 25k to 50k | 16/12/19 |
PAS128 Cat B Surveys (Calvert South) | Notice | Awarded | 10/01/20 | Not Disclosed | 16/12/19 |
HS2 Main Works S1 & S2 - WP004 - Site Vegetation and Tree Clearance | Notice | Awarded | 31/12/19 | G: GBP 150k to 250k | 16/12/19 |
Air Quality, Noise and Vibration Monitoring Services - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 20/12/19 | F: GBP 100k to 150k | 12/12/19 |
Concrete Batching Plant - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 13/01/20 | Not Disclosed | 12/12/19 |
WP056E1 - S2 Phase 1 Piling Package copy | Notice | Closed | 18/12/19 | M: GBP 5m - 10m | 12/12/19 |
BBV HS2 MWCC North - FORMWORK REINFORCEMENT CONCRETE (FRC) | Notice | Closed | 03/01/20 | Not Disclosed | 10/12/19 |
Instrumentation and Monitoring Services - Old Oak Common (S4) Station - HS2 | Notice | Awarded | 20/12/19 | K: GBP 2.5m to 5m | 06/12/19 |
Utilities Management Services - Old Oak Common (S4) Station - HS2 | Notice | Cancelled | 11/12/19 | H: GBP 250k to 500k | 06/12/19 |
WP056E1 - S2 Phase 1 Piling Package | Notice | Closed | 11/12/19 | M: GBP 5m - 10m | 02/12/19 |
HS2 Euston Station - Framework Agreements for Temporary Works Design | Notice | Closed | 06/12/19 | Not Disclosed | 29/11/19 |
AWE2a-2 Design Landscape Planting Sites | Notice | Closed | 03/12/19 | Not Disclosed | 27/11/19 |
Structural bridge surveys | Notice | Awarded | 29/11/19 | Not Disclosed | 20/11/19 |
HS2 Euston Station - Supply of Site Offices and Accommodation (Modular Building) | Notice | Awarded | 06/12/19 | Not Disclosed | 20/11/19 |
BBV HS2 MWCC North - Fire Testing Of Precast Tunnel Segments | Notice | Closed | 22/11/19 | E: GBP 50k to 100k | 20/11/19 |
Temporary Bridges | Notice | Awarded | 26/11/19 | K: GBP 2.5m to 5m | 14/11/19 |
HS2 Old Oak Common Station - Box Piling and Diaphragm Wall | Notice | Awarded | 21/11/19 | S: GBP 70m - 100m | 14/11/19 |
Old Oak Common Station - Box Station Piling & Diaphragm Wall | Notice | Withdrawn | 21/11/19 | S: GBP 70m - 100m | 14/11/19 |
HS2 C1 - Fish / Aquatic Surveys and Ecology Works | Notice | Awarded | 20/11/19 | Not Disclosed | 14/11/19 |
HS2 C1 - Construction of Permanent Overbridge & Culvert | Notice | Awarded | 20/11/19 | J: GBP 1m to 2.5m | 14/11/19 |
HS2 C1 - Overnight Accommodation On Site | Notice | Awarded | 15/11/19 | Not Disclosed | 11/11/19 |
BBV HS2 MWCC North - Multi-Service Vehicles For Use In Tunnel Construction | Notice | Closed | 15/11/19 | Not Disclosed | 11/11/19 |
BBV HS2 MWCC North - Moulds For Use In The Manufacture Of Precast Concrete Tunnel Segments | Notice | Closed | 15/11/19 | Not Disclosed | 11/11/19 |
BBV HS2 MWCC North - Earthworks, Stabilisation and associated drainage works | Notice | Closed | 14/11/19 | M: GBP 5m - 10m | 07/11/19 |
HS2 C1 - 3D Animation modelling | Notice | Closed | 08/11/19 | Not Disclosed | 05/11/19 |
WP056d - West Ruislip Portal & Launch Chamber Piling | Notice | Withdrawn | 05/11/19 | M: GBP 5m - 10m | 30/10/19 |
HS2 Main Works S1 & S2 - WP220 - Utility Under Track Crossing (Pipe Jacking) | Notice | Cancelled | 15/11/19 | N: GBP 10m - 20m | 30/10/19 |
HS2 Main Works S1 & S2 - WP082 Mechanical Electrical & Public Health (MEPH) | Notice | Cancelled | 14/11/19 | T: GBP 100m - 250m | 30/10/19 |
Needle Sweeps, Graffiti Removal & Minor De-Veg. copy | Notice | Closed | 31/10/19 | E: GBP 50k to 100k | 29/10/19 |
Cranes (Calvert South) | Notice | Awarded | 08/11/19 | Not Disclosed | 28/10/19 |
Needle Sweeps, Graffiti Removal & Minor De-Veg. | Notice | Closed | 28/10/19 | E: GBP 50k to 100k | 25/10/19 |
Non-Core Earthworks Plant & Early Works Plant (Central Area) | Notice | Awarded | 08/11/19 | Not Disclosed | 25/10/19 |
HS2 C1- Supply of office AV equipment , printers, photocopiers and plotters | Notice | Closed | 25/10/19 | Not Disclosed | 18/10/19 |
Catering Support Services | Notice | Awarded | 25/10/19 | Not Disclosed | 18/10/19 |
BBV HS2 MWCC North - Integrated Logistics Management Solution | Notice | Closed | 25/10/19 | Not Disclosed | 14/10/19 |
Temporary Fencing and Gating | Notice | Awarded | 18/10/19 | N: GBP 10m - 20m | 10/10/19 |
Specialist Tier 2 Subcontractor - Earthing and Lightning Protection | Notice | Closed | 23/10/19 | K: GBP 2.5m to 5m | 10/10/19 |
HS2 C1 - Waste Management | Notice | Awarded | 16/10/19 | K: GBP 2.5m to 5m | 10/10/19 |
Specialist Tier 2 Subcontractor - Ground Source Heat Pumps | Notice | Awarded | 23/10/19 | M: GBP 5m - 10m | 10/10/19 |
Eiffage Kier PPE Supply, Maintenance and Washing | Notice | Awarded | 15/10/19 | K: GBP 2.5m to 5m | 08/10/19 |
Innovation Challenge - Sustainable Materials | Notice | Cancelled | 11/10/19 | Not Disclosed | 03/10/19 |
Vehicle Wash Stations | Notice | Awarded | 21/10/19 | Not Disclosed | 03/10/19 |
Weighbridges | Notice | Cancelled | 21/10/19 | Not Disclosed | 03/10/19 |
HS2 Main Works S1 & S2 - WP167 - Rail Terminal Operations | Notice | Awarded | 11/10/19 | N: GBP 10m - 20m | 03/10/19 |
HS2 C1 - Highways Maintenace and Traffic Management | Notice | Awarded | 02/10/19 | K: GBP 2.5m to 5m | 25/09/19 |
BBV HS2 MWCC North - Supply and install of Concrete Formwork. | Notice | Closed | 03/10/19 | Not Disclosed | 16/09/19 |
BBV HS2 MWCC North - Sale or Hire structural formwork. | Notice | Closed | 07/10/19 | Not Disclosed | 16/09/19 |
HS2 C1 - FF&E | Notice | Awarded | 23/09/19 | Not Disclosed | 16/09/19 |
BBV HS2 MWCC North - Supply and Install of Site Signage and Signage Solutions | Notice | Closed | 03/10/19 | Not Disclosed | 16/09/19 |
Materials Testing | Notice | Awarded | 27/09/19 | Not Disclosed | 11/09/19 |
HS2 Main Works S1 & S2 - WP174 - Pre-Construction Condition Surveys (Rail Assets - Network Rail) | Notice | Awarded | 25/09/19 | J: GBP 1m to 2.5m | 11/09/19 |
HS2 Main Works S1 & S2 - WP166 - Pre-Construction Condition Surveys (Buildings) | Notice | Awarded | 25/09/19 | J: GBP 1m to 2.5m | 11/09/19 |
Occupational Health Services | Notice | Awarded | 19/09/19 | Not Disclosed | 06/09/19 |
HS2 Main Works S1 & S2 - WP217 - Asbestos Removal | Notice | Awarded | 13/09/19 | Not Disclosed | 06/09/19 |
BBV HS2 MWCC North - Printing and Mail Fulfilment Services | Notice | Closed | 20/09/19 | Not Disclosed | 04/09/19 |
Site Access Road | Notice | Awarded | 16/09/19 | O: GBP 20m - 30m | 02/09/19 |
Site Access Road | Notice | Withdrawn | 16/09/19 | O: GBP 20m - 30m | 30/08/19 |
HS2 MWCC's Lots C23 - Temporary Works Designers | Notice | Awarded | 06/09/19 | M: GBP 5m - 10m | 30/08/19 |
HS2 Main Works S1 & S2 - WP158 - Rail Track Maintenance | Notice | Awarded | 12/09/19 | J: GBP 1m to 2.5m | 27/08/19 |
Specialist Subcontractor - Unexploded Bomb Probing | Notice | Closed | 08/09/19 | Not Disclosed | 27/08/19 |
Unexploded Ordnance Surveys | Notice | Awarded | 30/08/19 | I: GBP 500k to 1m | 23/08/19 |
Design & Build Of Reinforcement Fabrication Facility Building | Notice | Closed | 30/08/19 | K: GBP 2.5m to 5m | 22/08/19 |
HS2 EKJV Sections C2 C3 Noise, Vibration & Air Quality Equipment/ Consultancy | Notice | Awarded | 02/09/19 | J: GBP 1m to 2.5m | 22/08/19 |
HS2 EK Waste Management ITT | Notice | Awarded | 16/09/19 | J: GBP 1m to 2.5m | 21/08/19 |
HS2 Main Works S1 & S2 - WP036 - Earthworks | Notice | Closed | 21/08/19 | P: GBP 30m - 40m | 20/08/19 |
Traffic Safety and Control Officers (TSCOs) | Notice | Awarded | 30/08/19 | I: GBP 500k to 1m | 20/08/19 |
Temporary Traffic Management | Notice | Awarded | 30/08/19 | N: GBP 10m - 20m | 16/08/19 |
HS2 EKJV Sections C2 C3 Vegetation Clearance | Notice | Awarded | 02/09/19 | J: GBP 1m to 2.5m | 15/08/19 |
HS2 C1 - Thames Water Sewer Diversion Concrete Pipe | Notice | ITT Issued | 13/08/19 | I: GBP 500k to 1m | 07/08/19 |
Contestable Utility Diversions | Notice | Awarded | 23/08/19 | R: GBP 50m - 70m | 06/08/19 |
BBV HS2 MWCC North - Bulk & Mobile Fuel Tanks & Pumps | Notice | Closed | 15/08/19 | Not Disclosed | 06/08/19 |
Unexploded Ordnance Survey | Notice | Awarded | 09/08/19 | Not Disclosed | 06/08/19 |
EK and BBV HS2 MWCC - Purchase of Earthworks Plant | Notice | Awarded | 12/08/19 | Not Disclosed | 02/08/19 |
BBV HS2 MWCC North - STRUCTURAL JACKING | Notice | Closed | 08/08/19 | K: GBP 2.5m to 5m | 02/08/19 |
Provision of an Immersive Culture Change Training Experience | Notice | Awarded | 09/08/19 | K: GBP 2.5m to 5m | 02/08/19 |
Bus Services - Movement of Workforce | Notice | Awarded | 16/08/19 | Not Disclosed | 02/08/19 |
HS2 EWC Area South - WP003b Utilities Priority Design Consultancy | Notice | Awarded | 07/08/19 | J: GBP 1m to 2.5m | 02/08/19 |
Weighbridges | Notice | Cancelled | 16/08/19 | Not Disclosed | 02/08/19 |
Vehicle Wash Stations | Notice | Awarded | 16/08/19 | G: GBP 150k to 250k | 02/08/19 |
Catering Support Services | Notice | Awarded | 16/08/19 | Not Disclosed | 02/08/19 |
Specialist Tier 2 Subcontractor - Technical Support | Notice | Closed | 07/08/19 | Not Disclosed | 31/07/19 |
Opportunity Template - Template copy | Notice | Withdrawn | 06/08/19 | G: GBP 150k to 250k | 31/07/19 |
Fuel Storage Solutions | Notice | Awarded | 14/08/19 | H: GBP 250k to 500k | 31/07/19 |
Supply & Delivery of Quicklime & Hydrated Lime Acr... | Notice | Awarded | 05/08/19 | T: GBP 100m - 250m | 31/07/19 |
HS2 C1 - Tunnel Rolling Stock Gantry Crane | Notice | Awarded | 05/08/19 | Not Disclosed | 29/07/19 |
HS2 C1 - Temporary Water Storage Tanks | Notice | Closed | 05/08/19 | Not Disclosed | 29/07/19 |
Supply and delivery of Fuel across the HS2 programme wide | Notice | Closed | 06/08/19 | T: GBP 100m - 250m | 29/07/19 |
Fusion JV / 11814 / 00028: Demolition | Notice | Awarded | 05/08/19 | Not Disclosed | 26/07/19 |
HS2 C1 - Tunnel Grout Storage Equipment (Bicomponent Compound) | Notice | Closed | 30/07/19 | I: GBP 500k to 1m | 24/07/19 |
HS2 C1 - South Portal Construction Slab and associated concrete structures | Notice | Awarded | 30/07/19 | Not Disclosed | 24/07/19 |
HS2 Main Works S1 & S2 - WP005 - Temporary Site Services | Notice | Awarded | 05/08/19 | M: GBP 5m - 10m | 24/07/19 |
Temporary Accomodation - Cabins | Notice | Awarded | 26/07/19 | N: GBP 10m - 20m | 19/07/19 |
Temporary Accomodation - Cabins | Notice | Withdrawn | 26/07/19 | N: GBP 10m - 20m | 19/07/19 |
HS2 C1 - Inside Building Overhead Cranes and Monorail Hoists | Notice | Awarded | 29/07/19 | Not Disclosed | 18/07/19 |
Fuel | Notice | Closed | 29/07/19 | Q: GBP 40m - 50m | 18/07/19 |
BBV HS2 MWCC North - Noise & Vibration Section 61 | Notice | Closed | 31/07/19 | Not Disclosed | 17/07/19 |
BBV HS2 MWCC North - Steel Framed Pre Fabricated Temporary Portal & Container Buildings | Notice | Closed | 29/07/19 | Not Disclosed | 17/07/19 |
HS2 C1 - Vegetation clearance and tree felling services | Notice | Awarded | 23/07/19 | J: GBP 1m to 2.5m | 17/07/19 |
BBV HS2 MWCC North - STAGE 2 GROUND INVESTIGATION WORKS | Notice | Awarded | 19/07/19 | N: GBP 10m - 20m | 12/07/19 |
EK Route Wide Topographical Surveys- Aerial | Notice | Awarded | 15/07/19 | H: GBP 250k to 500k | 09/07/19 |
EK Route Wide Topographical Surveys- Ground Surveys | Notice | Awarded | 15/07/19 | H: GBP 250k to 500k | 09/07/19 |
Electric Charging Requirement | Notice | Cancelled | 19/07/19 | E: GBP 50k to 100k | 02/07/19 |
Eiffage Kier White Fleet Vehicles (Non Construction/non LGV) | Notice | Awarded | 31/07/19 | M: GBP 5m - 10m | 02/07/19 |
Eiffage Kier Security Gaurding | Notice | Awarded | 31/07/19 | M: GBP 5m - 10m | 02/07/19 |
HS2 C1 - Launching Seal | Notice | Awarded | 08/07/19 | Not Disclosed | 02/07/19 |
HS2 C1 - Steel Pipes Tunnel Services | Notice | Closed | 05/07/19 | Not Disclosed | 28/06/19 |
HS2 C1 - Noise Insulation | Notice | Closed | 28/06/19 | Not Disclosed | 24/06/19 |
Provision of Temporary Civil Engineering Labour | Notice | Awarded | 28/06/19 | T: GBP 100m - 250m | 18/06/19 |
HS2 C1 - Weld Test | Notice | Closed | 21/06/19 | Not Disclosed | 18/06/19 |
Storage Solutions Requirement | Notice | Awarded | 27/06/19 | I: GBP 500k to 1m | 17/06/19 |
Large Goods Vehicle Requirement | Notice | Awarded | 24/06/19 | M: GBP 5m - 10m | 17/06/19 |
Sheet piling | Notice | Closed | 21/06/19 | Not Disclosed | 12/06/19 |
Digital Signage Solution | Notice | Awarded | 30/06/19 | G: GBP 150k to 250k | 06/06/19 |
Watercourse Monitoring | Notice | Awarded | 06/06/19 | D: GBP 25k to 50k | 30/05/19 |
BBV HS2 MWCC North - Silos | Notice | Awarded | 12/06/19 | Not Disclosed | 30/05/19 |
BBV HS2 MWCC North - Occupational health service | Notice | Awarded | 13/06/19 | Not Disclosed | 30/05/19 |
Time lapse cameras | Notice | Awarded | 14/06/19 | G: GBP 150k to 250k | 30/05/19 |
Supply Of Cut & Bent / Fabricated Reinforcing Bar - HS2 Programme Wide | Notice | Closed | 03/06/19 | T: GBP 100m - 250m | 28/05/19 |
Supply Of Reinforcing Bar - HS2 Programme Wide | Notice | Closed | 03/06/19 | T: GBP 100m - 250m | 28/05/19 |
HS2 Main Works S1 & S2 - WP052 - Rail Terminal Construction | Notice | Awarded | 31/05/19 | M: GBP 5m - 10m | 20/05/19 |
HS2 C1 -Multi-Service Vehicles | Notice | Awarded | 24/05/19 | Not Disclosed | 15/05/19 |
HS2 C1 - Vehicle Weighbridge | Notice | Awarded | 17/05/19 | Not Disclosed | 14/05/19 |
SCS Supply Chain Exhibition Event - A Safer, Healt... | Notice | Cancelled | 13/05/19 | Not Disclosed | 10/05/19 |
SCS Supply Chain Exhibition Event - Technology for... | Notice | Cancelled | 13/05/19 | Not Disclosed | 10/05/19 |
BBV HS2 MWCC North - Instrumentation and Monitoring -Condition Surveys | Notice | Awarded | 14/05/19 | Not Disclosed | 07/05/19 |
BBV HS2 MWCC North - Instrumentation and Monitoring - Satellite Monitoring | Notice | Awarded | 14/05/19 | Not Disclosed | 07/05/19 |
BBV HS2 MWCC North - Instrumentation and Monitoring - Network Rail | Notice | Awarded | 14/05/19 | Not Disclosed | 07/05/19 |
BBV HS2 MWCC North - Design, Supply , Install and ... | Notice | Withdrawn | 17/05/19 | Not Disclosed | 07/05/19 |
SCS Supply Chain Exhibition Event – Engineering th... | Notice | Withdrawn | 10/05/19 | Not Disclosed | 03/05/19 |
BBV HS2 MWCC North - Design, Supply , Install and Maintain Large Capacity Overhead Cranes | Notice | Closed | 17/05/19 | Not Disclosed | 02/05/19 |
BBV HS2 MWCC North - Design, Supply, Install and Maintain large Goliath Type Gantry Cranes | Notice | Awarded | 17/05/19 | Not Disclosed | 02/05/19 |
BBV HS2 MWCC North - Noise vibration and dust monitoring | Notice | Closed | 15/05/19 | Not Disclosed | 01/05/19 |
BBV HS2 MWCC North - Plastic Drainage | Notice | Closed | 14/05/19 | Not Disclosed | 01/05/19 |
BBV HS2 MWCC North - Concrete Drainage | Notice | Closed | 14/05/19 | Not Disclosed | 01/05/19 |
BBV HS2 MWCC North - Drainage | Notice | Closed | 09/05/19 | Not Disclosed | 25/04/19 |
WP11b -New primary and secondary steelwork & cladding for an existing portal frame | Notice | Closed | 03/05/19 | H: GBP 250k to 500k | 24/04/19 |
Construction of Three Storey Car park | Notice | Closed | 03/05/19 | Not Disclosed | 24/04/19 |
C1 HS2 - Tunnel Segment Moulds, Carousels and Equipment | Notice | Awarded | 19/04/19 | Not Disclosed | 15/04/19 |
Civil Engineering Framework | Notice | Awarded | 26/04/19 | T: GBP 100m - 250m | 08/04/19 |
HS2 C1 - Wheel Wash Systems | Notice | Awarded | 12/04/19 | Not Disclosed | 08/04/19 |
HS2 C1 - Gaskets For Tunnel Segments | Notice | Awarded | 12/04/19 | K: GBP 2.5m to 5m | 05/04/19 |
HS2 C1 - Inserts For Tunnel Segments | Notice | Awarded | 12/04/19 | J: GBP 1m to 2.5m | 05/04/19 |
HS2 Main Works S1 & S2 - WP009.3 - Temporary Accom... | Notice | Closed | 03/04/19 | J: GBP 1m to 2.5m | 28/03/19 |
HS2 Main Works S1 & S2 - WP009.2 - Temporary Accom... | Notice | Closed | 04/04/19 | M: GBP 5m - 10m | 28/03/19 |
HS2 Main Works S1 & S2 - WP009.1 - Temporary Accom... | Notice | Awarded | 04/04/19 | M: GBP 5m - 10m | 28/03/19 |
HS2 C1 - Steel Pedestrian Bridges | Notice | Closed | 28/03/19 | Not Disclosed | 21/03/19 |
Detailed Design Site Investigation | Notice | Awarded | 29/03/19 | M: GBP 5m - 10m | 21/03/19 |
HS2 Main Works S1 & S2 - WP017 - Traffic Management | Notice | Awarded | 28/03/19 | O: GBP 20m - 30m | 20/03/19 |
HS2 Main Works S1 & S2 - WP032.2 - Air Quality (Dust & Emissions) Monitoring | Notice | Awarded | 22/03/19 | J: GBP 1m to 2.5m | 18/03/19 |
HS2 Main Works S1 & S2 - WP058 Sheet Piling | Notice | Awarded | 03/04/19 | M: GBP 5m - 10m | 18/03/19 |
HS2 Main Works S1 & S2, WP025.1 ACA - Bridges - Temporary | Notice | Awarded | 21/03/19 | J: GBP 1m to 2.5m | 14/03/19 |
BBV HS2 MWCC North - Contamination and Remediation | Notice | Closed | 22/03/19 | Not Disclosed | 11/03/19 |
HS2 C1 - Demolition Works | Notice | Awarded | 05/03/19 | Not Disclosed | 27/02/19 |
HS2 Main Works S1 & S2 - WP032.1 - Noise & Vibration Monitoring | Notice | Awarded | 06/03/19 | J: GBP 1m to 2.5m | 26/02/19 |
HS2 Main Works S1 & S2 - WP002.2 - Temporary Hoarding | Notice | Awarded | 28/02/19 | J: GBP 1m to 2.5m | 25/02/19 |
HS2 Main Works S1 & S2 - WP198.1_ACA - Compaction Testing | Notice | ITT Issued | 22/02/19 | M: GBP 5m - 10m | 17/02/19 |
HS2 Main Works S1 & S2, WP00190.1.b Survey - Design Assessment (Buildings) | Notice | Closed | 24/02/19 | I: GBP 500k to 1m | 17/02/19 |
Printing and Managed Print Services | Notice | Closed | 28/02/19 | Not Disclosed | 15/02/19 |
HS2 Main Works S1 & S2, WP179.2 - Utility CCTV S... | Notice | Awarded | 15/02/19 | G: GBP 150k to 250k | 11/02/19 |
HS2 Main Works S1 & S2, WP179.1 - Utility GPR & ... | Notice | Awarded | 15/02/19 | J: GBP 1m to 2.5m | 11/02/19 |
BBV HS2 MWCC North - Plant Hire of Crawler, Mobile and Vehicle Mounted Cranes | Notice | Closed | 20/02/19 | Not Disclosed | 08/02/19 |
BBV HS2 MWCC North - Vehicle Mounted Crawler or Mobile Cranes - New and Used | Notice | Closed | 20/02/19 | Not Disclosed | 08/02/19 |
BBV HS2 MWCC North - Vehicle Mounted Concrete Pumps - New and Nearly New Used | Notice | Closed | 19/02/19 | Not Disclosed | 07/02/19 |
BBV HS2 MWCC North - Vehicle Mounted Concrete Pumps Hire | Notice | Closed | 19/02/19 | Not Disclosed | 07/02/19 |
Precast Concrete Tunnel Segment Factory - Carousel Equipment & Moulds | Notice | Awarded | 01/02/19 | Not Disclosed | 25/01/19 |
Temporary Electrics and Power Distribution | Notice | Closed | 06/02/19 | Not Disclosed | 24/01/19 |
HS2 Main Works S1 & S2, WP0012-Site Security Services & Access Control | Notice | Awarded | 31/01/19 | M: GBP 5m - 10m | 24/01/19 |
HS2 Main Works S1 & S2, WP00190/ Condition, building (intrusive and non-intrusive) and dilapidation surveys | Notice | Closed | 13/02/19 | I: GBP 500k to 1m | 24/01/19 |
Instrumentation & Monitoring | Notice | Awarded | 31/01/19 | Not Disclosed | 17/01/19 |
Materials Testing Laboratory | Notice | Awarded | 22/01/19 | Not Disclosed | 15/01/19 |
Ecology Services | Notice | Closed | 25/01/19 | Not Disclosed | 15/01/19 |
Site Access Design Services | Notice | Awarded | 21/01/19 | Not Disclosed | 15/01/19 |
Structural Steel Framed shed/building/workshop(s) | Notice | Awarded | 18/01/19 | Not Disclosed | 08/01/19 |
Gantry Cranes for Precast Tunnel Segment Yard | Notice | Awarded | 18/12/18 | Not Disclosed | 11/12/18 |
HS2 C1 - Labour | Notice | Awarded | 14/12/18 | Not Disclosed | 07/12/18 |
HS2 C1 - Personal protective equipment (PPE) | Notice | Closed | 14/12/18 | Not Disclosed | 07/12/18 |
BBV HS2 MWCC North - Drilling , installation and management of groundwater wells | Notice | Awarded | 19/12/18 | I: GBP 500k to 1m | 05/12/18 |
BBV HS2 MWCC North - Earthworks Soil Stabilisation | Notice | Closed | 17/12/18 | O: GBP 20m - 30m | 05/12/18 |
Ground Investigation Phase 2 | Notice | Closed | 28/11/18 | K: GBP 2.5m to 5m | 22/11/18 |
Fusion JV / 11814 / 00027: AWE2b – Habitat Translo... | Notice | Closed | 21/12/18 | Not Disclosed | 21/11/18 |
WP023b 2019 ecological surveys | Notice | Closed | 25/11/18 | I: GBP 500k to 1m | 20/11/18 |
Fusion JV / 00026 Traffic Management | Notice | Closed | 14/12/18 | I: GBP 500k to 1m | 20/11/18 |
Fusion JV / 00xxx: Template | Notice | Closed | 14/12/18 | I: GBP 500k to 1m | 20/11/18 |
HS2 MWC North - Topographical Surveys | Notice | Awarded | 23/11/18 | Not Disclosed | 09/11/18 |
HS2 MWC North - Design and Construction of Compounds. | Notice | Closed | 12/11/18 | Not Disclosed | 05/11/18 |
HS2 Main Works S1 & S2 - WP102 - Precast Tunnel Segments | Notice | Closed | 06/11/18 | T: GBP 100m - 250m | 30/10/18 |
Low Carbon Materials Innovation Challenge copy | Notice | Withdrawn | 26/10/18 | Not Disclosed | 23/10/18 |
HS2 MWC North - Temporary CCTV | Notice | Closed | 24/10/18 | Not Disclosed | 11/10/18 |
HS2 MWC North - Traffic Management | Notice | Closed | 19/10/18 | Not Disclosed | 05/10/18 |
HS2 MWC North - Temporary Vehicle Restraint Systems | Notice | Awarded | 18/10/18 | Not Disclosed | 05/10/18 |
HS2 MWC North - Traffic Signs | Notice | ITT Issued | 18/10/18 | Not Disclosed | 04/10/18 |
HS2 MWC North - Street Lighting | Notice | Closed | 18/10/18 | Not Disclosed | 04/10/18 |
HS2 MWC North - Safety Barriers | Notice | Closed | 18/10/18 | Not Disclosed | 04/10/18 |
HS2 MWC North - Motorway Communications | Notice | Closed | 18/10/18 | Not Disclosed | 04/10/18 |
HS2 MWC North - Printing Mail Fulfilment | Notice | ITT Issued | 18/10/18 | Not Disclosed | 04/10/18 |
HS2 MWC North - Roadworks Vehicle Recovery Services copy | Notice | Closed | 18/10/18 | Not Disclosed | 04/10/18 |
HS2 MWC North - Portable Variable Message Signs (pVMS) | Notice | Closed | 15/10/18 | Not Disclosed | 04/10/18 |
HS2 MWC North - TASCAR | Notice | Closed | 16/10/18 | Not Disclosed | 04/10/18 |
HS2 MWC North - Permanent and Temporary Road Marking for Roadworks | Notice | Closed | 16/10/18 | Not Disclosed | 04/10/18 |
HS2 MWC North - Roadworks Vehicle Recovery Services | Notice | Closed | 15/10/18 | Not Disclosed | 04/10/18 |
HS2 MWC North - Site Clearance | Notice | Awarded | 17/10/18 | Not Disclosed | 03/10/18 |
HS2 MWC North - Temporary Fencing | Notice | Awarded | 17/10/18 | Not Disclosed | 03/10/18 |
HS2 MWC North - Cabins/Modular Units (Tender extension) | Notice | Closed | 08/10/18 | Not Disclosed | 02/10/18 |
Compound Civil Engineering Works | Notice | Awarded | 05/10/18 | N: GBP 10m - 20m | 28/09/18 |
HS2 EWC Area South - WP039 D B Cargo Shed - Ground Remediation | Notice | Cancelled | 04/10/18 | J: GBP 1m to 2.5m | 28/09/18 |
Open Innovation Challenge | Notice | Cancelled | 31/10/18 | Not Disclosed | 26/09/18 |
HS2 MWC North - Mail Fulfillment Contractor | Notice | Closed | 09/10/18 | Not Disclosed | 26/09/18 |
HS2 MWC North - Cabins/Modular Units | Notice | Closed | 26/09/18 | Not Disclosed | 20/09/18 |
Site Accommodation | Notice | Awarded | 24/09/18 | M: GBP 5m - 10m | 17/09/18 |
WP011 Utility Purging and Disconnections | Notice | Cancelled | 21/09/18 | Not Disclosed | 17/09/18 |
HS2 MWC North - Utilities (Design & Construct) | Notice | Awarded | 01/10/18 | R: GBP 50m - 70m | 11/09/18 |
HS2 MWC North - CL:AIRE Quality Persons | Notice | Closed | 18/09/18 | Not Disclosed | 11/09/18 |
HS2 MWCC Central C1 Permanent Works Category 3 (CAT 3) check | Notice | Closed | 11/09/18 | M: GBP 5m - 10m | 05/09/18 |
Plant Safety Innovation Challenge | Notice | Cancelled | 14/09/18 | Not Disclosed | 31/08/18 |
HS2 MWC North - Temporary Works Professional Services | Notice | Closed | 03/09/18 | H: GBP 250k to 500k | 13/08/18 |
HS2 MWC North - Lifting of Precast U beams | Notice | Closed | 19/08/18 | O: GBP 20m - 30m | 03/08/18 |
HS2 MWC North - Earthworks package | Notice | Awarded | 13/08/18 | Not Disclosed | 30/07/18 |
HS2 MWC North - Precast Beam Transportation Study | Notice | Closed | 29/07/18 | A: Up to GBP 5k | 27/07/18 |
HS2 MWC North - Slurry Treatment Plants (STP) | Notice | Closed | 03/08/18 | O: GBP 20m - 30m | 24/07/18 |
HS2 MWC North - Short Line Bed Moulds For Precast Segments (Viaducts) | Notice | Awarded | 17/08/18 | M: GBP 5m - 10m | 24/07/18 |
HS2 Main Works Civils for N1 & N2 - Supplementary Ground Investigation Works | Notice | Closed | 06/08/18 | Not Disclosed | 20/07/18 |
HS2 MWC North - Heavy Haulage - Transportation of Precast Units | Notice | Closed | 03/08/18 | M: GBP 5m - 10m | 17/07/18 |
Steelwork and Cladding Modification incorporating Associated Civils and M&E works | Notice | Closed | 15/07/18 | Not Disclosed | 15/07/18 |
Dust Monitoring to perimeter of demolition sites | Notice | Closed | 20/07/18 | Not Disclosed | 15/07/18 |
HS2 MWC North - Demolition Works | Notice | Awarded | 27/07/18 | N: GBP 10m - 20m | 13/07/18 |
HS2 EWC Area South - Muckaway Euston Area | Notice | Awarded | 20/07/18 | J: GBP 1m to 2.5m | 13/07/18 |
Noise / Accoustic Barrier Innovation Challenge | Notice | Cancelled | 31/07/18 | Not Disclosed | 05/07/18 |
HS2 MWC North - Civil Engineering Packages | Notice | Closed | 15/07/18 | N: GBP 10m - 20m | 28/06/18 |
HS2 MWC North - Noise, Vibration and Dust monitoring | Notice | Awarded | 25/06/18 | Not Disclosed | 19/06/18 |
WP46 Site Clearance 2018/2019 - Fencing | Notice | Awarded | 15/06/18 | Not Disclosed | 10/06/18 |
Temporary Traffic Management Design Consultancy Package | Notice | Awarded | 13/06/18 | Not Disclosed | 06/06/18 |
HS2 EWC Area South - LU Substation & Vent Shaft - ... | Notice | Withdrawn | 06/06/18 | H: GBP 250k to 500k | 01/06/18 |
HS2 EWC Area South - LU Substation & Vent Shaft - Reinforced Concrete Works | Notice | Cancelled | 06/06/18 | H: GBP 250k to 500k | 01/06/18 |
HS2 Main Works S1 & S2 - WP031 - Instrumentation and Monitoring (I&M) | Notice | Awarded | 10/06/18 | M: GBP 5m - 10m | 01/06/18 |
Fusion JV / 11814 / 00024: AWE2c – Construction of Advanced Planting Sites | Notice | Awarded | 07/06/18 | Not Disclosed | 30/05/18 |
HS2 Main Works S1 & S2 - WP057 - Ground water control / dewatering (pump system) | Notice | Awarded | 08/06/18 | Not Disclosed | 30/05/18 |
WP11b -Temporary Car Park | Notice | Closed | 04/06/18 | I: GBP 500k to 1m | 30/05/18 |
WP53a - Time lapse photography | Notice | Closed | 06/06/18 | Not Disclosed | 30/05/18 |
Fusion JV / 00025 Security 2018 | Notice | Awarded | 31/05/18 | Not Disclosed | 24/05/18 |
HS2 MWC North - Parapet | Notice | Closed | 25/05/18 | Not Disclosed | 18/05/18 |
HS2 MWC North - Precast Concrete Tunnel Segments (Supply Only) | Notice | Awarded | 18/05/18 | Q: GBP 40m - 50m | 14/05/18 |
HS2 Main Works S1 & S2 - WP041 and WP043 - Transpo... | Notice | ITT Issued | 15/05/18 | O: GBP 20m - 30m | 10/05/18 |
HS2 MWC North - Tunnel Boring Machines | Notice | Awarded | 14/05/18 | O: GBP 20m - 30m | 10/05/18 |
HS2 MWC North - Defect Surveys | Notice | ITT Issued | 14/05/18 | N: GBP 10m - 20m | 09/05/18 |
HS2 MWC North - Reinforcement | Notice | Awarded | 11/05/18 | T: GBP 100m - 250m | 06/05/18 |
HS2 MWC North - Reinforced Concrete | Notice | Awarded | 11/05/18 | R: GBP 50m - 70m | 06/05/18 |
HS2 MWC North - Aggregates | Notice | Awarded | 11/05/18 | T: GBP 100m - 250m | 06/05/18 |
HS2 MWC North - Road Wagons/Vehicles | Notice | Awarded | 11/05/18 | T: GBP 100m - 250m | 06/05/18 |
HS2 MWC North - Plant ( Purchase) | Notice | ITT Issued | 11/05/18 | R: GBP 50m - 70m | 06/05/18 |
HS2 MWC North - Utility Diversions | Notice | Awarded | 11/05/18 | Q: GBP 40m - 50m | 06/05/18 |
HS2 MWC North - Plant (Hire) | Notice | Awarded | 11/05/18 | T: GBP 100m - 250m | 06/05/18 |
HS2 MWC North - Surfacing | Notice | Awarded | 08/05/18 | Q: GBP 40m - 50m | 06/05/18 |
HS2 MWC North - Labour | Notice | Awarded | 11/05/18 | T: GBP 100m - 250m | 06/05/18 |
HS2 MWC North - Site Security | Notice | Awarded | 11/05/18 | Not Disclosed | 03/05/18 |
HS2 MWC North - Traffic Management | Notice | Awarded | 11/05/18 | R: GBP 50m - 70m | 03/05/18 |
HS2 MWC North - Planning and project control support | Notice | Awarded | 11/05/18 | Not Disclosed | 03/05/18 |
HS2 MWC North - Site Vehicles | Notice | Awarded | 09/05/18 | C: GBP 15k to 25k | 03/05/18 |
WP.105: EP-094: Traffic Management Design Services... | Notice | Withdrawn | 07/10/17 | Not Disclosed | 02/05/18 |
HS2 Main Works S1 & S2 - WP060 -Ready Mixed Concrete Supply | Notice | Awarded | 09/05/18 | Not Disclosed | 29/04/18 |
HS2 EWC Area South - Permanent Accommodation (Up to 15 Years) | Notice | Cancelled | 02/05/18 | Not Disclosed | 26/04/18 |
WP.105: EP-093: Utilities Planning Services (P) | Notice | Withdrawn | 24/10/17 | Not Disclosed | 26/04/18 |
WP.105: EP-095: Earthworks opportunity analysis (P... | Notice | Withdrawn | 07/10/17 | Not Disclosed | 26/04/18 |
WP.06: SP-021; Earthworks & Remediation Subcontrac... | Notice | Withdrawn | 29/11/17 | L: above GBP 5m | 26/04/18 |
Fusion JV / 00023: Bat House Construction | Notice | ITT Issued | 01/05/18 | Not Disclosed | 25/04/18 |
Fusion JV / 00022: Fencing | Notice | Awarded | 25/04/18 | Not Disclosed | 18/04/18 |
HS2 EWC Area South - S2 Demolitions - Catering Services | Notice | Awarded | 20/04/18 | Not Disclosed | 16/04/18 |
HS2 Main Works S1 & S2 - WP051 - Freight Operating Services | Notice | Awarded | 27/04/18 | S: GBP 70m - 100m | 15/04/18 |
HS2 Main Works S1 & S2 - WP048 - Wagons | Notice | Awarded | 27/04/18 | O: GBP 20m - 30m | 15/04/18 |
HS2 EWC Area South - Level 1 Security | Notice | Awarded | 18/04/18 | K: GBP 2.5m to 5m | 12/04/18 |
HS2 MWC North - CAT III | Notice | Awarded | 13/04/18 | Not Disclosed | 09/04/18 |
HS2 MWC North - Personal protective equipment | Notice | Awarded | 13/04/18 | Not Disclosed | 09/04/18 |
HS2 MWC North - Dewatering Consultancy | Notice | Awarded | 06/04/18 | D: GBP 25k to 50k | 05/04/18 |
HS2 EWC Area South - LU Substation & Vent Shaft - Piling Works v2 | Notice | Awarded | 11/04/18 | I: GBP 500k to 1m | 05/04/18 |
HS2 EWC Area South - LU Substation & Vent Shaft - ... | Notice | Withdrawn | 11/04/18 | I: GBP 500k to 1m | 05/04/18 |
SP-010 WP16 Curzon Street Remediation | Notice | Cancelled | 11/04/18 | Not Disclosed | 04/04/18 |
HS2 EWC Area South - MEP Tag & Trace | Notice | Awarded | 04/04/18 | F: GBP 100k to 150k | 29/03/18 |
HS2 Main Works S1 & S2 - WP109 - Conveyor System S1/S2 | Notice | Awarded | 11/04/18 | L: above GBP 5m | 28/03/18 |
HS2 Main Works S1 & S2 - WP101 - TBM S1/S2 | Notice | Cancelled | 11/04/18 | L: above GBP 5m | 28/03/18 |
HS2 EWC Area South - Traffic Marshalling | Notice | Awarded | 09/04/18 | L: above GBP 5m | 28/03/18 |
Fusion JV / 11814 / 00021: AWE2b – Habitat Translo... | Notice | ITT Issued | 28/03/18 | Not Disclosed | 27/03/18 |
HS2 Main Works S1 & S2 - WP165 - TBM Atlas Road Tunnel 2nd hand | Notice | Cancelled | 30/03/18 | J: GBP 1m to 2.5m | 23/03/18 |
HS2 MWC North - Precast Concrete Bridge Beams | Notice | Awarded | 08/03/18 | L: above GBP 5m | 01/03/18 |
HS2 Main Works Civil Engineering Contract S1 & S2 - Security Vetting | Notice | Awarded | 06/03/18 | E: GBP 50k to 100k | 28/02/18 |
HS2 Main Works Civil Engineering Contract S1 & S2 - Courier Services | Notice | Cancelled | 02/03/18 | B: GBP 5k to 15k | 22/02/18 |
HS2 Main Works Civil Engineering Contract S1 & S2 - Catering Services | Notice | Cancelled | 02/03/18 | B: GBP 5k to 15k | 22/02/18 |
HS2 Main Works Civil Engineering Contract S1 & S2 - Printing Services | Notice | Cancelled | 02/03/18 | D: GBP 25k to 50k | 22/02/18 |
HS2 MWC North - Steel structures_2 | Notice | Awarded | 21/02/18 | L: above GBP 5m | 15/02/18 |
Fusion JV / 11814 / 00020: AWE2 – Advanced Planting & Habitat Translocation Design | Notice | Awarded | 19/02/18 | Not Disclosed | 12/02/18 |
Fusion JV / 12424: DC3F/G/H Highways Works | Notice | Awarded | 08/02/18 | Not Disclosed | 31/01/18 |
HS2 EWC Area South - Taxi Rank Redevelopment | Notice | Awarded | 06/02/18 | J: GBP 1m to 2.5m | 30/01/18 |
Fusion JV / 00019: AWE1c Area Wide Environmental – Species Translocation | Notice | ITT Issued | 07/02/18 | Not Disclosed | 29/01/18 |
HS2 MWC North - Concrete Supply | Notice | Awarded | 02/02/18 | L: above GBP 5m | 24/01/18 |
HS2 MWC North - Utility Survey (C2 & GPR) | Notice | Awarded | 26/01/18 | Not Disclosed | 19/01/18 |
Fusion JV / 11814: Lead Designer | Notice | Awarded | 22/01/18 | Not Disclosed | 16/01/18 |
HS2 MWC North LIDAR Survey | Notice | Awarded | 22/01/18 | Not Disclosed | 15/01/18 |
HS2 Main Works Civil Engineering Contract S1 & S2 - Excavated Material Disposal Points | Notice | Awarded | 19/01/18 | Not Disclosed | 04/01/18 |
AW6 Civils Framework | Notice | Awarded | 15/01/18 | J: GBP 1m to 2.5m | 22/12/17 |
Fusion JV / 00018 Environmental Emergency Spill Response | Notice | ITT Issued | 10/01/18 | Not Disclosed | 21/12/17 |
HS2 EWC Area South - Vehicle Management Planning System | Notice | Awarded | 19/12/17 | Not Disclosed | 11/12/17 |
HS2 Main Works Civil Engineering Contract S1 & S2 Grounds Investigation Package | Notice | Awarded | 15/12/17 | J: GBP 1m to 2.5m | 11/12/17 |
HS2 EWC Area South - PO 085 - Seed and Aquatic Plants | Notice | Cancelled | 19/12/17 | Not Disclosed | 11/12/17 |
HS2 - EWC South - Noise Insulation (Secondary Glazing) Euston Area | Notice | Awarded | 11/12/17 | Not Disclosed | 05/12/17 |
HS2 Main Works Civil Engineering Contract S1 & S2 ... | Notice | Withdrawn | 06/12/17 | J: GBP 1m to 2.5m | 04/12/17 |
HS2 EWC Area South - Granby Terrace Bridge - Specialist Lifting | Notice | Cancelled | 06/12/17 | Not Disclosed | 29/11/17 |
HS2 Enabling Works Area South - Euston Area (Granby Terrace Bridge) | Notice | Cancelled | 04/12/17 | Not Disclosed | 27/11/17 |
WP46 De-Vegetation and Tree Clearance | Notice | Awarded | 17/11/17 | Not Disclosed | 10/11/17 |
HS2 MWC North - Stationary | Notice | Awarded | 15/11/17 | D: GBP 25k to 50k | 07/11/17 |
HS2 MWC North - Quantity Measurement Services | Notice | Awarded | 15/11/17 | J: GBP 1m to 2.5m | 07/11/17 |
HS2 EWC Area South - NTH Compound Pop-up Garden | Notice | Cancelled | 09/11/17 | Not Disclosed | 02/11/17 |
Fusion JV / 00016: AWE4 - Invasive Species Treatment and Control | Notice | Awarded | 07/11/17 | C: GBP 15k to 25k | 01/11/17 |
WP050 Lawley Middleway; Existing Speed Survey | Notice | Cancelled | 06/11/17 | Not Disclosed | 01/11/17 |
Euston area, NTH and ESG Site Compounds - Logistics | Notice | Cancelled | 01/11/17 | Not Disclosed | 26/10/17 |
HS2 Enabling Works - Civil Works (Bell Mouth and Driveway) | Notice | Cancelled | 30/10/17 | Not Disclosed | 24/10/17 |
HS2 EWC Area South - Granby Terrace Bridge - High ... | Notice | Cancelled | 31/10/17 | Not Disclosed | 23/10/17 |
HS2 EWC Area South - Granby Terrace Bridge - Track... | Notice | Cancelled | 31/10/17 | Not Disclosed | 23/10/17 |
WP.11: SP-012; Demolition Sub Contract Minor | Notice | Withdrawn | 29/10/17 | K: GBP 2.5m to 5m | 23/10/17 |
Traffic Management | Notice | Closed | 27/10/17 | Not Disclosed | 17/10/17 |
HS2 EWC Area South - Granby Terrace Bridge - Reinforced Concrete | Notice | Cancelled | 31/10/17 | Not Disclosed | 17/10/17 |
HS2 EWC Area South - Granby Terrace Bridge - Primary Support Structure (Beams) | Notice | Cancelled | 31/10/17 | Not Disclosed | 17/10/17 |
Earthworks (Removal of stockpiles) Willesden Area - HS2 Enabling Works South Delivery | Notice | Awarded | 23/10/17 | Not Disclosed | 17/10/17 |
HS2 EWC Area South - Granby Terrace Bridge - Highway Works and Finishing | Notice | Cancelled | 31/10/17 | Not Disclosed | 17/10/17 |
WP.27: EP-002-005: Noise and Vibration Mitigation Works - Acoustic Fencing | Notice | Closed | 23/10/17 | Not Disclosed | 16/10/17 |
WP.27: EP-002-005: Noise and Vibration Mitigation Works - Double Glazing | Notice | Closed | 23/10/17 | Not Disclosed | 16/10/17 |
Earthworks (Including piling mats) - HS2 Enabling Works South Delivery | Notice | Cancelled | 30/10/17 | Not Disclosed | 16/10/17 |
Green Hoarding | Notice | Cancelled | 20/10/17 | Not Disclosed | 16/10/17 |
HS2 EWC Area South - Willesden Euroterminal Prepar... | Notice | Closed | 18/10/17 | Not Disclosed | 12/10/17 |
HS2 EWC Area South - Willesden Euroterminal Preparation - Movement of Gantry Cranes | Notice | Closed | 18/10/17 | Not Disclosed | 11/10/17 |
HS2 EWC Area South - Willesden Euroterminal Preparation - High Voltage Works | Notice | Closed | 17/10/17 | Not Disclosed | 11/10/17 |
HS2 EWC Area South - Willesden Euroterminal Preparation - Disposal of Old Freight Wagon Stock | Notice | Closed | 17/10/17 | Not Disclosed | 10/10/17 |
Costain Skanska JV - HS2 cleaners part time Regents Park | Notice | Cancelled | 29/10/17 | Not Disclosed | 06/10/17 |
Tag and Trace of HV (high voltage), LV (low voltage), signalling & telecoms services - HS2 Enabling Works South Delivery | Notice | Awarded | 13/10/17 | Not Disclosed | 06/10/17 |
Fusion JV / 00015: Mitigation Site Creation - Utility Survey Scope | Notice | Awarded | 10/10/17 | G: GBP 150k to 250k | 03/10/17 |
Costain Skanska JV - HS2 South - Full time cleaning services | Notice | Cancelled | 06/10/17 | Not Disclosed | 29/09/17 |
WP.27: EP-002-005: Noise and Vibration Mitigation ... | Notice | Cancelled | 02/10/17 | Not Disclosed | 29/09/17 |
WP.34: Invasive Species Mitigation | Notice | Closed | 29/09/17 | Not Disclosed | 21/09/17 |
Civils Frameworks | Notice | Closed | 08/09/17 | Not Disclosed | 25/08/17 |
Fusion JV / 00014: DC1G TBM Power Supply - Detailed Design & Construction | Notice | Awarded | 01/09/17 | Not Disclosed | 24/08/17 |
HS2 - EWC South - Victoria Road Priority Cycle Scheme | Notice | Awarded | 30/08/17 | Not Disclosed | 23/08/17 |
Flood Risk Assessments and flood risk management plans | Notice | Cancelled | 23/08/17 | Not Disclosed | 16/08/17 |
Land Access Support Services | Notice | Awarded | 21/08/17 | Not Disclosed | 16/08/17 |
WP41, WP42, WP43 – Ecological Mitigation Works | Notice | Closed | 18/08/17 | Not Disclosed | 11/08/17 |
WP.40-44: EP-029-043: Ecological Mitigation | Notice | Withdrawn | 11/10/17 | Not Disclosed | 11/08/17 |
HS2 EWC - Area South - Hydraulic Fluvial Modelling | Notice | Cancelled | 18/08/17 | Not Disclosed | 11/08/17 |
Framework Agreement for the Supply and Operation of Vacuum Excavators | Notice | Cancelled | 25/08/17 | Not Disclosed | 09/08/17 |
WP.110: EP-097-98; Wayfinding | Notice | Cancelled | 21/08/17 | Not Disclosed | 08/08/17 |
Framework agreement for Reinstatement Works (Utili... | Notice | Cancelled | 08/08/17 | Not Disclosed | 03/08/17 |
Framework agreement - Strengthening Works (abutments and retaining walls) | Notice | Cancelled | 09/08/17 | Not Disclosed | 02/08/17 |
Framework agreement - Possession planning | Notice | Cancelled | 09/08/17 | Not Disclosed | 02/08/17 |
Framework agreement for Highway and Public Rights ... | Notice | Cancelled | 08/08/17 | Not Disclosed | 02/08/17 |
Framework Agreement for Waste Management | Notice | Awarded | 08/08/17 | Not Disclosed | 02/08/17 |
Framework agreement for Site sewer, water and drai... | Notice | Awarded | 08/08/17 | Not Disclosed | 02/08/17 |
Framework agreement for Vegetation Clearance | Notice | Awarded | 08/08/17 | Not Disclosed | 02/08/17 |
Framework Agreement for Cutting, Sawing & Drilling | Notice | Awarded | 08/08/17 | Not Disclosed | 02/08/17 |
Framework agreement for Asset tagging | Notice | Awarded |