| Beach Landing Facility (BLF) - Sizewell C | Notice | Open | 11/12/25 | Not Disclosed | 27/11/25 |
| Remuneration Adviser to Sizewell C Nomination & Remuneration Committee (Nom/RemCo) | Notice | Closed | 28/11/25 | Not Disclosed | 21/11/25 |
| Sizewell C - Ransomes Way Bus Maintenance Depot | Notice | Closed | 26/11/25 | Not Disclosed | 13/11/25 |
| ENW000-118 Geotechnical Capping Beams copy | Notice | Closed | 23/11/25 | O: GBP 20m - 30m | 07/11/25 |
| ENW000-118 Geotechnical Capping Beams | Notice | Withdrawn | 30/11/25 | O: GBP 20m - 30m | 07/11/25 |
| ENW000-121-MBIF Lighting and Associated Works | Notice | Closed | 23/11/25 | J: GBP 1m to 2.5m | 07/11/25 |
| ENW000-121-MBIF Lighting and Associated Works | Notice | Withdrawn | 30/11/25 | J: GBP 1m to 2.5m | 07/11/25 |
| ENW000-123-Environmental Response Preparedness | Notice | Closed | 23/11/25 | Not Disclosed | 07/11/25 |
| ENW000-123-Environmental Response Preparedness | Notice | Withdrawn | 30/11/25 | Not Disclosed | 07/11/25 |
| Sizewell C (CWA) - Reinforcement Cut & Bend Plant, Equipment and Machinery | Notice | Closed | 14/11/25 | N: GBP 10m - 20m | 06/11/25 |
| Sizewell C - UXO Investigation and Clearance (Intertidal and nearshore) - Enabling Works | Notice | Closed | 11/11/25 | Not Disclosed | 31/10/25 |
| UXO Survey and Investigation | Notice | Closed | 31/10/25 | Not Disclosed | 21/10/25 |
| SZC - Main Works Earthworks - Bulk Excavation | Notice | Closed | 31/10/25 | T: GBP 100m - 250m | 17/10/25 |
| Slurry Treatment Plant Package (STP) | Notice | Closed | 27/10/25 | Not Disclosed | 14/10/25 |
| SZC Avonmouth Hub (Bristol) - Piling - Stage 2 | Notice | Closed | 20/10/25 | Not Disclosed | 10/10/25 |
| Sizewell C (CWA) - Supply of Tower Cranes and Ancillary Services | Notice | Closed | 24/10/25 | Not Disclosed | 10/10/25 |
| Sizewell C (CWA) - Heavy Load Crane (Hire/Purchase) | Notice | Closed | 24/10/25 | Not Disclosed | 10/10/25 |
| Construction Resourcing Alliance | Notice | Closed | 21/10/25 | Not Disclosed | 06/10/25 |
| EOI - Sizewell C Early Careers Recruitment Managed Service Provision | Notice | Closed | 10/10/25 | Not Disclosed | 01/10/25 |
| Matter Management solution | Notice | ITT Issued | 08/10/25 | H: GBP 250k to 500k | 25/09/25 |
| Embedded Plates | Notice | Closed | 07/10/25 | Not Disclosed | 23/09/25 |
| EOI template for users - Template copy - Template copy - Template copy - Template copy - Template copy | Notice | Closed | 26/09/25 | G: GBP 150k to 250k | 19/09/25 |
| Sizewell C - EW322 Surface Water Management Phase 2 | Notice | Closed | 03/10/25 | O: GBP 20m - 30m | 19/09/25 |
| SZC Avonmouth Hub (Bristol) - Piling | Notice | Closed | 03/10/25 | Not Disclosed | 19/09/25 |
| Steel Casings & Liners Fabrication | Notice | Closed | 23/09/25 | Not Disclosed | 10/09/25 |
| Accommodation Campus - Site Wide temporary electrical, water distribution and safety infrastructure | Notice | Closed | 14/09/25 | M: GBP 5m - 10m | 10/09/25 |
| SZC - Additional Site Investigations | Notice | Closed | 14/09/25 | Not Disclosed | 05/09/25 |
| Accommodation Campus - Site Wide Logistics | Notice | Closed | 12/09/25 | M: GBP 5m - 10m | 28/08/25 |
| Sizewell C - College on the Coast / Centre of Excellence Design and Build Package | Notice | Closed | 10/09/25 | Not Disclosed | 26/08/25 |
| Sizewell C (CWA) - Marine Shaft Installation | Notice | Closed | 05/09/25 | Not Disclosed | 21/08/25 |
| Sizewell C (CWA) - Head Transportation and Installation | Notice | Closed | 05/09/25 | Not Disclosed | 21/08/25 |
| Sizewell C (CWA) - Dredging and Rock Installation | Notice | Closed | 05/09/25 | R: GBP 50m - 70m | 21/08/25 |
| Sizewell C - Site Operations - Water Storage Facility at Orwell Logistics Park Operation & Maintenance | Notice | Closed | 29/08/25 | Not Disclosed | 19/08/25 |
| SZC - Temporary Sea Defence (TSD) - Rock Armour - Supply and Install | Notice | Closed | 13/08/25 | Not Disclosed | 05/08/25 |
| MBIF Fenders and Bollards | Notice | Closed | 15/08/25 | F: GBP 100k to 150k | 01/08/25 |
| Potable Water Storage Facility copy | Notice | Closed | 07/08/25 | Not Disclosed | 30/07/25 |
| Portable Water Storage Facility | Notice | Withdrawn | 07/08/25 | Not Disclosed | 30/07/25 |
| Sizewell C - RPE Pipework | Notice | Closed | 20/07/25 | Not Disclosed | 14/07/25 |
| Expression of Interest - SZC - Caterer (12-month) | Notice | Closed | 15/07/25 | Not Disclosed | 08/07/25 |
| The procurement of the Lenders Technical Advisor | Notice | Closed | 14/07/25 | Not Disclosed | 08/07/25 |
| The Procurement of Marine Shared Services SOP000-016 | Notice | Closed | 14/07/25 | R: GBP 50m - 70m | 30/06/25 |
| SIE000-065 TCA Foul Treatment Plants | Notice | Closed | 27/06/25 | Not Disclosed | 19/06/25 |
| Accommodation Campus - Amenity Buildings MEP | Notice | Closed | 04/07/25 | M: GBP 5m - 10m | 19/06/25 |
| Accommodation Campus - Accommodation Buildings MEP | Notice | Closed | 04/07/25 | P: GBP 30m - 40m | 19/06/25 |
| Accommodation Campus - Accommodation Buildings Passenger Lift | Notice | Closed | 04/07/25 | I: GBP 500k to 1m | 19/06/25 |
| Accommodation Campus - Amenity Building Passenger Lift | Notice | Closed | 04/07/25 | H: GBP 250k to 500k | 19/06/25 |
| Accommodation Campus - Campus site wide hard and soft landscapes | Notice | Closed | 04/07/25 | O: GBP 20m - 30m | 19/06/25 |
| Emergency Response and medical treatment service | Notice | Closed | 20/06/25 | M: GBP 5m - 10m | 16/06/25 |
| Civil Works for TPF Set Up and Segment Storage Yard | Notice | Closed | 25/06/25 | Not Disclosed | 16/06/25 |
| SZC - Steel Cylinder Concrete Pipes | Notice | Closed | 17/06/25 | M: GBP 5m - 10m | 11/06/25 |
| MBIF Guardrails and Handrails Supply | Notice | Closed | 20/06/25 | K: GBP 2.5m to 5m | 09/06/25 |
| Sizewell C - Super Duplex Embedded Items (Including Lifting Lugs) | Notice | Closed | 19/06/25 | N: GBP 10m - 20m | 03/06/25 |
| Fuel Distribution Facility | Notice | Withdrawn | 28/05/25 | I: GBP 500k to 1m | 22/05/25 |
| Accommodation Campus - Amenity Building Roofing | Notice | Closed | 30/05/25 | K: GBP 2.5m to 5m | 16/05/25 |
| Fuel Supply and Fuel Facility | Notice | Closed | 28/05/25 | P: GBP 30m - 40m | 16/05/25 |
| Accommodation Campus - Amenity Building Facade/Glazing | Notice | Closed | 30/05/25 | J: GBP 1m to 2.5m | 16/05/25 |
| Accommodation Campus - Accommodation Buildings Foundations | Notice | Closed | 30/05/25 | M: GBP 5m - 10m | 16/05/25 |
| Accommodation Campus - Accommodation Buildings Facade | Notice | Closed | 30/05/25 | O: GBP 20m - 30m | 16/05/25 |
| Accommodation Campus - Accommodation Buildings Bathroom Pods | Notice | Closed | 30/05/25 | M: GBP 5m - 10m | 16/05/25 |
| Accommodation Campus - Accommodation Buildings Roof | Notice | Closed | 30/05/25 | N: GBP 10m - 20m | 16/05/25 |
| Accommodation Campus - Accommodation Buildings Steel Frame | Notice | Closed | 30/05/25 | P: GBP 30m - 40m | 16/05/25 |
| Supply of Mechanical & Electrical (M&E) Equipment for the Water Management Zones (WMZ) at Sizewell C site | Notice | Closed | 28/05/25 | I: GBP 500k to 1m | 15/05/25 |
| Facilities Management | Notice | Closed | 02/06/25 | Not Disclosed | 13/05/25 |
| Fuel Supply | Notice | Closed | 28/05/25 | I: GBP 500k to 1m | 08/05/25 |
| The Procurement of Marine Shared Services | Notice | Closed | 02/05/25 | R: GBP 50m - 70m | 16/04/25 |
| Sizewell C Site Establishment – North plaza | Notice | Closed | 16/04/25 | R: GBP 50m - 70m | 03/04/25 |
| Pile Testing - Marine Bulk Import Facility - Sizewell C | Notice | Cancelled | 04/04/25 | Not Disclosed | 31/03/25 |
| Sizewell C - CWA Batching Plant - Plant | Notice | Closed | 25/03/25 | Not Disclosed | 17/03/25 |
| Expression of Interest SZC - Main Catering | Notice | Closed | 21/03/25 | Not Disclosed | 11/03/25 |
| Sizewell C - Temporary Works Design Framework | Notice | Closed | 10/03/25 | Not Disclosed | 20/02/25 |
| SOP000-012 Utilities Maintenance and Operation | Notice | Closed | 05/03/25 | Not Disclosed | 19/02/25 |
| SOP000-073 Water Storage Facility - Orwell Logistics Park | Notice | Closed | 03/03/25 | Not Disclosed | 18/02/25 |
| Sizewell C - CWA Temporary Workshops | Notice | Closed | 26/02/25 | M: GBP 5m - 10m | 14/02/25 |
| Weld Procedure and Testing Service - MBIF (Marine Bulk Import Facility) | Notice | Cancelled | 21/02/25 | Not Disclosed | 09/02/25 |
| Plant and Equipment - MBIF (Marine Bulk Import Facility) | Notice | Cancelled | 21/02/25 | Not Disclosed | 09/02/25 |
| General Site Civils - MBIF (Marine Bulk Import Facility) | Notice | Cancelled | 21/02/25 | Not Disclosed | 09/02/25 |
| Piles Transportation - MBIF (Marine Bulk Import Facility) | Notice | Closed | 14/02/25 | Not Disclosed | 03/02/25 |
| Piles Transportation - MBIF (Marine Bulk Import Facility) copy | Notice | Withdrawn | 14/02/25 | Not Disclosed | 03/02/25 |
| Safety Boat - MBIF (Marine Bulk Import Facility) | Notice | Cancelled | 14/02/25 | Not Disclosed | 31/01/25 |
| Cantitravel Hydraulics - MBIF (Marine Bulk Import Facility) | Notice | Cancelled | 14/02/25 | Not Disclosed | 31/01/25 |
| Accommodation Campus – Amenity Building Steelframe | Notice | Closed | 07/02/25 | J: GBP 1m to 2.5m | 31/01/25 |
| Avonmouth Hub-Office & Welfare | Notice | Closed | 05/02/25 | Not Disclosed | 23/01/25 |
| EoI SZC Main Site Development - HAZ2 & HUY D&B | Notice | Closed | 31/01/25 | P: GBP 30m - 40m | 13/01/25 |
| Tunnel Segment Carousel and Segment Moulds - Refurbishment | Notice | Closed | 10/01/25 | Not Disclosed | 05/12/24 |
| Site Induction Digitised and Interactive Development and Support | Notice | Closed | 15/12/24 | I: GBP 500k to 1m | 03/12/24 |
| SZC Captivating and Immersive Briefing Experience (CIBE) | Notice | ITT Issued | 15/12/24 | M: GBP 5m - 10m | 03/12/24 |
| Sizewell C, Fuel Procurement | Notice | Closed | 06/12/24 | J: GBP 1m to 2.5m | 22/11/24 |
| Sizewell C - Temporary Marine Shafts | Notice | Closed | 05/12/24 | Not Disclosed | 22/11/24 |
| Sizewell C, EV Charging | Notice | Closed | 03/12/24 | J: GBP 1m to 2.5m | 21/11/24 |
| Construction Of Fen Meadow Habitat | Notice | Closed | 29/11/24 | Not Disclosed | 20/11/24 |
| Supply of Auxiliary Steam Boiler System copy | Notice | Closed | 29/11/24 | N: GBP 10m - 20m | 20/11/24 |
| Supply of Auxiliary Steam Boiler System | Notice | Closed | 15/11/24 | N: GBP 10m - 20m | 08/11/24 |
| Sizewell C Fuel Procurement | Notice | Withdrawn | 22/11/24 | M: GBP 5m - 10m | 06/11/24 |
| Rock Armour Supply and Install - Temporary Sea Defence | Notice | Closed | 18/11/24 | Not Disclosed | 28/10/24 |
| Sizewell C - Stainless Steel - Pools, Tanks and Sumps (PTS) | Notice | Closed | 14/10/24 | S: GBP 70m - 100m | 02/10/24 |
| Marine Bulk Import Facility (MBIF) Jetty Head and Dolphins Installation | Notice | Closed | 22/10/24 | Not Disclosed | 01/10/24 |
| Sizewell C. Fire Consultancy Works/067 | Notice | Closed | 10/10/24 | G: GBP 150k to 250k | 01/10/24 |
| Sizewell C, Radio Maintenance Work/031 copy | Notice | Closed | 30/09/24 | J: GBP 1m to 2.5m | 20/09/24 |
| Sizewell C, IT & Communications Work SZC/031 | Notice | Closed | 30/09/24 | J: GBP 1m to 2.5m | 19/09/24 |
| CES - 11kV Infrastructure Design, Build, Supply and Installation | Notice | ITT Issued | 24/09/24 | Not Disclosed | 13/09/24 |
| Utilities - Operate and Maintain | Notice | Closed | 11/09/24 | Not Disclosed | 10/09/24 |
| SOP000-060 Rail Infrastructure Maintenance | Notice | Closed | 19/09/24 | Not Disclosed | 06/09/24 |
| Sizewell C - OSI - Minor Roads | Notice | Closed | 02/09/24 | Not Disclosed | 29/08/24 |
| Ecology Phase 3 Field Execution | Notice | Closed | 23/08/24 | Not Disclosed | 14/08/24 |
| Sizewell C Limited - Interim Fuel Supply | Notice | Closed | 21/08/24 | K: GBP 2.5m to 5m | 13/08/24 |
| Early Works Generators - Expression of Interest | Notice | Closed | 16/08/24 | Not Disclosed | 06/08/24 |
| Infrastructure Maintenance Services and Minor Civils | Notice | Closed | 07/08/24 | Not Disclosed | 25/07/24 |
| SOP000-050 - Personal Protective Equipment (PPE) | Notice | Closed | 29/07/24 | M: GBP 5m - 10m | 15/07/24 |
| SOP000-013 - Environmental Monitoring | Notice | Closed | 29/07/24 | M: GBP 5m - 10m | 15/07/24 |
| SOP000-030 - Waste Management | Notice | Closed | 29/07/24 | N: GBP 10m - 20m | 15/07/24 |
| Sizewell C Limited - SOP000-032 Furniture, Fittings & Equipment (FFE) | Notice | Closed | 22/07/24 | M: GBP 5m - 10m | 12/07/24 |
| Sizewell C - OSI - Vacuum Excavation Services Framework | Notice | Closed | 15/07/24 | Not Disclosed | 28/06/24 |
| Passenger Operations Services | Notice | Closed | 11/07/24 | S: GBP 70m - 100m | 28/06/24 |
| Supply of Static Volumetric Batching Plants (3No.) | Notice | Closed | 02/07/24 | M: GBP 5m - 10m | 20/06/24 |
| Pre-blended Cement - Bulk Deliveries | Notice | Closed | 01/07/24 | O: GBP 20m - 30m | 19/06/24 |
| NOTICE - Sizewell C - Supplier Capability Questionnaire - Rail Sidings Inspection and Maintenance Services | Notice | Closed | 26/06/24 | Not Disclosed | 19/06/24 |
| Offshore piling steelwork | Notice | Closed | 28/06/24 | Not Disclosed | 19/06/24 |
| Precast Concrete Deck Panels | Notice | Closed | 12/06/24 | Not Disclosed | 31/05/24 |
| Structural Steelwork & Offshore piling steelwork | Notice | Closed | 12/06/24 | Not Disclosed | 31/05/24 |
| Nuclear Professional Services Frameworks Agreements | Notice | ITT Issued | 03/06/24 | Not Disclosed | 24/05/24 |
| Permanent Concrete Batching Plant - Civil Works | Notice | Cancelled | 30/05/24 | N: GBP 10m - 20m | 16/05/24 |
| Sizewell C Limited - Bike/e-bike scheme | Notice | Closed | 17/05/24 | Not Disclosed | 09/05/24 |
| Sizewell C Limited - Bike/e-bike scheme | Notice | Withdrawn | 13/05/24 | Not Disclosed | 09/05/24 |
| Opportunity - Concrete Laboratories & Offices | Notice | Closed | 17/05/24 | Not Disclosed | 07/05/24 |
| Expression Of Interest - SZC/MEH Supply Chain Live Event (26 of June 2024) | Notice | Cancelled | 31/05/24 | Not Disclosed | 03/05/24 |
| SOP000-033 - Site Vehicle Fleet | Notice | Closed | 13/05/24 | Not Disclosed | 01/05/24 |
| Electrical Contractors Framework - Expression of Interest | Notice | Cancelled | 06/05/24 | Not Disclosed | 30/04/24 |
| Sizewell C - Offshore Dredging | Notice | Closed | 26/04/24 | K: GBP 2.5m to 5m | 16/04/24 |
| Expression of Interest SZC Associated Development - MDS Roads | Notice | Awarded | 02/04/24 | Not Disclosed | 26/03/24 |
| Expression of Interest SZC Associated Development - Major Roads | Notice | Awarded | 02/04/24 | Not Disclosed | 25/03/24 |
| Expression of Interest SZC Associated Development - Major Roads Roundabouts | Notice | Awarded | 02/04/24 | Not Disclosed | 25/03/24 |
| Sheet Piling Installation - Temporary Sea Defence | Notice | Closed | 01/04/24 | M: GBP 5m - 10m | 06/03/24 |
| Sizewell C Limited - Electric Vehicle Charging network | Notice | Closed | 12/03/24 | Not Disclosed | 05/03/24 |
| Logistics management services, warehouse and freight operations | Notice | Awarded | 05/03/24 | Not Disclosed | 27/02/24 |
| Independent Technical Advisor (ITA) | Notice | Closed | 26/02/24 | Not Disclosed | 19/02/24 |
| Public Right Of Ways | Notice | Closed | 23/02/24 | J: GBP 1m to 2.5m | 12/02/24 |
| Sizewell C Occupational Health and Emergency Response / Minor Injury Service Interim 2 year Contract | Notice | ITT Issued | 22/01/24 | K: GBP 2.5m to 5m | 08/01/24 |
| Desalinisation Plant - EoI | Notice | Awarded | 08/12/23 | Not Disclosed | 24/11/23 |
| Sizewell C - SSSI Crossing Temporary Haul Bridge Steel Beams | Notice | Closed | 21/11/23 | Not Disclosed | 15/11/23 |
| Sizewell C - SSSI Crossing Permanent Bridge - Precast Beams | Notice | Closed | 21/11/23 | Not Disclosed | 15/11/23 |
| Sizewell C - SSSI Crossing - Bailey Bridge | Notice | Closed | 21/11/23 | Not Disclosed | 15/11/23 |
| Sizewell C Reinforcement - Supply | Notice | Closed | 15/11/23 | K: GBP 2.5m to 5m | 09/11/23 |
| Minor Civil Works Framework - EoI | Notice | Withdrawn | 13/11/23 | M: GBP 5m - 10m | 03/11/23 |
| Minor Civil Works Framework - EoI | Notice | Closed | 13/11/23 | Not Disclosed | 03/11/23 |
| 132KV Electrical Connection, Civils & Installation | Notice | Closed | 10/11/23 | M: GBP 5m - 10m | 02/11/23 |
| 132KV Electrical Connection Materials Supply - Cables and Joints | Notice | Closed | 07/11/23 | J: GBP 1m to 2.5m | 31/10/23 |
| Sizewell C - EoI - Associated Development Multi-Storey Carpark | Notice | Closed | 20/11/23 | M: GBP 5m - 10m | 31/10/23 |
| 132KV Electrical Connection Materials Supply | Notice | Awarded | 03/11/23 | J: GBP 1m to 2.5m | 30/10/23 |
| Sizewell C - Sheet Piling (Material Supply) | Notice | Closed | 03/11/23 | M: GBP 5m - 10m | 25/10/23 |
| Expression of Interest Brief SZC Associated Developments - AD1 Park & Ride and Freight Management Facility | Notice | ITT Issued | 29/09/23 | Not Disclosed | 19/09/23 |
| Notice for Package number 1030 Fencing - Construction | Notice | ITT Issued | 19/09/23 | P: GBP 30m - 40m | 07/09/23 |
| Notice of Package number 6002 Construction Electrical Supply - Early and Late | Notice | ITT Issued | 18/09/23 | Q: GBP 40m - 50m | 07/09/23 |
| Sizewell C - Enabling & Earthworks - Imported Backfill Aggregates | Notice | Closed | 23/08/23 | Not Disclosed | 11/08/23 |
| Sizewell C - Enabling & Earthworks - Early Works Concrete | Notice | Closed | 23/08/23 | Not Disclosed | 11/08/23 |
| Temporary Accommodation (Early Welfare) | Notice | Closed | 12/07/23 | Not Disclosed | 06/07/23 |
| ACA and Early Works | Notice | Closed | 13/07/23 | Not Disclosed | 26/06/23 |
| IT&T Early and Late Data | Notice | Closed | 12/07/23 | Not Disclosed | 26/06/23 |
| Compliance and ESG reporting tool | Notice | Closed | 05/05/23 | Not Disclosed | 17/04/23 |
| Project Delivery Organisation Subs Bench | Notice | ITT Issued | 31/10/22 | Not Disclosed | 17/10/22 |